April 23, 2018

Thailand’s Power Development Plan: 2018 Update Expected to Focus on Renewable Energy

Voyageur – A Publication of CanCham Thailand

Introduction

In 2015, the Ministry of Energy revised its Power Development Plan in order to provide a blueprint for Thailand’s energy priorities over the coming two decades. The PDP2015, as the Power Development Plan was called, was itself an update on previous development plans created by the Ministry of Energy in conjunction with the Electricity Generating Authority of Thailand (EGAT), which had last been updated in 2012. Consistent with this pattern, the Power Development Plan will be updated again in 2018 to revise the Ministry’s objectives in light of new facts on the ground.

The PDP2015 was devised as a government master plan alongside the Energy Efficiency Development Plan, the Alternative Energy Development Plan (AEDP), the Natural Gas Supply Plan, and the Petroleum Management Plan. The overarching objectives of the Ministry of Energy’s plans were set as: (1) energy security; (2) economy, and specifically maintaining appropriate costs of power generation and implementing energy efficiency; and (3) ecology, with a particular focus on reducing environmental and social impacts by lessening carbon dioxide intensity of power generation. In order to achieve these objectives, the Ministry of Energy realized that renewable energy sources would have to play a significant role.

AEDP2015

At the end of 2014, Thailand had installed capacity of 7,400.43 megawatts (MW) from renewable energy sources, including hydroelectricity. Of this, solar capacity amounted to 1,298.51 MW, whereas installed wind capacity only amounted to 224.47 MW. The Ministry of Energy set targets for renewable energy constituting approximately 20% of Thailand’s installed capacity by 2036. Targets for 2036 installed capacity for wind and solar were set at 3,002 MW and 6,000 MW, respectively. Given the state of renewables in Thailand at the time, these goals seemed fairly ambitious and many questioned whether the targets were overly optimistic.

By the end of 2017, it has become clear that the naysayers’ pessimism was misplaced. At the end of 2017, installed capacity for wind power had nearly tripled from 2014 levels, to 627.82 MW. Capacity for solar power was 2,692.26 MW at the end of 2017, which amounts to a doubling of generating capacity from 2014. The three years from 2014 to 2017 also saw increased capacity for power plants fueled by biomass, biogas, and municipal solid waste.

With Thailand already nearly halfway to its goal of 6,000 MW of installed solar capacity by 2036, and both demand and supply of solar power showing no signs of slowing down, the target appears to require upward revision. A revised target should be expected in the PDP2018. A report issued in November 2017 by the International Renewable Energy Agency (IRENA) puts 17,200 MW of installed solar photovoltaic (PV) capacity by 2036 as a realistic objective.

Policy Hurdles

Thailand is in the midst of a renewable energy revolution. Just three years ago it seemed fanciful to imagine renewable sources of energy accounting for approximately 20% of Thailand’s installed capacity by 2036; now, it seems feasible to imagine nearly half of the country’s installed capacity coming from renewables in 20 years. Given the abundance of solar energy potential, it is clear that solar PV will be the most significant driver of this revolution. Other renewable sources, such as wind and biomass, will also play significant roles in Thailand’s diversified energy mix. This will present the Ministry of Energy with a number of challenges which will require apt policy-making.

First is the problem of intermittency. Some renewable sources, most notably solar and wind power, can only produce electricity when weather conditions permit. Without sufficient baseload sources of energy, an overreliance on intermittent electricity generating sources may result in rolling blackouts. Technological advances with respect to energy storage, such as through more efficient batteries or pumped storage hydroelectricity, have the potential to reduce the impact of intermittency. The Ministry of Energy has taken the initiative to address this concern by instituting new firm or semi-firm capacity requirements in power purchase agreements (PPAs) with small power producers or very small power producers. The commitments in these PPAs essentially require the power producer to commit to certain specific feed-in targets. This may spur innovation with respect to storage, or lead to further hybrid power producing facilities with multiple fuel sources.

Secondly, the Ministry of Energy must contend with the untapped potential of rooftop solar PV installments in Thailand. At the moment, the inability of most producers to sell electricity generated by rooftop solar PV cells to a power distributor makes it economically difficult to justify incurring the still significant expense of installing PV panels. For factories or large business centres, where electricity use is highest during daylight hours, the economic case is much clearer as most of the electricity which is generated will be consumed immediately. For most residential buildings, by contrast, electricity use is generally higher when the sun is not shining. Without the ability to sell the electricity back to a distributor, there is little incentive for households to install rooftop solar PV panels. The Ministry of Energy has indicated a willingness to introduce a net metering scheme; the challenge will be to ensure that the feed-in-tariff rate is neither too low so as to not properly incentivize households, nor too high so as to cause a strain on government resources.

Conclusion

In 2015, the Ministry of Energy set ambitious targets for renewable energy development in Thailand. It appears now that the 2015 targets were too conservative, and that they will be met ahead of schedule. Thailand’s pivot toward renewables satisfies each of the stated objectives in the PDP2015, namely energy security, economy, and ecology. While a number of policy challenges remain, the potential for continued growth in Thailand’s renewable energy sector is evident.

