November 24, 2015

New PPP Law Encourages Private Investment in the Railway Sector

Informed Counsel

Two years ago, the Private Investment in State Undertaking Act B.E. 2556 (2013) (PISUA) replaced the Private Participation in State Undertaking Act B.E. 2535 (1992) (PPSUA), which set out the criteria for a private party to jointly operate a government project. There were calls to replace the PPSUA because the law had a convoluted project approval process that discouraged private investment. During its 21-year lifespan, only 40 projects were completed under the PPSUA.

The PISUA aims to streamline and simplify the project approval process to attract more private investors. An increase in private sector investment would lessen the need for government loans and reduce the impact of financial restrictions caused by limited government budgets. In turn, this would improve the efficiency of developing infrastructure and providing public services to citizens.

Thailand’s railway sector would benefit tremendously from an increase in private sector investment. According to the Global Competitiveness Report 2015-2016, Thailand’s quality of railroad infrastructure ranks 78th out of 140 countries, indicating that there is scope for improvement. In light of this potential for improvement, this article will discuss the impact of the PISUA on Thailand’s railway sector.

Strategic Plan

The PISUA has proposed a draft Strategic Plan on Private Investment in State Undertakings (Strategic Plan), which sets out a five-year investment and policy plan that explicitly details the subsectors that are suitable for public–private partnerships.

The draft Strategic Plan was approved by the Thai Cabinet on May 26, 2015, and it was published in the Royal Gazette  on June 25, 2015. State agencies are therefore bound to prepare and approve projects that fall within the ambit of the Strategic Plan.

The Strategic Plan distinguishes between subsectors that require  private sector investment, such as certain infrastructure sectors, and subsectors in which the government only encourages  private sector participation. The railway sector largely falls within the former category and thus explicitly requires private sector investment.

Project Pipeline

On May 26, the Cabinet also acknowledged the Strategic Plan’s Project Pipeline, which lists all of the public projects with private sector investment. In the urban rail transit area, the Project Pipeline includes eight projects with an overall investment volume of approximately THB 568 billion. Twenty-five percent of this amount, which equates to THB 142 billion, shall be covered by private investors. Two of these projects are already under construction; five projects are undergoing feasibility studies; and for one project, the search for a suitable private investor is ongoing.

A feasibility study must be conducted for projects that exceed THB 1 billion. It has to be prepared by an external consultant who is in the State Enterprise Policy Office’s list of qualified consultants. A feasibility study aims to identify project costs, risks, and impacts, as well as the legal issues and potential problems in implementing the project through examination of Thailand’s current legal and regulatory framework. For PPPs in the railway sector, this includes railway-related laws and regulations.

In addition, the Project Pipeline outlines two projects in the high-speed rail sector with a total investment amount of THB 234 billion. One of these projects, a Bangkok-Rayong high-speed rail, requires a total investment of THB 152 billion, but the amount of private sector investment has not been determined yet. The other project, a Bangkok-Hua Hin high-speed rail, requires THB 81 billion of investment, and 11 percent of this amount, which equates to THB 9 billion, will be covered by private investors. Both of these projects are currently undergoing feasibility studies.

In total, private sector investment in the railway sector amounts to THB 802 billion. Nineteen percent of this amount, which is THB 154 billion, will be covered by private investors, excluding the Bangkok-Rayong high-speed rail. For capital-intensive railway projects, the government budget is the main source of funding, as private sector investment in infrastructure projects is limited to THB 500 billion. 

Acquiring Land or Immovable Assets

In order to construct new railways or railway accessories, it may become necessary to acquire land or immovable assets. The State Railway of Thailand is allowed to acquire land or immovable assets under the Railway Authority of Thailand Act B.E. 2494 (1951) (with amendments), which refers to the Expropriation of Immovable Property Act B.E. 2530 (1987). Under this Act, the state may acquire immovable property for the purpose of any public utility or for other public purposes. An appointed committee will appraise the estimated price of the immovable property to be expropriated and the amount of compensation to be provided.

The Mass Rapid Transit Authority of Thailand Act B.E. 2543 (2000) and the Act on Arrangement of Immovable Property for Mass Transit Undertaking B.E. 2540 (1997) apply to mass rapid transit systems within the Greater Bangkok Area and other provinces as stipulated by Royal Decree. They set out an independent procedure regarding the acquisition of immovable property for infrastructure projects.

Environmental Impact

The potential environmental impact of a project must also be considered. Under the Enhancement and Conservation of National Environmental Quality Act B.E. 2535 (1992), an environmental impact assessment report must be prepared at the stage of conducting a feasibility study on a specific project. This report must be approved by the Office of Environmental Policy and Planning. In the case of a public–private partnership, the government agency or state enterprise has the duty to prepare an impact assessment report.

With more streamlined project approval procedures and clearer guidelines, the PISUA is poised become a powerful tool in strengthening Thailand’s infrastructure sectors. It sets out a stronger framework for private investment in public sectors, and the recently enacted Strategic Plan may drive increased private investment in the railway sector. The development of private investment in the railway sector, however, will remain to be seen over the next five years as the impact of the PISUA evolves in practice.

