You are using an outdated browser and your browsing experience will not be optimal. Please update to the latest version of Microsoft Edge, Google Chrome or Mozilla Firefox. Install Microsoft Edge

January 27, 2025

Thailand Opens 25th Bidding Round for Oil Exploration and Production

Thailand’s Ministry of Energy (MOE) has announced the launch of the 25th bidding round for petroleum exploration and production. This round offers nine greenfield onshore blocks—seven in northeastern Thailand and two in central Thailand—encompassing over 33,000 km². The bids can be submitted from July 1 to July 16, 2025.

The sizes and locations of these blocks are:

  • Northeast Thailand
    • Block L1/66: 3,223.51 km² (Khon Kaen, Nong Bua Lam Phu, Udon Thani)
    • Block L2/66: 3,917.03 km² (Kalasin, Sakon Nakhon, Udon Thani)
    • Block L3/66: 3,918.22 km² (Kalasin, Khon Kaen, Maha Sarakham, Udon Thani)
    • Block L4/66: 3,656.65 km² (Amnat Charoen, Mukdahan, Nakhon Phanom, Yasothon)
    • Block L5/66: 3,436.01 km² (Chaiyaphum, Khon Kaen, Nakhon Ratchasima)
    • Block L7/66: 3,438.51 km² (Buri Ram, Maha Sarakham, Nakhon Ratchasima, Roi Et, Surin, Khon Kaen)
    • Block L9/66: 3,885.44 km² (Nakhon Ratchasima)
  • Central Thailand
    • Block L6/66: 3,966.86 km² (Chaiyaphum, Lop Buri, Phetchabun)
    • Block L8/66: 3,957.41 km² (Kanchanaburi, Nakhon Pathom, Ratchaburi, Suphan Buri)

Bidding Process

Interested companies must submit their bids to the Department of Mineral Fuels (DMF) between July 1 and July 16, 2025. Bids should include:

  • Application form (ChorThor/Por1)
  • Proof of eligibility: Corporate documentation, audited financial statements, and proof of resources
  • Technical and commercial proposals: Exploration plans, geological surveys, financial and work commitments, and special benefits such as signing bonuses of at least USD 100,000.

There is a nonrefundable THB 50,000 application fee per block, and applicants must provide a bid bond of THB 3 million per block via an unconditional bank guarantee from a commercial bank with branches in Thailand, valid for at least one year from the bidding submission date. The guarantee will be returned to unsuccessful bidders upon request and to successful bidders upon the signing of the concession agreement.

Eligibility

Bidders must meet the following main eligibility criteria:

  1. Bidders must be limited companies with the following qualifications:
    • The company must have the objective of carrying out petroleum exploration and production;
    • The company must never have abandoned their operations under a concession or been subject to revocation of a concession in Thailand; and
    • None of the company’s shareholders, directors, or authorized directors can be listed as having abandoned operations under a concession or having been subject to revocation of a concession in Thailand.
  2. Bidders must command sufficient capital, machinery, equipment, tools, specialists, and other resources necessary for petroleum exploration and production. This includes having:
    • For at least two of the last three years, shareholder equity of at least THB 100 million and a current ratio of at least 1.00; and
    • Proven resources and experience in petroleum exploration and production over the last five years.

If the bidder does not possess all the qualifications outlined in item 2 above, the bidder must have another government-accredited company with a capital or management relationship that meets these qualifications. This company must guarantee that it will provide the bidder with all necessary capital, machinery, equipment, tools, and specialists for petroleum exploration and production.

If a bidder comprises more than one company, each of the companies must possess the qualifications outlined in item 2 above. Foreign companies may apply, provided that all documents are notarized by a foreign notary public or authenticated by the relevant foreign embassy or consulate in Thailand, or by a Thai embassy or consulate abroad.

Evaluation Criteria

Applications from qualified bidders will be evaluated using a points-based system that assesses the following:

  • Petroleum exploration program (80 points), comprising the exploration commitment for the first period (60 points) and the second period (20 points)
  • Special benefits (20 points)

The bidder with the highest scores will be selected as the concessionaire.

Legal and Contractual Framework

Successful bidders will operate under a concession scheme with a 6-year exploration period (extendable by 3 years) and a 20-year production period (extendable by 10 years). However, concession areas may be located on state-owned land, and if the use of this land is not permitted by any applicable law at present or in the future, the concessionaire must accept that it has no right to use the land for operations.

Outlook

The 25th bid round represents a significant opportunity for energy companies to invest in Thailand’s petroleum sector given the expiration of several petroleum blocks in the following years. The new petroleum blocks offered in this bid round are crucial for bolstering Thailand’s domestic petroleum production capabilities. They will play a vital role in reducing dependency on imported oil, stabilizing energy costs, and securing a steady supply of petroleum resources as they will enhance the country’s strategic petroleum reserves to ensure energy security amid global oil price volatility and geopolitical tensions.

For more details on the 25th bidding round, or on any aspect of energy activities in Thailand, please contact Supasit Boonsanong at [email protected], Charuwan Charoonchitsathian at [email protected], Kobchai Nitungkorn at [email protected], or Thananya Pholchaniko at [email protected].

