May 23, 2012

Investment Incentives for Solar and Wind Energy Projects in Vietnam

Informed Counsel

Solar and wind energy are clean, renewable sources that are becoming increasingly popular in many countries, especially in developing economies such as Vietnam. Realizing the importance, advantages, and benefits of such sustainable sources of energy, and facing an increasing demand for electricity supply for further economic development (with consistent annual electricity consumption increases of 10–15 percent), Vietnam decided recently to give greater scrutiny to studying, surveying, encouraging, and supporting investors, both foreign and domestic, investing in renewable energy projects.

Development of new and renewable energy was included in Vietnam’s national energy development strategy through 2020, with a vision towards 2050, as promulgated in Decision 1855. This strategy sets specific targets to increase the proportion of new and renewable energy sources to 3 percent of total commercial primary power by 2010, 5 percent by 2020, and 11 percent by 2050. To reach these targets, Decision 1855 also guides the direction and orientation for development together with policies, incentives, and governmental support to attract investors. These goals are reflected in various pieces of legislation.

Advantages for Investors

Under current legislation, investors are entitled to maximum incentives for every aspect related to solar or wind energy projects, such as land or water surface lease terms and fees, corporate income tax, value-added tax, import and export duties, land site clearance, and depreciation of fixed assets, among others. In addition, solar and wind power projects are considered clean investments under the country’s clean development mechanism (see Decision 130). Accordingly, investors are subsidized by the state through the Environmental Protection Fund of Vietnam for the difference between the real input costs and the sales price of power as agreed to in the contract to provide power generated by solar or wind energy (see Decree 58).

Challenges for Investors

Although enjoying a variety of incentives, investors also face several challenges when investing in these kinds of projects. First, at present, Vietnam has not yet conducted any official or comprehensive surveys, studies, or assessments on the potential of solar or wind energy in Vietnam. Thus, prospective investors may lack necessary information when seeking investment opportunities.

Second, Vietnam does not have a cohesive legal framework governing policies related to solar or wind energy projects. Such policies are now stipulated separately in various statutes. In some instances, there are conflicting rules and regulations between different laws governing the same issues. To overcome these difficulties, the deputy prime minister recently requested and assigned the Ministry of Industry and Trade to fast-track a draft decision of the prime minister’s office on the strategy and general planning for development of renewable energy in Vietnam up to 2030, with a vision towards 2050. The draft plan is awaiting the prime minister’s approval.

Third, and most importantly, Vietnam lacks an effective and feasible mechanism for investor financing as it relates to the sales price of wind power. Currently, the Vietnam Electricity Group (EVN) is the exclusive transmitter, purchaser, and distributor of power. The sales price for power in Vietnam is always the highest hurdle for investors to overcome, and in practice, the set prices for power purchase by the EVN monopoly are always much lower than the actual input costs. As encouragement, the state assists investors by providing a subsidy for the difference in contract price (see Decision 130). But these subsidies are often insufficient and limited to the amount set aside in the state fund. As a result, investors remain cautious of their risks when investing in this field.

To calm investors’ anxieties, the Ministry of Industry and Trade very recently completed and submitted to the government, for its consideration and approval, a draft decision on promulgating regulations on investment and construction of wind power projects in Vietnam. The draft indicates EVN will assist in the connection of wind-generated power to the power grid and be liable for purchasing and distributing all products from wind power projects. In particular, EVN will pay VND 1,317 (approximately USD 0.07) for each kilowatt of wind-generated power, and the state will subsidize an amount of VND 185 (approximately USD 0.01).

Furthermore, under the draft plan, wind power investors will enjoy import tax exemption on machinery and equipment, corporate income tax at 10 percent for the life of the project, land-use tax exemption for the duration of the project, and access loans up to 80 percent of the total investment capital along with preferential interest rates.

Project Restrictions

At present, there are no statutory prohibitions relating to the development of coastal areas as it pertains to energy investors, either foreign or Vietnamese. Legislation on investments only prohibits projects that:

  • Are detrimental to national defense and security and/or the public interest.
  • Are detrimental to historical and cultural traditions and ethics, and Vietnamese fine customs.
  • Harm the people’s health, or destroy natural resources and the environment.
  • Treat toxic wastes brought into Vietnam, or are projects for the manufacture of any type of toxic chemicals or for the use of chemical agents prohibited by international treaties.

