You are using an outdated browser and your browsing experience will not be optimal. Please update to the latest version of Microsoft Edge, Google Chrome or Mozilla Firefox. Install Microsoft Edge

January 27, 2025

Thailand Opens 25th Bidding Round for Oil Exploration and Production

Thailand’s Ministry of Energy (MOE) has announced the launch of the 25th bidding round for petroleum exploration and production. This round offers nine greenfield onshore blocks—seven in northeastern Thailand and two in central Thailand—encompassing over 33,000 km². The bids can be submitted from July 1 to July 16, 2025.

The sizes and locations of these blocks are:

  • Northeast Thailand
    • Block L1/66: 3,223.51 km² (Khon Kaen, Nong Bua Lam Phu, Udon Thani)
    • Block L2/66: 3,917.03 km² (Kalasin, Sakon Nakhon, Udon Thani)
    • Block L3/66: 3,918.22 km² (Kalasin, Khon Kaen, Maha Sarakham, Udon Thani)
    • Block L4/66: 3,656.65 km² (Amnat Charoen, Mukdahan, Nakhon Phanom, Yasothon)
    • Block L5/66: 3,436.01 km² (Chaiyaphum, Khon Kaen, Nakhon Ratchasima)
    • Block L7/66: 3,438.51 km² (Buri Ram, Maha Sarakham, Nakhon Ratchasima, Roi Et, Surin, Khon Kaen)
    • Block L9/66: 3,885.44 km² (Nakhon Ratchasima)
  • Central Thailand
    • Block L6/66: 3,966.86 km² (Chaiyaphum, Lop Buri, Phetchabun)
    • Block L8/66: 3,957.41 km² (Kanchanaburi, Nakhon Pathom, Ratchaburi, Suphan Buri)

Bidding Process

Interested companies must submit their bids to the Department of Mineral Fuels (DMF) between July 1 and July 16, 2025. Bids should include:

  • Application form (ChorThor/Por1)
  • Proof of eligibility: Corporate documentation, audited financial statements, and proof of resources
  • Technical and commercial proposals: Exploration plans, geological surveys, financial and work commitments, and special benefits such as signing bonuses of at least USD 100,000.

There is a nonrefundable THB 50,000 application fee per block, and applicants must provide a bid bond of THB 3 million per block via an unconditional bank guarantee from a commercial bank with branches in Thailand, valid for at least one year from the bidding submission date. The guarantee will be returned to unsuccessful bidders upon request and to successful bidders upon the signing of the concession agreement.

Eligibility

Bidders must meet the following main eligibility criteria:

  1. Bidders must be limited companies with the following qualifications:
    • The company must have the objective of carrying out petroleum exploration and production;
    • The company must never have abandoned their operations under a concession or been subject to revocation of a concession in Thailand; and
    • None of the company’s shareholders, directors, or authorized directors can be listed as having abandoned operations under a concession or having been subject to revocation of a concession in Thailand.
  2. Bidders must command sufficient capital, machinery, equipment, tools, specialists, and other resources necessary for petroleum exploration and production. This includes having:
    • For at least two of the last three years, shareholder equity of at least THB 100 million and a current ratio of at least 1.00; and
    • Proven resources and experience in petroleum exploration and production over the last five years.

If the bidder does not possess all the qualifications outlined in item 2 above, the bidder must have another government-accredited company with a capital or management relationship that meets these qualifications. This company must guarantee that it will provide the bidder with all necessary capital, machinery, equipment, tools, and specialists for petroleum exploration and production.

If a bidder comprises more than one company, each of the companies must possess the qualifications outlined in item 2 above. Foreign companies may apply, provided that all documents are notarized by a foreign notary public or authenticated by the relevant foreign embassy or consulate in Thailand, or by a Thai embassy or consulate abroad.

Evaluation Criteria

Applications from qualified bidders will be evaluated using a points-based system that assesses the following:

  • Petroleum exploration program (80 points), comprising the exploration commitment for the first period (60 points) and the second period (20 points)
  • Special benefits (20 points)

The bidder with the highest scores will be selected as the concessionaire.