RELATED INSIGHTS​ 

January 27, 2025
Thailand’s Ministry of Energy (MOE) has announced the launch of the 25th bidding round for petroleum exploration and production. This round offers nine greenfield onshore blocks—seven in northeastern Thailand and two in central Thailand—encompassing over 33,000 km². The bids can be submitted from July 1 to July 16, 2025. The sizes and locations of these blocks are: Northeast Thailand Block L1/66: 3,223.51 km² (Khon Kaen, Nong Bua Lam Phu, Udon Thani) Block L2/66: 3,917.03 km² (Kalasin, Sakon Nakhon, Udon Thani) Block L3/66: 3,918.22 km² (Kalasin, Khon Kaen, Maha Sarakham, Udon Thani) Block L4/66: 3,656.65 km² (Amnat Charoen, Mukdahan, Nakhon Phanom, Yasothon) Block L5/66: 3,436.01 km² (Chaiyaphum, Khon Kaen, Nakhon Ratchasima) Block L7/66: 3,438.51 km² (Buri Ram, Maha Sarakham, Nakhon Ratchasima, Roi Et, Surin, Khon Kaen) Block L9/66: 3,885.44 km² (Nakhon Ratchasima) Central Thailand Block L6/66: 3,966.86 km² (Chaiyaphum, Lop Buri, Phetchabun) Block L8/66: 3,957.41 km² (Kanchanaburi, Nakhon Pathom, Ratchaburi, Suphan Buri) Bidding Process Interested companies must submit their bids to the Department of Mineral Fuels (DMF) between July 1 and July 16, 2025. Bids should include: Application form (ChorThor/Por1) Proof of eligibility: Corporate documentation, audited financial statements, and proof of resources Technical and commercial proposals: Exploration plans, geological surveys, financial and work commitments, and special benefits such as signing bonuses of at least USD 100,000. There is a nonrefundable THB 50,000 application fee per block, and applicants must provide a bid bond of THB 3 million per block via an unconditional bank guarantee from a commercial bank with branches in Thailand, valid for at least one year from the bidding submission date. The guarantee will be returned to unsuccessful bidders upon request and to successful bidders upon the signing of the concession agreement. Eligibility Bidders must meet the following main eligibility criteria: Bidders must be limited companies with the following qualifications: The company must have the objective of
January 23, 2025
In 2023, compliance inspections by Vietnam’s Government Inspectorate identified several violations of policies and laws in the management and implementation of planning and investment in renewable energy projects. Since then, many renewable energy enterprises and projects have encountered significant operational challenges. In December 2024, the Ministry of Industry and Trade (MOIT) issued two reports, Report 321/BC-BCT and Report 345/BC-BCT, to implement the 2023 Inspection Conclusion of the Government Inspectorate and address obstacles faced by renewable energy enterprises, Investors in renewable energy projects in Vietnam should carefully consider the potential impacts of proposed solutions in these reports. The reports re-emphasize the types of violations related to renewable energy projects identified in the Inspection Conclusion, with a significant expansion in the number of affected projects. Key violations include: (i) misapplication of FIT (feed-in tariff) incentives; (ii) recognition of COD (commercial operation date) and receipt of FIT prices without written approval of construction acceptance; (iii) overlap with mineral planning, irrigation planning, national defense land use, or other restricted land uses; (iv) incomplete land procedures and documentation; and (v) installation of rooftop solar on agricultural and forestry land used for farming and aquaculture models. Further, these reports mention the government’s solutions to resolve difficulties for renewable energy projects, which include: Allowing additional planning where projects do not violate national security. Allowing rectification of projects’ violations in land and construction process as per law. For projects violating planning on minerals, irrigation, or defense, socio-economic efficiency will be assessed for adjustments or integration. Adjusting electricity prices and recovering incorrect FIT prices for projects not meeting conditions. Requiring rooftop solar projects on non-farming land to comply with regulations or, if land violations occur, FIT prices will be revoked, and electricity prices must be redetermined and recovered. For items (iv) and (v), the authority will issue regulations
January 14, 2025
Thailand’s Department of Industrial Works (DIW) has issued a new regulation (Ministerial Regulation Re: Designation of Type, Kind, and Size of Factories (No. 3) B.E. 2567 (2024)), which removes the factory license requirement for electricity generation from solar energy installations on rooftops, roof decks, or any part of a building used for residential or other purposes, regardless of capacity. The new rules took effect on December 28, 2024. Under the previous regulations, solar rooftop installations had to seek approval from the DIW if their capacity exceeded 1,000 kW (1 MW), which added time and administrative costs when adopting renewable energy solutions. Benefits and Further Compliance The updated regulation benefits industrial operators by facilitating faster installation times and lower costs, as solar rooftops can now be installed without the need for prior approval of a factory license from the DIW. Operators can now more easily contribute to environmental sustainability and carbon reduction efforts. Despite the lifting of the factory licensing requirement, other compliance obligations, such as an energy business license (or exemption from an energy business license), a controlled energy production license, and a construction permit, may still apply. Reason for the Change Removing the classification of rooftop or building-installed solar power plants as factories aligns with Thailand’s renewable energy goals and reduces regulatory burdens for industrial operators. Additionally, it supports the achievement of energy policies aligned with the UN’s Sustainable Development Goals and Thailand’s international commitments to reduce greenhouse gas emissions through the participation of all sectors. For further details on how this change affects business operations or to explore strategies for renewable energy implementation, please contact Supasit Boonsanong at [email protected], Charuwan Charoonchitsathian at [email protected], or Phareeya Yongpanich at [email protected].
December 4, 2024
Thailand Legal Basics, a valuable primer for foreign investors, explores all aspects of living and doing business in Thailand. Written by specialists at Tilleke & Gibbins in Bangkok, it is the only comprehensive English-language guide to the Thai legal system with a focus on the concerns of foreign business and investment.