Seven Things to Look for in Your Private Power Purchase Agreement

Bangkok Post, Corporate Counsellor Column

As the costs of solar photovoltaic (PV) panels decrease, new business opportunities are emerging. In addition to the traditional model of independent power producers establishing large-scale power generating facilities to sell electricity directly to public utilities, a new dynamic model of direct electricity selling is beginning to take shape.

Solar PV panels can be installed on roofs to supply electricity directly to the building’s occupants, bypassing the need for a local electricity utility. Under a contract between private parties, the customer and power producer are able to negotiate directly on the cost of the electricity to be supplied. The resulting increase in competition has the potential to reduce energy costs across the market.

Typically, the electricity seller will remain the owner of the PV panels, the inverter, and other components of the generating system. As the seller will be financing the installation of the system, this will allow the purchaser to sign up with minimal initial costs.

The principal contractual document governing the relationship between the seller and purchaser is the power purchase agreement (PPA). PPAs are traditionally executed between independent power producers and the local electricity utility, which in Thailand has been the Provincial Electricity Authority (PEA), the Metropolitan Electricity Authority (MEA), or the Electricity Generating Authority of Thailand (EGAT).

The form PPAs from the MEA, PEA, and EGAT generally do not allow for much negotiation on the part of the independent power producers. But with rooftop solar installations, both the seller and the purchaser of the electricity being generated are private parties, meaning there is greater room for flexibility.

Here are seven issues that both parties should be aware of from the outset:

1. Ownership of the facilities: Ideally, the purchaser will be the owner of both the building and the land. However, if the purchaser is leasing the property, it is important to ensure that installation of the system will not violate the lease agreement, or will not result in the system becoming attached to the building as a permanent fixture. If the building and/or land are being leased, the term of the lease should also be confirmed in order to ensure that installation of the system will be economical for the seller.

2. Minimum purchase requirements: The purchaser should ideally be required to purchase a minimum amount of electricity each month, failing which, it will still be required to compensate the seller. This “take or pay” model is optimal for ensuring financial predictability on the part of the seller and its financiers. The purchaser should take care to ensure that its minimum commitments are not excessive and can easily be managed in light of anticipated future use.

3. Clear lines between Force Majeure and Events of Default: A key issue to consider in the PPA is how to address changes to the environment which are beyond the control of the purchaser. If the purchaser’s neighbor to the south erects a tall building, trees, or other obstructions, the solar PV system may be rendered effectively worthless. It will be important to ensure that the PPA clearly outlines whether the purchaser is entitled to terminate the agreement in such circumstances.

4. Ownership of the system: Since the seller will retain ownership of the system, it will want to affix conspicuous markings on all equipment to ensure that its ownership interests are clear. The PPA should contain a clause which requires the purchaser to assist the seller in the event the seller wishes to register its ownership interests at any relevant government agencies. Furthermore, the PPA should contain covenants on the part of the purchaser that it will take no actions which will result in the system being deemed a fixture.

5. Mortgages and encumbrances: The seller must be aware if the land and/or building on which the panels will be placed has been mortgaged. Additionally, the PPA may contain a negative covenant on the part of the purchaser not to mortgage the building, or an undertaking to notify the seller in the event it mortgages the building. The seller’s lenders may consider securing their loans to the seller by taking the solar PV system as collateral.

6. Regulatory environment: As this is a new area of business, the regulatory framework is still in the process of being devised. The purchaser and seller must stay apprised of new rules and regulations promulgated by the Energy Regulatory Commission, and the PPA must envision how new rules affecting the transaction will be addressed.

7. Payment terms: Delayed payment by the purchaser should ideally result in automatic interest payments being levied. It will not be in the seller’s best interests to terminate the agreement immediately in the event of non-payment; however, the purchaser must have a clear disincentive to delay on making its regular payments.

Private PPAs for solar PV systems are still in their infancy in Thailand, and best practices will continue to develop. It is important that both purchasers and sellers of electricity are aware of the legal risks involved when negotiating PPAs and have taken all appropriate steps to maximize their bargaining position.