Legal and Contractual Framework

Successful bidders will operate under a concession scheme with a 6-year exploration period (extendable by 3 years) and a 20-year production period (extendable by 10 years). However, concession areas may be located on state-owned land, and if the use of this land is not permitted by any applicable law at present or in the future, the concessionaire must accept that it has no right to use the land for operations.

Outlook

The 25th bid round represents a significant opportunity for energy companies to invest in Thailand’s petroleum sector given the expiration of several petroleum blocks in the following years. The new petroleum blocks offered in this bid round are crucial for bolstering Thailand’s domestic petroleum production capabilities. They will play a vital role in reducing dependency on imported oil, stabilizing energy costs, and securing a steady supply of petroleum resources as they will enhance the country’s strategic petroleum reserves to ensure energy security amid global oil price volatility and geopolitical tensions.

For more details on the 25th bidding round, or on any aspect of energy activities in Thailand, please contact Supasit Boonsanong at [email protected], Charuwan Charoonchitsathian at [email protected], Kobchai Nitungkorn at [email protected], or Thananya Pholchaniko at [email protected].

RELATED INSIGHTS​ 

February 28, 2022
On February 9, 2022, the Director-General of the Department of Mineral Fuels (DMF) stated that the DMF is planning to request that the Deputy Prime Minister and the Minister of Energy sign an invitation to open bids for Petroleum Exploration and Production Licenses in the Gulf of Thailand for the first time in 15 years. The DMF’s Chief Department expects that this auction, which will cover three offshore areas, could increase Thailand’s petroleum reserves, and it could lead to the possible discovery of new sources of petroleum for Thailand, which would boost the country’s energy resources, and reduce losses from energy imports. The plots in the Gulf of Thailand that will be auctioned in the 24th bid round are as follows: Plot No. G1/65 with a total area of 8,487 square kilometers. This area is divided into 2 sub-areas: Area A totaling 8,298.49 square kilometers, and Area B totaling 188.71 square kilometers; Plot G2/65 with a total area of 15,030 square kilometers; and Plot No. G3/65 with a total area of 11,646.67 square kilometers. This area is divided into 2 sub-areas: Area A totaling 11,028.22 square kilometers, and Area B totaling 618.45 square kilometers. Generally, Thailand initiates its concession and production sharing contract process with the announcement of an exploration area or a plot in the Government Gazette. Thereafter, the DMF Committee will consider and announce the invitation, so that private sector firms can submit their applications to receive respective rights. The DMF’s sub-committee will consider the applications by: checking the qualifications stipulated under Section 24 of the Petroleum Act; assessing the suitability of the exploration project; and determining the benefits which are offered by the applicant. After considering the requests, the DMF’s sub-committee will consider the petroleum laws and regulations, before submitting the matter to the Petroleum Committee—under
February 22, 2022
The many new and unique challenges in recent years—from epidemics, to travel restrictions, to supply chain disruptions and energy-related reactions to all of the above, we have all had to adjust to a new status quo. The energy industry has felt these impacts acutely, and as the industry seeks to meet the current challenges and move forward toward a more sustainable future, it is helpful to take stock of where things stand and where they might be headed in the coming years. In the midst of this uncertainty, Energy Law in Southeast Asia by the Tilleke & Gibbins Energy Industry Team seeks to provide clarity on the legal and regulatory environment surrounding energy industry activities. Each chapter of Energy Law in Southeast Asia takes the reader through the essential information surrounding energy and environmental regulations in general and the specific laws and practices for the major areas of energy projects—both in terms of the current energy mix and the sources taking on a larger role as we transition toward a lower-carbon future. These chapter subsections are: Regulatory Structure Oil and Gas Coal Solar Wind Hydropower Biomass and Biogas Environmental Regulations In providing this legal overview of major areas across the spectrum of energy projects in Southeast Asia, we have sought to create a resource for all involved in the energy industry, regardless of their specific area of interest or the different obstacles or challenges they seek to resolve. Energy Law in Southeast Asia is written by specialists on Tilleke & Gibbins’ Energy Industry Team, who together have over 200 years of accumulated energy experience. Spread throughout Tilleke & Gibbins’ offices in Southeast Asia, they function both as an integrated regional team to advise multinational enterprises on their regional energy project portfolios, and as experts for investors and companies looking