Subject to the above exceptions, investors enjoy the right to invest in other projects without restrictions as to location within Vietnam, provided that the investor satisfies all conditions and procedures in accordance with the law.

Wind Projects in Vietnam

Among alternative energy sources, wind power may represent the strongest growth opportunity in Vietnam. Surveys have shown that approximately 85 percent of Vietnam’s land has an elevation and average wind speed that is suitable for generating wind power. Experts from the World Bank have concluded that Vietnam has the ability to generate 513,360 megawatts annually through wind power—10 times the projected national electricity capacity for 2020.

The coastal provinces of Binh Thuan and Ninh Thuan, in particular, are considered to have the greatest potential for wind power in large plots of land that are arid and not agriculturally fertile. At present, there are more than 20 wind power projects in Vietnam, mainly located in Binh Thuan (12 projects on the mainland and Phu Quy Island District), Ninh Thuan, Binh Dinh, Phu Yen, and Con Dao Island District of Ba Ria-Vung Tau province, where the volume and average wind speed are highest compared to the rest of the country.

Of these, the wind power projects in Binh Thuan and Ninh Thuan of the Vietnam Renewable Energy Joint Stock Company (REVN) stand out because of their size. REVN is the owner of Tuy Phong Wind Power Factory located in Binh Thanh commune, Tuy Phong district, Binh Thuan province. Phase 1, consisting of 20 turbines, was just completed with a capacity of 30 megawatts. The project was put into operation (i.e., began generating power) as of March 2011 with a total investment capital of VND 1.5 billion. REVN is now carrying out phase 2 of this project at both Binh Thanh and Chi Cong communes, with an anticipated capacity of 90 megawatts, and total investment capital of VND 4.5 billion. The project, which is now being implemented,will be concluded by 2015.

In Ninh Thuan province, REVN is building Wind Power Factory 1 located at Phuoc Minh commune, Thuan Nam district, with an anticipated capacity of 30 megawatts, including 15 turbines, and a total investment capital of VND 1.35 billion. Operations are expected to begin in 2012. All remaining projects are either in the surveying stage or under construction.

Outlook

Based on projected energy consumption levels, Vietnam will need to secure new sources of energy to maintain its economic growth. The state has given positive signals that it is committed to solar and wind energy over the long term, and these signals have been backed up by the implementation of a wide range of incentives and commitments to a more cohesive plan for renewable energy development in the years to come. As this legal framework develops, solar and wind projects may emerge as one of the most attractive fields for foreign investment in Vietnam.