RELATED INSIGHTS​ 

March 21, 2025
Thailand is continuing on its path toward comprehensive legislation to address climate change. In November 2024, the country’s Ministry of Natural Resources and Environment (MNRE) launched a public hearing on a new draft Climate Change Act following revisions made after an earlier hearing on a previous draft of the act. The revised version strengthens Thailand’s climate policy framework by introducing the Carbon Border Adjustment Mechanism (CBAM), modeled after the EU’s system of the same name. The new draft also restructures the planned Emissions Trading Scheme (ETS) and enhances carbon-tax provisions. These initiatives aim to minimize carbon leakage, promote fair competition for domestic industries, and encourage lower greenhouse gas (GHG) emissions. As of March 2025, the Department of Climate Change and Environment, under the MNRE, is awaiting the Ministry of Finance’s input on the draft act’s establishment of the Climate Fund, a fund to support business innovation in responding to climate change. After incorporating this feedback, the department will submit the refined draft for cabinet approval, expected in 2025. The legislation will then undergo Council of State review, with implementation expected in 2026. Key Provisions The draft Climate Change Act contains a number of provisions that will affect businesses. Some of the most relevant are discussed below. Mandatory ETS The ETS is a mandatory mechanism designed to control GHG emissions by setting emissions caps for designated industries in alignment with national targets. Under this system, businesses receive emissions allowances allocated through free allocation or auctions. This scheme incentivizes emissions reductions by allowing businesses that emit less than their allocated allowances to sell their surplus allowances. The specific business sectors covered by the ETS have not yet been identified in the draft act, as details are expected to be in subordinate legislation. However, it is anticipated that the sectors will align
March 11, 2025
The Vietnamese government is in the process of amending the Law on Atomic Energy, originally issued in 2008, to harmonize with several newly enacted laws, establish a comprehensive regulatory framework governing nuclear energy in Vietnam, and serve as a legal basis to foster the implementation of ongoing and future nuclear projects in the country. The Ministry of Science and Technology has been assigned to lead the drafting of the amended Law on Atomic Energy. The second draft of the amended law (the “Draft”) was released in late February 2025 for public consultation to gather feedback from the community and stakeholders. Key Points The Draft introduces new regulations to ensure high standards of safe and secure use of nuclear materials, radioactive sources, medical and industrial irradiation, mining and processing of radioactive ores, and radioactive waste management, as well as requirements for enhancing capacity to prepare for and respond to radiation incidents and nuclear incidents. In addition, the Draft emphasizes environmental protection, public health in nuclear energy projects, and support for development and advancing nuclear technology capabilities in Vietnam together with enhancing international cooperation in this field. Below are some key points of the Draft: Approval and licensing requirements for nuclear facilities: The Draft requires investors or owners of nuclear facilities to obtain several permits and approvals as regulated by the government before implementation of construction or operation. Reporting obligations: In addition to periodic reports on operations, safety measures, and compliance with regulations, nuclear facilities are required to make, maintain, and update a number of their regular records related to radiation and nuclear safety for ad hoc reports when required by the competent authorities. In this respect, any incidents or deviations from standard procedures must be reported immediately to the relevant authorities. Training and certification: Personnel working in nuclear facilities as
February 21, 2025
As Vietnam continues its government restructuring, including the merging of several key ministries, the country is signaling that mergers of provinces could be next. Conclusion 126-KL/TW of the Politburo and Secretariat, issued on February 14, 2025, sets out several tasks for continuing to streamline the political system in 2025, notably including, among others, the following: Elimination of intermediate administrative levels, and mergers of provincial units: The Government Party Committee is tasked with researching and planning for the elimination of intermediate administrative levels (district levels); reorganizing the commune level with structures, functions, duties, powers, and responsibilities aligned with the new organizational model; and proposing the merging of some provincial administrative units. A report to the Politburo is required by Q3 2025. Reorganization of police structure: The Central Public Security Party Committee is tasked with leading and coordinating the implementation of a three-tier police organization, eliminating the district-level police. Judicial system reforms: The Central Party Committees of the Supreme People’s Court and the Supreme People’s Procuracy are tasked with researching and advising on the organizational model for courts and procuracies, and proposing amendments and supplements to relevant party mechanisms and state laws, with the aim of eliminating the district level. A report to the Politburo is required by Q2 2025. Implications of Merging Provinces The merging of provinces could bring positive impacts as well as new challenges. The expected benefits include: Administrative efficiency and cost saving: Reducing the number of administrative units could lead to more efficient governance and decision-making processes, as well as lower administrative costs due to fewer government offices and personnel. Economic development: Larger administrative areas can benefit from better allocation of resources and infrastructure development. Larger provinces may also attract more investment due to increased economic potential and market size. Improved service delivery: Public services could improve
February 11, 2025
On January 24, 2025, the prime minister of Vietnam issued Decision No. 232/QD-TTg, approving the proposal for establishment and development of a carbon market in Vietnam. The decision establishes a compliance mechanism for greenhouse gas (GHG) emitters and creates opportunities for investors interested in carbon trading in Vietnam. Market Development Roadmap Decision 232 establishes a phased approach to developing Vietnam’s carbon market, with the following ambitious milestones: Before June 2025 (preparation period): The legal framework for trading of emissions quotas and carbon credits and a carbon-credit offset exchange mechanism will be developed, along with the necessary infrastructure for organization and operation of the carbon-credit market. From June 2025 to the end of December 2028 (pilot period): A pilot domestic carbon exchange will be launched, with continued legal refinements. From 2029 (official launch period): The carbon market will be fully operational. Carbon Market Structure and Trading Mechanisms Vietnam’s carbon market will function as a centralized, government-regulated exchange, trading two main assets: GHG emissions quotas (allowances) allocated to regulated emitters, which can be traded or auctioned; and Carbon credits generated from domestic and international projects that are certified for trading. The carbon credits generated from international projects include those originating from international exchange or offset-crediting mechanisms such as the Clean Development Mechanism (CDM), the Joint Credit Mechanism (JCM), and Article 6 of the Paris Agreement. The National Registration System for GHG emissions quotas and carbon credits will be primarily developed and operated by the Ministry of Natural Resources and Environment. Transactions of GHG emissions quotas and carbon credits will occur on the domestic carbon exchange, managed by the Hanoi Stock Exchange, and will follow a centralized process where verified quotas and credits receive unique domestic codes for trading and participants must have depository accounts. The Vietnam Securities Depository and Clearing Corporation