November 24, 2015

New PPP Law Encourages Private Investment in the Railway Sector

Informed Counsel

Two years ago, the Private Investment in State Undertaking Act B.E. 2556 (2013) (PISUA) replaced the Private Participation in State Undertaking Act B.E. 2535 (1992) (PPSUA), which set out the criteria for a private party to jointly operate a government project. There were calls to replace the PPSUA because the law had a convoluted project approval process that discouraged private investment. During its 21-year lifespan, only 40 projects were completed under the PPSUA.

The PISUA aims to streamline and simplify the project approval process to attract more private investors. An increase in private sector investment would lessen the need for government loans and reduce the impact of financial restrictions caused by limited government budgets. In turn, this would improve the efficiency of developing infrastructure and providing public services to citizens.

Thailand’s railway sector would benefit tremendously from an increase in private sector investment. According to the Global Competitiveness Report 2015-2016, Thailand’s quality of railroad infrastructure ranks 78th out of 140 countries, indicating that there is scope for improvement. In light of this potential for improvement, this article will discuss the impact of the PISUA on Thailand’s railway sector.

Strategic Plan

The PISUA has proposed a draft Strategic Plan on Private Investment in State Undertakings (Strategic Plan), which sets out a five-year investment and policy plan that explicitly details the subsectors that are suitable for public–private partnerships.

The draft Strategic Plan was approved by the Thai Cabinet on May 26, 2015, and it was published in the Royal Gazette  on June 25, 2015. State agencies are therefore bound to prepare and approve projects that fall within the ambit of the Strategic Plan.

The Strategic Plan distinguishes between subsectors that require  private sector investment, such as certain infrastructure sectors, and subsectors in which the government only encourages  private sector participation. The railway sector largely falls within the former category and thus explicitly requires private sector investment.

Project Pipeline

On May 26, the Cabinet also acknowledged the Strategic Plan’s Project Pipeline, which lists all of the public projects with private sector investment. In the urban rail transit area, the Project Pipeline includes eight projects with an overall investment volume of approximately THB 568 billion. Twenty-five percent of this amount, which equates to THB 142 billion, shall be covered by private investors. Two of these projects are already under construction; five projects are undergoing feasibility studies; and for one project, the search for a suitable private investor is ongoing.

A feasibility study must be conducted for projects that exceed THB 1 billion. It has to be prepared by an external consultant who is in the State Enterprise Policy Office’s list of qualified consultants. A feasibility study aims to identify project costs, risks, and impacts, as well as the legal issues and potential problems in implementing the project through examination of Thailand’s current legal and regulatory framework. For PPPs in the railway sector, this includes railway-related laws and regulations.

In addition, the Project Pipeline outlines two projects in the high-speed rail sector with a total investment amount of THB 234 billion. One of these projects, a Bangkok-Rayong high-speed rail, requires a total investment of THB 152 billion, but the amount of private sector investment has not been determined yet. The other project, a Bangkok-Hua Hin high-speed rail, requires THB 81 billion of investment, and 11 percent of this amount, which equates to THB 9 billion, will be covered by private investors. Both of these projects are currently undergoing feasibility studies.

In total, private sector investment in the railway sector amounts to THB 802 billion. Nineteen percent of this amount, which is THB 154 billion, will be covered by private investors, excluding the Bangkok-Rayong high-speed rail. For capital-intensive railway projects, the government budget is the main source of funding, as private sector investment in infrastructure projects is limited to THB 500 billion. 

Acquiring Land or Immovable Assets

In order to construct new railways or railway accessories, it may become necessary to acquire land or immovable assets. The State Railway of Thailand is allowed to acquire land or immovable assets under the Railway Authority of Thailand Act B.E. 2494 (1951) (with amendments), which refers to the Expropriation of Immovable Property Act B.E. 2530 (1987). Under this Act, the state may acquire immovable property for the purpose of any public utility or for other public purposes. An appointed committee will appraise the estimated price of the immovable property to be expropriated and the amount of compensation to be provided.

The Mass Rapid Transit Authority of Thailand Act B.E. 2543 (2000) and the Act on Arrangement of Immovable Property for Mass Transit Undertaking B.E. 2540 (1997) apply to mass rapid transit systems within the Greater Bangkok Area and other provinces as stipulated by Royal Decree. They set out an independent procedure regarding the acquisition of immovable property for infrastructure projects.

Environmental Impact

The potential environmental impact of a project must also be considered. Under the Enhancement and Conservation of National Environmental Quality Act B.E. 2535 (1992), an environmental impact assessment report must be prepared at the stage of conducting a feasibility study on a specific project. This report must be approved by the Office of Environmental Policy and Planning. In the case of a public–private partnership, the government agency or state enterprise has the duty to prepare an impact assessment report.

With more streamlined project approval procedures and clearer guidelines, the PISUA is poised become a powerful tool in strengthening Thailand’s infrastructure sectors. It sets out a stronger framework for private investment in public sectors, and the recently enacted Strategic Plan may drive increased private investment in the railway sector. The development of private investment in the railway sector, however, will remain to be seen over the next five years as the impact of the PISUA evolves in practice.

