Investment Incentives for Solar and Wind Energy Projects in Vietnam

Informed Counsel

Solar and wind energy are clean, renewable sources that are becoming increasingly popular in many countries, especially in developing economies such as Vietnam. Realizing the importance, advantages, and benefits of such sustainable sources of energy, and facing an increasing demand for electricity supply for further economic development (with consistent annual electricity consumption increases of 10–15 percent), Vietnam decided recently to give greater scrutiny to studying, surveying, encouraging, and supporting investors, both foreign and domestic, investing in renewable energy projects.

Development of new and renewable energy was included in Vietnam’s national energy development strategy through 2020, with a vision towards 2050, as promulgated in Decision 1855. This strategy sets specific targets to increase the proportion of new and renewable energy sources to 3 percent of total commercial primary power by 2010, 5 percent by 2020, and 11 percent by 2050. To reach these targets, Decision 1855 also guides the direction and orientation for development together with policies, incentives, and governmental support to attract investors. These goals are reflected in various pieces of legislation.

Advantages for Investors

Under current legislation, investors are entitled to maximum incentives for every aspect related to solar or wind energy projects, such as land or water surface lease terms and fees, corporate income tax, value-added tax, import and export duties, land site clearance, and depreciation of fixed assets, among others. In addition, solar and wind power projects are considered clean investments under the country’s clean development mechanism (see Decision 130). Accordingly, investors are subsidized by the state through the Environmental Protection Fund of Vietnam for the difference between the real input costs and the sales price of power as agreed to in the contract to provide power generated by solar or wind energy (see Decree 58).

Challenges for Investors

Although enjoying a variety of incentives, investors also face several challenges when investing in these kinds of projects. First, at present, Vietnam has not yet conducted any official or comprehensive surveys, studies, or assessments on the potential of solar or wind energy in Vietnam. Thus, prospective investors may lack necessary information when seeking investment opportunities.

Second, Vietnam does not have a cohesive legal framework governing policies related to solar or wind energy projects. Such policies are now stipulated separately in various statutes. In some instances, there are conflicting rules and regulations between different laws governing the same issues. To overcome these difficulties, the deputy prime minister recently requested and assigned the Ministry of Industry and Trade to fast-track a draft decision of the prime minister’s office on the strategy and general planning for development of renewable energy in Vietnam up to 2030, with a vision towards 2050. The draft plan is awaiting the prime minister’s approval.

Third, and most importantly, Vietnam lacks an effective and feasible mechanism for investor financing as it relates to the sales price of wind power. Currently, the Vietnam Electricity Group (EVN) is the exclusive transmitter, purchaser, and distributor of power. The sales price for power in Vietnam is always the highest hurdle for investors to overcome, and in practice, the set prices for power purchase by the EVN monopoly are always much lower than the actual input costs. As encouragement, the state assists investors by providing a subsidy for the difference in contract price (see Decision 130). But these subsidies are often insufficient and limited to the amount set aside in the state fund. As a result, investors remain cautious of their risks when investing in this field.

To calm investors’ anxieties, the Ministry of Industry and Trade very recently completed and submitted to the government, for its consideration and approval, a draft decision on promulgating regulations on investment and construction of wind power projects in Vietnam. The draft indicates EVN will assist in the connection of wind-generated power to the power grid and be liable for purchasing and distributing all products from wind power projects. In particular, EVN will pay VND 1,317 (approximately USD 0.07) for each kilowatt of wind-generated power, and the state will subsidize an amount of VND 185 (approximately USD 0.01).

Furthermore, under the draft plan, wind power investors will enjoy import tax exemption on machinery and equipment, corporate income tax at 10 percent for the life of the project, land-use tax exemption for the duration of the project, and access loans up to 80 percent of the total investment capital along with preferential interest rates.

Project Restrictions

At present, there are no statutory prohibitions relating to the development of coastal areas as it pertains to energy investors, either foreign or Vietnamese. Legislation on investments only prohibits projects that:

  • Are detrimental to national defense and security and/or the public interest.
  • Are detrimental to historical and cultural traditions and ethics, and Vietnamese fine customs.
  • Harm the people’s health, or destroy natural resources and the environment.
  • Treat toxic wastes brought into Vietnam, or are projects for the manufacture of any type of toxic chemicals or for the use of chemical agents prohibited by international treaties.

