Merger Control in Thailand’s Energy Sector

Informed Counsel

As policies are initiated under the Thai government’s Thailand 4.0 initiative, laying the groundwork for economic growth over the next two decades, the country’s energy demands will continue increase. The Ministry of Energy’s Thailand Power Development Plan of 2015 (PDP2015) outlines the framework for dealing with the increase in energy needs, including an expansion of installed electricity generating capacity. The PDP2015 makes it clear that the government sees private investment playing a crucial role in driving this expansion.

Thailand has added nearly 10 GW of additional capacity since 2012, increasing the country’s installed capacity from approximately 32.6 GW to 42.4 GW (as of November 2017). Much of this growth has been driven by the increase in the number of small power producers (SPPs). Installed capacity for SPPs has increased nearly threefold over the same period, from 2.6 GW in 2012 to 7.5 MW as of November 2017, now representing approximately 17.8% of the country’s total generating capacity.

As many SPP projects are reaching maturity and achieving steady, predictable returns for their investors, and as new SPP and very small power producer (VSPP) projects come online, we can expect a degree of market consolidation as producers aim to achieve economies of scale. With this in mind, it is useful to reflect on Thailand’s pre-closing approvals in the energy sector.

In most sectors of the economy, Thailand’s new Trade Competition Act B.E. 2560 (2017) provides a dual merger control system, involving premerger approvals and postmerger notifications. However, the new act is not applicable to businesses that have been governed by sector-specific antitrust and competition regulations, such as those in the energy sector.

Takeover and merger control in the energy sector is subject to a specific regime, that is, the Regulation of the Energy Regulatory Commission on the Establishment of Criteria to Prevent Mergers, Competition Lessening or Restrictions in Energy Services B.E. 2552 (2009). The regulation was promulgated by the Energy Regulatory Commission (ERC), which has the authority to regulate in order to prevent the reduction of competition in the energy services sector in accordance with section 60 of the Energy Industry Act B.E. 2550 (2007).

Section 4 of the regulation stipulates that an entity which has obtained a license from the ERC is prohibited from merging with another licensee without permission from the ERC. This effectively creates a preclosing merger control regime for licensees. The definition of “merger” under section 3 of the regulation captures situations where two or more licensees amalgamate, or one licensee acquires the assets, shares, or managerial control of another licensee.

In addition to permission to merge, licensees are required to notify the ERC if any of the following events occur:

  • The licensee wishes to enter into a contract causing any person to have absolute or partial direct or indirect control over its management;
  • The licensee acts to take over, or is being taken over, pursuant to the laws relating to securities and exchange; or
  • A person who has the power to control policies, management, supervision, or administration of a licensee takes direct or indirect control of the policies, management, supervision, or administration of another licensee.

Procedurally, permission must be granted by the ERC prior to closing the proposed merger. Once the parties to the proposed merger have submitted the application, the ERC has 90 days to render its decision, which may be extended for a period of up to 15 days if the ERC deems it necessary.

Section 10 of the regulation sets out the criteria for the ERC to consider when assessing whether to grant permission for a proposed merger. That said, the criteria are fairly general in nature and leave considerable room for the ERC to exercise discretion.

In addition to the preclosing merger approval, section 5 of the regulation requires notification to the ERC in the event a licensee is acquired by a third party. Under the Regulation of the Energy Regulatory Commission on Application for License and Permission for Energy Industry Operation B.E. 2551 (2008), one of the criteria of applying for a license to operate in the energy industry is having “sufficient financial and technical potential to construct and operate in the energy industry.”

Accordingly, when a licensee is being acquired or will merge with a nonlicensee, the ERC can scrutinize the transaction to a certain degree. If the company no longer possesses the qualifications required to operate in the energy industry after closing, the ERC may revoke the company’s license.

With Thailand’s ongoing push to increase electricity generating capacity, an opportunity exists for greater participation by private investors. As more projects come online and more producers become active in the sector, we anticipate seeing greater consolidation. The ERC’s merger control regime can be expected to play an increasingly important role in future energy transactions.