RELATED INSIGHTS​ 

May 19, 2023
On May 15, 2023, Vietnam’s Deputy Prime Minister Tran Hong Ha signed Decision No. 500 of the Prime Minister approving the National Power Development Plan for the period 2021-2030, with a vision to 2050 (“PDP VIII”), following extensive public consultations and multiple rounds of review since the first draft version was circulated in 2021. The plan was approved in the context that in the past few years, a number of large power projects have been behind schedule for operation, while new projects have not been able to be implemented due to waiting for additional planning. PDP VIII is the master plan for the development of the power source and transmission grid at 220kV or higher; services in renewable energy and new energy in Vietnam; and works connecting the power grids of Vietnam and neighboring countries. We set out below some quick updates regarding PDP VIII. 1. Development Targets Key development targets are summarized in the table below: Investors in coal, domestic gas, and LNG projects may need to have a conversion plan ready given the 2050 targets to convert to other sources of energy. 2. Solar Projects A list of 27 solar power projects that were planned for the period of 2021-2030 but which have not been assigned to investors are not allowed to be deployed but can be considered after 2030, except in the case of deployment in the form of self-production and self-consumption (Appendix IV). These projects represent 4,136.25 MW of capacity that will be left on the sidelines until 2030. 3. Hydropower Projects A list of 14 potential hydropower projects can be considered if economic and technical conditions allow for more hydropower development (Appendix III). These projects represent 1,244 MW of capacity that can be added to the hydropower targets for 2030. 4. Projects Prioritized for
March 22, 2023
Attorneys from Tilleke & Gibbins have contributed the Cambodia, Laos, Myanmar, and Vietnam sections to DLA Piper’s Global Government Contracting Country by Country guide, which provides essential information for businesses in 75 jurisdictions on how to source and enter into government contracting opportunities. The guide provides procurement information for jurisdictions in Africa, the Americas, Asia-Pacific, Europe, and the Middle East, and includes information on how to find procurement opportunities, the structure of procurement laws, and in-country resources and relevant publications. Each jurisdictional section includes valuable information on procedures for government tenders, bidding, and contract execution, as well as an overview of the legal and regulatory framework governing government procurement. Businesses can refer to the guide to gain a better understanding of procurement processes and regulations in each jurisdiction, which can help them identify potential opportunities and make informed decisions when pursuing government contracts. The guide’s procurement information for Cambodia, Laos, Myanmar, and Vietnam, combined with the online platform’s comprehensive resources, provides businesses and governments with a valuable tool to navigate the complex regulatory landscape of government contracting in the region. The full Global Contracting Country-by-Country guide is available on the DLA Piper website.
February 20, 2023
On December 20, 2022, the Notification re: Rules, Procedures, and Conditions on Transfer of Energy Licenses of the Thailand Energy Regulatory Commission (ERC) became effective. The notification sets out the new standard and procedure for transferring licenses for energy industry operation. The notable changes in the notification are provided below. Anti-Competition Consideration and Impact Assessment Report In considering the transfer of a license, in addition to ensuring the transferee meets all the qualifications for an applicant for the license, the ERC will consider if the transfer would (1) create a monopoly, reduce or restrict competition, or result in market dominance; (2) affect the contracting parties of the transferors or energy users; or (3) affect energy security or the public interest. In this respect, the vetting process for an application for license transfer would be separated into two different approaches. If the ERC believes that the transfer of the energy license would affect competition, energy users, energy security, or the public interest, the transferor will need to submit an impact assessment report on the license transfer to the ERC. In this regard, the ERC may establish a sub-committee or an independent consultant to contemplate the transfer at the transferor’s expense. However, if the ERC believes that the transfer of license would not lead to any impact, the transferor will not be required to submit the impact assessment. Also, if the license transfer is related to any transactions specified under the ERC’s Regulation re: Rules and Procedures on Merger and Cross-Shareholding in Energy Businesses, B.E. 2565, the ERC can combine the license transfer application with the M&A application. After approval, the ERC might require the transferee to periodically report to the ERC and comply with measures stipulated by the ERC. Therefore, an energy license holder which plans to carry out M&A
February 3, 2023
The Federation of Thai Industries (FTI) announced on January 16, 2023, the opening of registration for carbon credit trading on its Renewable Energy and Carbon Credit Exchange Platform. This new online platform supports the domestic carbon market and provides Thai exporters with the ability to purchase carbon credits, allowing them to address demands from importing nations to conform to carbon emission reduction regulations. This is expected to be a positive step forward for the current practice in Thailand, in which the carbon market operates as a voluntary and unregulated buy-sell platform, free from government regulation. Developed in partnership with the Thailand Greenhouse Gas Management Organization (TGO), the FTI: CC/RE/REC X Platform, or FTIX, is intended to increase the promotion of national carbon credits, renewable energy, and renewable energy certificates, thus improving the country’s efforts to mitigate climate change. Entrepreneurs interested in registering for carbon credit trading on the FTIX can do so through the FTIX website at fti-cc.com. The platform initially supports carbon credit trading through over-the-counter methods. In the near future, the FTIX will be developed to support 100% renewable energy (i.e., RE100 energy) and renewable energy certificate trading. However, the related tax and carbon pricing policies have not yet been issued. The TGO is currently in discussions with the Fiscal Policy Office and the Ministry of Finance regarding fiscal policy for the FTIX. For more information on the FTIX, or on any aspect of renewable energy activities in Thailand, please contact Charuwan Charoonchitsathian at [email protected], Napassorn Lertussavavivat at [email protected], or Ratchapat Triteeyaputranonta at [email protected].