Subject to the above exceptions, investors enjoy the right to invest in other projects without restrictions as to location within Vietnam, provided that the investor satisfies all conditions and procedures in accordance with the law.

Wind Projects in Vietnam

Among alternative energy sources, wind power may represent the strongest growth opportunity in Vietnam. Surveys have shown that approximately 85 percent of Vietnam’s land has an elevation and average wind speed that is suitable for generating wind power. Experts from the World Bank have concluded that Vietnam has the ability to generate 513,360 megawatts annually through wind power—10 times the projected national electricity capacity for 2020.

The coastal provinces of Binh Thuan and Ninh Thuan, in particular, are considered to have the greatest potential for wind power in large plots of land that are arid and not agriculturally fertile. At present, there are more than 20 wind power projects in Vietnam, mainly located in Binh Thuan (12 projects on the mainland and Phu Quy Island District), Ninh Thuan, Binh Dinh, Phu Yen, and Con Dao Island District of Ba Ria-Vung Tau province, where the volume and average wind speed are highest compared to the rest of the country.

Of these, the wind power projects in Binh Thuan and Ninh Thuan of the Vietnam Renewable Energy Joint Stock Company (REVN) stand out because of their size. REVN is the owner of Tuy Phong Wind Power Factory located in Binh Thanh commune, Tuy Phong district, Binh Thuan province. Phase 1, consisting of 20 turbines, was just completed with a capacity of 30 megawatts. The project was put into operation (i.e., began generating power) as of March 2011 with a total investment capital of VND 1.5 billion. REVN is now carrying out phase 2 of this project at both Binh Thanh and Chi Cong communes, with an anticipated capacity of 90 megawatts, and total investment capital of VND 4.5 billion. The project, which is now being implemented,will be concluded by 2015.

In Ninh Thuan province, REVN is building Wind Power Factory 1 located at Phuoc Minh commune, Thuan Nam district, with an anticipated capacity of 30 megawatts, including 15 turbines, and a total investment capital of VND 1.35 billion. Operations are expected to begin in 2012. All remaining projects are either in the surveying stage or under construction.

Outlook

Based on projected energy consumption levels, Vietnam will need to secure new sources of energy to maintain its economic growth. The state has given positive signals that it is committed to solar and wind energy over the long term, and these signals have been backed up by the implementation of a wide range of incentives and commitments to a more cohesive plan for renewable energy development in the years to come. As this legal framework develops, solar and wind projects may emerge as one of the most attractive fields for foreign investment in Vietnam.