January 27, 2022
The Energy Generating Authority of Thailand (EGAT) has launched a pilot project to study the energy consumption and the economic, social, and environmental impact of electric motorcycle taxis, as well as the behavior of drivers and passengers. The project, which was launched on December 27, 2021, as part of EGAT’s Carbon Neutrality Policy, will continue for a year, after which EGAT will consider the data and decide whether electric motorcycle taxis should be introduced nationwide. EGAT is also currently encouraging the use of electric bikes within their own organization, and they initially expect this to help reduce annual carbon dioxide emissions by 37 tons and prevent the release of about 838,000 milligrams of dust per year. EGAT expects additional significant reductions from electric motorcycle taxi pilot projects in multiple locations. A study conducted in Kenya in 2015 by that country’s energy regulator found that sub-150cc motorcycles emit approximately 46.5 grams of carbon dioxide per kilometer, and these emissions increase proportionally in accordance with engine size. According to Thailand’s Office of Industrial Economics, citing data collected by the Federation of Thai Industries Automotive Industry Group, a total of 1,516,096 motorcycles were sold in Thailand in 2020—a surprisingly robust figure in light of the impact of the COVID-19 pandemic. Assuming that public motorcycles travel an average of 15,000 kilometers per year, each motorcycle is therefore producing approximately 0.7 tons of carbon dioxide per year. If Thailand is able to change 50% of its yearly sales of standard motorcycle to electric motorcycles, annual carbon dioxide emissions could decrease by approximately 530,000 tons. Furthermore, since 28.8% of carbon dioxide emissions in Thailand are generated from the transport sector, the transition to electric mobility vehicles looks to be one of the most promising solutions for lowering carbon dioxide emissions in the country. Considering developments
January 12, 2022
Thailand’s Board of Investment (BOI) recently published BOI Notification No. Sor. 8/2564, which extends the scope of investment promotion covering electronic vehicle (EV) industry manufacturers to include the production of “automotive platforms” for electric vehicles, and creates a new category of BOI promoted activities covering the manufacture of electric bicycles (E-bikes). Automotive Platforms The following investment promotion categories have been extended: 4.24 – Manufacture of Battery Electric Vehicles 4.26 – Manufacture of Electric Battery Tricycles 4.27 – Manufacture of Electric Battery Busses and Trucks These categories now include the manufacture of “automotive platforms”—which must include an energy storage system, charging module, and front and rear axle module—benefiting from similar tax incentives and subject to additional conditions, as detailed below. New BOI Promotional Category for E-Bike Production The BOI has also introduced a new category, No. 4.28, covering the manufacture of E-bikes. Projects under this category will be eligible for a three-year CIT exemption with an additional one-year exemption if certain criteria are met. Applications for this category must cover the manufacture of E-bikes, the manufacture or sourcing of electric batteries, and a management plan for used batteries. In addition to the general conditions for EV projects (industrial standards, manufacturing timelines, etc.), the BOI has also imposed the following conditions specific to E-bike projects: E-bike frames must be produced from light-weight materials such as aluminum alloy, chromium–molybdenum alloy steel (chrome moly), titanium alloy, and carbon fiber; and E-bike batteries must adopt environmentally-friendly technology. Interestingly the BOI allows E-bike production lines to jointly use manufacturing lines for ordinary bicycles. However, the sale of ordinary bicycles is regarded as non-BOI-promoted income and will not be entitled to BOI tax incentives. These new provisions, intended to stimulate both local and foreign investments in the electric automotive industry, seem to complete the BOI promotion