RELATED INSIGHTS​ 

August 12, 2024
With the growing prominence of ESG (Environmental, Social, and Governance) factors, businesses in Vietnam are increasingly recognizing their importance in driving global demand, societal impact, and economic value. A comprehensive acknowledgment of ESG-related legal requirements is critical for investors and companies operating in Vietnam to meet stakeholder expectations and ensure compliance. Our guide provides a basic overview of the rapidly evolving ESG landscape in Vietnam, covering a range of key issues for companies doing business in the country: What is ESG, and what does the ESG legal framework look like in Vietnam? Who needs to follow ESG regulations in Vietnam? What are the benefits of ESG compliance? How can enterprises enhance ESG best practices in Vietnam? Please click on the link below to view the full article.
June 6, 2024
On January 18, 2024, Vietnam’s National Assembly passed a new Land Law (“Land Law 2024”) that is scheduled to take effect on January 1, 2025, replacing the current Land Law 2013. To mitigate challenges faced by the real estate market, in late May 2024, the government proposed amendments to the Land Law that would move the effective date up five months, to August 1, 2024, pending approval by the National Assembly. One of the key sectors to be impacted by the Land Law 2024 is the energy sector, which requires large land areas for power plants and infrastructure, especially given Vietnam’s 2050 net zero emissions commitment. Below are highlights of how the new Land Law 2024 will affect Vietnam’s energy sector. Annual payment of land rental Under the Land Law 2013, investors implementing energy projects (e.g., solar power projects) are entitled to choose to lease land with either (i) an annual rental payment or (ii) a single upfront payment for the entire term of use. Under the Land Law 2024, these investors are only allowed to use land in the form of an annual rental payment. As the annual land rental is calculated in five-year cycles, based on the land price table decided by the state, this new restriction means that investors in energy projects will face an additional risk of a sudden increase in land rental, disrupting their financial planning. Investors using land sites leased with annual rental payments are also not allowed to mortgage their land-use rights, but can only mortgage assets attached to the land, at credit institutions licensed to operate in Vietnam. Accordingly, this may affect the ability of energy projects to obtain financing during the development stage, because they no longer have assets that can be mortgaged. Obtaining land Under the Land Law 2024,
June 4, 2024
Thailand’s Department of Mineral Fuels (DMF) is in the process of preparing a notification that will open the application period for onshore petroleum exploration and production rights in the country’s 25th bidding round. The 25th round of bidding will cover nine petroleum blocks, including the northeastern areas (blocks L1/66, L2/66, L3/66, L4/66, L5/66, L7/66, and L9/66) and central areas (blocks L6/66 and L8/66). The DMF estimates that application submissions will commence around the middle of 2024, and the successful bidder will be announced at the end of the same year. Based on previous rounds of bidding, applicants must meet the following key criteria: The applicant is a company with the purpose of carrying out petroleum exploration and production; The applicant commands the necessary assets, machinery, equipment, tools, and specialists to explore for, produce, sell, and dispose of petroleum; The applicant has not abandoned its operations under a concession or been subject to revocation of a concession in Thailand; and None of its personnel, shareholders, directors, or authorized directors is listed as a person who has abandoned its operations under a concession, or has been subject to revocation of a concession in Thailand. If the applicant does not itself possess all the qualifications under (2) above, it must have another government-approved company that possesses all the qualifications under (2) and has a capital or management relationship with the applicant, and the applicant must supply guarantees that the company will make available to the applicant all necessary assets, machinery, equipment, tools, and specialists for the applicant to explore for, produce, sell, and dispose of petroleum. Companies with a vested interest in petroleum exploration and production in Thailand must remain vigilant for updates. The DMF is expected to provide an update and more details on the bidding very soon. For more details
June 4, 2024
As Vietnam continues its rapid economic development, the demand for sustainable and reliable energy sources has never been more critical. Solar power has emerged as a key component of Vietnam’s strategy to diversify its energy portfolio and reduce its carbon footprint. Recent developments of the regulatory framework governing solar power projects in Vietnam, as discussed below, highlight the country’s commitment to renewable energy and its efforts to create a conducive environment for solar power investments. Objectives for the Development of Solar Power Projects On May 15, 2023, the Prime Minister issued Decision No. 500/QD-TTg, approving the National Power Development Plan for 2021-2030 with a vision to 2050 (“PDP VIII”). Following this, on April 1, 2024, the Prime Minister promulgated the Implementation Plan for PDP VIII (“Implementation Plan”). These documents underscore Vietnam’s commitment to promoting renewable energy, particularly solar. They emphasize self-production and self-consumption of solar power, the development of rooftop solar systems, and the promulgation of the direct power purchase mechanism. The integration of solar power with battery storage is also encouraged, contingent upon economic viability. PDP VIII sets ambitious capacity targets for solar power. By 2030, the capacity is projected to reach approximately 12,836 MW, accounting for 8.5% of the total power capacity. This includes 10,236 MW from concentrated solar power and 2,600 MW from self-production and self-consumption solar power. By 2050, the capacity is expected to rise to between 168,594 MW and 189,294 MW, representing 33.0-34.4% of the total power capacity. Additionally, PDP VIII and the Implementation Plan list 27 solar power projects, totaling 4,136.25 MW, slated for implementation after 2030. However, these projects may be advanced under self-production and self-consumption arrangements. Draft Decree on Direct Power Purchase Agreements On April 15, 2024, the Ministry of Industry and Trade (“MOIT”) released a draft decree on direct power