RELATED INSIGHTS​ 

August 31, 2022
Thailand’s Draft Climate Change Act Countries around the world have given significant attention to climate change legislation, with many national, regional, and global attempts to slow the momentum of climate change. The most notable of these multilateral efforts is the Paris Agreement, a legally binding international treaty on climate change currently adopted by 193 parties. Its goal is to limit the global average temperature to well below 2°C (preferably below 1.5°C) above preindustrial levels, and the treaty’s coordinated efforts to combat climate change are much more ambitious than previous global agreements and discussions. Article 4 of the Paris Agreement requires countries to provide “nationally determined contributions” (NDCs), consisting of their action plans for climate action. Thailand, as a party to the Paris Agreement, has put forth an NDC that pledges to achieve an unconditional greenhouse gas (GHG) emission reduction target of 20% from the business-as-usual projection for 2030, with the possibility of increasing that target to 25% subject to adequate and enhanced access to technology development and transfer, financial resources, and other support. To enable the accomplishment of this pledge, Thailand is looking to enact climate change legislation that functions as a key mechanism for domestic climate action. In 2018, the Office of Natural Resources and Environmental Policy and Planning (ONEP) under the Ministry of Natural Resources and Environment was assigned to prepare a draft Climate Change Act. The draft is now complete, and according to news reports it is set to be submitted to the cabinet for further consideration. The draft Climate Change Act lays out Thailand’s action plan for climate change mitigation and adaptation, including emissions reductions. Some of the key sections in the draft law involve citizen rights, the National Climate Change Policy Committee, and a national GHG database. Rights of Citizens The draft establishes the
August 26, 2022
Thailand’s Board of Investment (BOI) has extended its previously announced period for reduction of import duty on imported raw and essential materials for battery manufacturing for electric vehicles and other applications. The BOI’s announcement No. 5/2565 dated August 8, 2022, extended the reduction period to a maximum of five years. The BOI’s promoted activities list includes two battery-manufacturing business activities: Activity 4.8.3.1 – Battery manufacturing Activity 5.2.6.1 – High energy density battery manufacturing Qualifying battery manufacturers who have cell or module manufacturing processes are eligible for 90% import duty reductions on raw and essential materials that cannot be produced in Thailand. These reductions will be available on an annual basis, and are renewable for five years in total—up from the original two years. Existing projects (i.e., those which have the original two-year duration in their BOI certificate) can also benefit from the extension by preparing a project amendment form, along with a clarification letter and supporting documents, for submission to the BOI office. For more details on these customs duty reductions, or on any aspect of investment promotion in Thailand, please contact Charuwan Charoonchitsathian at [email protected] or +66 2056 5657, or Napassorn Lertussavavivat at [email protected] or +66 2056 5662.
August 16, 2022
On July 21, 2022, Vietnam’s Ministry of Industry and Trade (MOIT) submitted Report No. 126/BC-BCT to the Prime Minister regarding the mechanism for transitional wind and solar power projects. In this report, the MOIT proposed some recommendations to explicitly address difficulties for outstanding wind and solar power projects (“Transitional Projects”) which have been developed under the Prime Minister’s Decision No. 13/2020/QD-TTg dated April 6, 2020, on the development of solar power projects (Decision 13) and Decision No. 37/2011/QD-TTg dated June 29, 2011, on the development of wind power projects (Decision 37), as amended by Decision No. 39/2018/QD-TTg dated September 10, 2018 (Decision 39). The Transitional Projects primarily include those which have completed construction but have not yet been put into operation, and those which have been put into operation but for which the power price has not yet been decided, due to missing the deadline set forth under the aforementioned decisions to be eligible for the feed-in-tariff (FIT). In particular, the MOIT has proposed the following key recommendations to the Prime Minister: Mechanism for Transitional Projects The MOIT proposes two options: Option 1: Developers of the Transitional Projects negotiate and sign power purchase agreements (PPA) with Vietnam Electricity (EVN) within the price framework issued by the MOIT in accordance with the Law on Electricity, the Law on Prices, and their subordinate guiding legislation; or Option 2: The Prime Minister formulates a new decision specifying the mechanism for bidding on the purchase of power produced by the Transitional Projects, estimated to be implemented for the time limit of three years and within the price framework issued by the MOIT. Mechanism for future wind and solar power projects The MOIT proposes to apply the mechanism that developers of future wind and solar projects negotiate the power price and sign the PPA
August 2, 2022
The Ministry of Energy is preparing to open a bidding round for the right to explore and produce petroleum in three offshore exploration blocks in the Gulf of Thailand: Exploration Block Nos. G1/65, G2/65, and G3/65. Announced in April 2022 with an eye toward national energy sustainability and security, this is the first opportunity for exploration of new offshore areas in 15 years. The total area of the three exploration blocks is 35,164.01 square kilometers, and operations in the exploration blocks will be subject to the terms and conditions of the required production sharing contract (PSC). Under the PSC, the Thai government is entitled to receive royalty payments against profits, any applicable cost recovery, and profit petroleum. The government also has the authority to monitor the petroleum operations in collaboration with the successful bidder. On July 27, 2022, the Department of Mineral Fuels (DMF) held a conference for prospective investors in order to clarify general information regarding the petroleum bidding round. Currently, interested investors can request the right to enter the bidding-round data room located at the DMF by emailing [email protected] by September 2, 2022. To participate in the bidding round, interested investors must submit an application together with required documents to the DMF during the period of September 5–16, 2022. For further information on the bidding round, or on any aspect of energy law in Thailand, please contact Tilleke & Gibbins at [email protected] or +66 2056 5555.