RELATED INSIGHTS​ 

August 12, 2024
With the growing prominence of ESG (Environmental, Social, and Governance) factors, businesses in Vietnam are increasingly recognizing their importance in driving global demand, societal impact, and economic value. A comprehensive acknowledgment of ESG-related legal requirements is critical for investors and companies operating in Vietnam to meet stakeholder expectations and ensure compliance. Our guide provides a basic overview of the rapidly evolving ESG landscape in Vietnam, covering a range of key issues for companies doing business in the country: What is ESG, and what does the ESG legal framework look like in Vietnam? Who needs to follow ESG regulations in Vietnam? What are the benefits of ESG compliance? How can enterprises enhance ESG best practices in Vietnam? Please click on the link below to view the full article.
June 6, 2024
On January 18, 2024, Vietnam’s National Assembly passed a new Land Law (“Land Law 2024”) that is scheduled to take effect on January 1, 2025, replacing the current Land Law 2013. To mitigate challenges faced by the real estate market, in late May 2024, the government proposed amendments to the Land Law that would move the effective date up five months, to August 1, 2024, pending approval by the National Assembly. One of the key sectors to be impacted by the Land Law 2024 is the energy sector, which requires large land areas for power plants and infrastructure, especially given Vietnam’s 2050 net zero emissions commitment. Below are highlights of how the new Land Law 2024 will affect Vietnam’s energy sector. Annual payment of land rental Under the Land Law 2013, investors implementing energy projects (e.g., solar power projects) are entitled to choose to lease land with either (i) an annual rental payment or (ii) a single upfront payment for the entire term of use. Under the Land Law 2024, these investors are only allowed to use land in the form of an annual rental payment. As the annual land rental is calculated in five-year cycles, based on the land price table decided by the state, this new restriction means that investors in energy projects will face an additional risk of a sudden increase in land rental, disrupting their financial planning. Investors using land sites leased with annual rental payments are also not allowed to mortgage their land-use rights, but can only mortgage assets attached to the land, at credit institutions licensed to operate in Vietnam. Accordingly, this may affect the ability of energy projects to obtain financing during the development stage, because they no longer have assets that can be mortgaged. Obtaining land Under the Land Law 2024,
June 4, 2024
Thailand’s Department of Mineral Fuels (DMF) is in the process of preparing a notification that will open the application period for onshore petroleum exploration and production rights in the country’s 25th bidding round. The 25th round of bidding will cover nine petroleum blocks, including the northeastern areas (blocks L1/66, L2/66, L3/66, L4/66, L5/66, L7/66, and L9/66) and central areas (blocks L6/66 and L8/66). The DMF estimates that application submissions will commence around the middle of 2024, and the successful bidder will be announced at the end of the same year. Based on previous rounds of bidding, applicants must meet the following key criteria: The applicant is a company with the purpose of carrying out petroleum exploration and production; The applicant commands the necessary assets, machinery, equipment, tools, and specialists to explore for, produce, sell, and dispose of petroleum; The applicant has not abandoned its operations under a concession or been subject to revocation of a concession in Thailand; and None of its personnel, shareholders, directors, or authorized directors is listed as a person who has abandoned its operations under a concession, or has been subject to revocation of a concession in Thailand. If the applicant does not itself possess all the qualifications under (2) above, it must have another government-approved company that possesses all the qualifications under (2) and has a capital or management relationship with the applicant, and the applicant must supply guarantees that the company will make available to the applicant all necessary assets, machinery, equipment, tools, and specialists for the applicant to explore for, produce, sell, and dispose of petroleum. Companies with a vested interest in petroleum exploration and production in Thailand must remain vigilant for updates. The DMF is expected to provide an update and more details on the bidding very soon. For more details
June 4, 2024
As Vietnam continues its rapid economic development, the demand for sustainable and reliable energy sources has never been more critical. Solar power has emerged as a key component of Vietnam’s strategy to diversify its energy portfolio and reduce its carbon footprint. Recent developments of the regulatory framework governing solar power projects in Vietnam, as discussed below, highlight the country’s commitment to renewable energy and its efforts to create a conducive environment for solar power investments. Objectives for the Development of Solar Power Projects On May 15, 2023, the Prime Minister issued Decision No. 500/QD-TTg, approving the National Power Development Plan for 2021-2030 with a vision to 2050 (“PDP VIII”). Following this, on April 1, 2024, the Prime Minister promulgated the Implementation Plan for PDP VIII (“Implementation Plan”). These documents underscore Vietnam’s commitment to promoting renewable energy, particularly solar. They emphasize self-production and self-consumption of solar power, the development of rooftop solar systems, and the promulgation of the direct power purchase mechanism. The integration of solar power with battery storage is also encouraged, contingent upon economic viability. PDP VIII sets ambitious capacity targets for solar power. By 2030, the capacity is projected to reach approximately 12,836 MW, accounting for 8.5% of the total power capacity. This includes 10,236 MW from concentrated solar power and 2,600 MW from self-production and self-consumption solar power. By 2050, the capacity is expected to rise to between 168,594 MW and 189,294 MW, representing 33.0-34.4% of the total power capacity. Additionally, PDP VIII and the Implementation Plan list 27 solar power projects, totaling 4,136.25 MW, slated for implementation after 2030. However, these projects may be advanced under self-production and self-consumption arrangements. Draft Decree on Direct Power Purchase Agreements On April 15, 2024, the Ministry of Industry and Trade (“MOIT”) released a draft decree on direct power