RELATED INSIGHTS​ 

January 3, 2024
Thailand’s Energy Regulatory Commission (ERC) has issued the Notification on the Criteria for Regulating the Licensed Pool Manager B.E. 2566 (2023), which took effect on November 30, 2023. It followed an earlier notification, which took effect on October 13, 2023, that added the new license for the country’s pool gas manager. The new notification aims to regulate natural gas sale agreements and promote competition among players in the regulated natural gas market—that is, those who utilize natural gas for electricity generation under the Electricity Generating Authority of Thailand (EGAT) scheme, including industrial and NGV (natural gas for vehicles) consumers who rely on natural pool gas. The establishment of the pool gas scheme is aimed at encouraging new shippers to enter the market and providing new natural gas shippers with fair opportunities to compete with existing shippers, as all licensed shippers in the regulated market are subject to the same natural gas costs under this new scheme. Under this pool gas scheme, the pool manager plays a critical part in reselling natural gas in the country. Some of its responsibilities include the following: Purchasing natural gas or liquid natural gas (LNG) from licensed shippers in the regulated market at the rate at which the shippers procured the natural gas, including incidental expenses such as pipeline transportation and LNG station fees; Collecting data on the quantity and price of the gas purchased from the licensed shippers and calculating the pool gas price as specified in the ERC-approved manual, which is basically the average price of the natural gas procurement cost of all shippers in the pool; and Reselling natural gas or LNG to licensed shippers at the pool gas pricing rate in the quantity distributed to the pool by each shipper. Apart from its function in facilitating the primary procedures of
December 15, 2023
As part of its membership in Lex Mundi, Tilleke & Gibbins has published an updated edition of its Guide to Doing Business in Thailand for 2023. This guide outlines the key factors for starting and operating a business in the Thai market. Issues covered include: Investment incentives Financial facilities Exchange controls Import and export regulations Structures for doing business Requirements for the Establishment of a Business Operation of the Business Cessation or Termination of the Business Labor legislation, relations, and supply Tax Immigration requirements This publication is part of Lex Mundi’s Country Guides series prepared by member firms in more than 100 jurisdictions worldwide. The guides serve as a useful resource for planning international business strategy and researching new markets. The full Guide to Doing Business in Thailand is available through the button below.
July 25, 2023
Thailand’s Energy Regulatory Commission (ERC) is in the process of reviewing a draft regulation that updates the nationality qualifications for the ultimate shareholders and directors of applicants for an energy business license. The draft ERC Regulation Re: Qualifications, Documents and Application for Electricity Business—which is intended to replace the ERC Regulation Re: Application and Permission for Electricity Business B.E. 2551 and its amendments—is likely to be adopted soon and will affect licensed companies that are foreign majority owned when they apply for or renew their energy business licenses. The draft regulation requires partnerships, limited companies, and public limited companies to have the following qualifications unless there is an international agreement granting national treatment for a specific commitment (mode 3 or mode 4) or exemption by other laws: Juristic persons must be established under Thai law or registered in Thailand with the objective of carrying out electricity business; For private limited companies, foreign ultimate shareholders must not hold more than 49% of the total shares, and the number of the foreign shareholders must not exceed half of all shareholders; At least half of all directors must have Thai nationality; and Any authorized directors must have Thai nationality. When the draft regulation is adopted, it will not take retroactive effect on previously granted energy business licenses, which will continue to be valid until they expire if there is no material change to the license as defined by the draft regulation. Once the license is up for renewal (energy business licenses are normally issued for a specific period of time), it will be subject to the draft regulation. All license applications submitted prior to the effective date of the draft regulation and under consideration will be deemed applications for a license under the draft regulation. As noted above, the new qualification requirements
July 7, 2023
Cambodia has the potential to be one of the top countries in the world for generating renewable energy through solar, based on the average amount of sunlight hours available per day and the consistent sunshine throughout the year. The Cambodian government has recognized this potential and has made major updates to its energy policies in recent years. Solar power is now taking over a much larger portion of the total energy mix in Cambodia, especially as a number of utility-scale solar power plants have come online in recent years. The long-term Power Development Master Plan 2022–2040 sets out the long-term energy policy for Cambodia and requires a bigger role for renewables. The use of solar power will play a key role in this aim to increase the role of renewables, with the plan foreseeing almost 30% of all national power generated through solar technologies by 2040. Two of the latest legislative and regulatory steps by the government are the Ministry of Mines and Energy’s guidelines for rooftop solar systems, and most recently the long-awaited Environment and Natural Resources Code, which was enacted on June 29, 2023. Rooftop Solar Projects Many companies, from small startups to multinationals, are exploring the potential for rooftop solar in Cambodia. However, despite the favorable natural factors, the regulatory framework was not always clear or friendly to rooftop solar, hampering investment. This started slowly changing with the adoption of the first solar energy regulation in 2018, which provided the country’s first official guidance on both solar power plants and rooftop solar. It provided some much-needed clarity, but the 2018 solar energy regulation—and especially the subsequent electricity tariff schemes—often kept rooftop projects from being financially viable. Many players in the industry voiced their doubts about the regulations and tariffs, focusing especially on the capacity charge—a monthly