RELATED INSIGHTS​ 

June 3, 2024
Nearly a year after Vietnam’s issuance of its National Power Development Plan for 2021-2030, with a vision to 2050 (“PDP VIII”), the Prime Minister issued Decision No. 262/QD-TTg dated April 1, 2024, approving the Implementation Plan for PDP VIII (“Implementation Plan”). Among other contents, the Implementation Plan sets forth the list of prioritized power source projects through 2030, and the capacity of renewable energy sources through 2030, as detailed below. Prioritized Power Source Projects through 2030 The Implementation Plan lists out six types of power source projects prioritized for development through 2023 according to the capacity approved under PDP VIII. They include: Domestic gas-fired power (14,930 MW) LNG-fired power (22,400 MW) Coal-fired power (30,127 MW) Cogeneration power using residual heat, blast furnace gas, and by-products of technological lines in industrial facilities (2,700 MW) Hydropower (29,346 MW) Pumped storage hydropower (2,400 MW) With respect to each type, the Implementation Plan provides details of projects by location and their operational progress. Such information is set out in Schedule III of the Implementation Plan. For power source projects not included in this list, the provincial People’s Committees will consult with the Ministry of Industry and Trade (“MOIT”) and relevant agencies on compliance with the planning prior to appraisal and issuance of in-principle investment approval. Renewable Energy Projects through 2030 The Implementation Plan allocates the capacity of the following renewable energy sources by locality/region: Offshore wind power (6,000 MW) Onshore wind power (21,880 MW) Hydroelectric power (29,346 MW) Biomass electricity (1,088 MW) Electricity produced from waste (1,182 MW) Rooftop solar power for self-production and self-consumption (2,600 MW) Battery storage (300 MW) With respect to each renewable energy source, the Implementation Plan provides a list of certain renewable energy projects through 2030, including the expected life cycle of the projects, and the allocated capacity
April 29, 2024
On November 4, 2021, Cambodia’s Ministry of Mines and Energy (MME) issued a Prakas No. 0305 on Management of the Steam Energy Subsector within the Energy Sector. The prakas aims to regulate steam energy operations, and requires companies wishing to develop, build, install, or operate steam energy to apply for a steam energy license. As this is the first prakas regulating steam energy operations in Cambodia, all relevant companies operating in steam energy must apply for a steam energy license with the MME. Prakas 0305 discusses permits for three types of activities: Development, Construction, Installation, and Operation of Steam Energy. Companies wishing to develop, build, install, and operate steam energy production facilities must first apply for a permit from the MME. Steam Energy Service Provision. Companies wishing to develop, build, install, and operate steam energy for the purpose of supplying steam energy to consumers must apply for a permit for steam energy service provider in addition to a permit for development, construction, installation, and operation of steam energy. Two-in-One Steam Energy and Electricity Production. Companies wishing to develop and operate both steam energy and electricity production activities must also apply for a permit for two-in-one steam energy and electricity production. Companies operating without the necessary permits are subject to a daily fine of KHR 400,000–4,000,000 (approx. USD 100–1,000). In addition, they may face other penalties, including: An order to halt business activities; Permit suspension; Permit revocation; Judicial action; and Other legal measures as the MME deems fit. For more information on regulations and requirements for steam energy licenses in Cambodia, please contact Tilleke & Gibbins at [email protected].
January 25, 2024
Thailand’s Department of Mineral Fuels (DMF) has developed a framework to regulate carbon capture and storage (CCS) and related activities by introducing “carbon business” to the draft amendment to the Petroleum Act B.E. 2514 (1971). CCS involves the capture, treatment, transport, and underground storage of carbon dioxide produced from industrial power generation. The captured carbon can be used to enhance oil recovery, converted into fuel such as methane or DME (dimethyl ether), or converted to higher-value products. In Thailand, various companies have carried out CCS feasibility studies. Carbon Business and Licensing Under the draft amendment to the Petroleum Act, “carbon business” is defined as exploration for purposes of carbon storage or compression of carbon into carbon storage, while “carbon” is defined as carbon dioxide in the state of gas or supercritical fluid generated as a byproduct or captured from other sources and transported for storage. Any concessionaire, product-sharing contractor, or service contract holder that has been granted permission to explore for or produce petroleum under the Petroleum Act can apply for a carbon business license from the director-general of the DMF with the approval of the Petroleum Committee. Licenses are also available to any other parties who meet the eligibility criteria to be prescribed later by a ministerial regulation. Licenses for these parties will be allocated through competitive bidding according to procedures to be announced by the minister of the Ministry of Energy (MOE). In granting a license, the minister of the MOE and the director-general of the DMF will consider the geological suitability of carbon storage, storage systems, surrounding areas of carbon storage, risk of carbon leakage and movement, environmental impacts, and the applicant’s financial potential and ability in environmental management. Responsibilities of Carbon Business Operators Carbon business operators are required to monitor and inspect their installations, structures,
January 10, 2024
On December 15, 2023, the Electricity Authority of Cambodia (EAC) issued a notification requiring all owners of solar power systems to report their systems to their local electricity supplier by January 31, 2024. Systems that have already been reported under existing regulations are exempt from this requirement. Systems that remain unreported after the deadline will be deemed illegal and subject to penalties, including possible disconnection from the national grid. The rationale for the reporting requirement is that the EAC expects to adopt a new solar power regulation soon. Electricite du Cambodge (the main state-owned utility provider in Cambodia) and EAC-licensed private electricity providers are now gathering data on the current use of solar power systems in order to prepare for, adopt, and execute the upcoming regulation. The reporting requirement is to facilitate this gathering of data. The upcoming regulation, planned for early 2024 according to the notification, follows last year’s Prakas No. 159, which contained the Ministry of Mines and Energy’s guidelines and principles for rooftop solar systems. The EAC now needs to issue implementing regulations that are in line with the ministry’s guidelines and principles. Although stand-alone solar power systems that did not have a connection to the national grid were previously not regulated and did not require any authorizations, the EAC is now stating that all types of solar power systems need to adhere to the reporting requirement under the notification. According to the EAC, the upcoming regulation will address all types of systems, and the December 15 notification clearly announces that all types of solar power systems will need to obtain EAC approval under the upcoming regulation. Solar power system operators in Cambodia should report their systems to their local electricity providers by January 31, 2024, to avoid any penalties, while remaining vigilant for the upcoming