Solar and wind energy are clean, renewable sources that are becoming increasingly popular in many countries, especially in developing economies such as Vietnam. Realizing the importance, advantages, and benefits of such sustainable sources of energy, and facing an increasing demand for electricity supply for further economic development (with consistent annual electricity consumption increases of 10–15 percent), Vietnam decided recently to give greater scrutiny to studying, surveying, encouraging, and supporting investors, both foreign and domestic, investing in renewable energy projects.

Development of new and renewable energy was included in Vietnam’s national energy development strategy through 2020, with a vision towards 2050, as promulgated in Decision 1855. This strategy sets specific targets to increase the proportion of new and renewable energy sources to 3 percent of total commercial primary power by 2010, 5 percent by 2020, and 11 percent by 2050. To reach these targets, Decision 1855 also guides the direction and orientation for development together with policies, incentives, and governmental support to attract investors. These goals are reflected in various pieces of legislation.

Advantages for Investors

Under current legislation, investors are entitled to maximum incentives for every aspect related to solar or wind energy projects, such as land or water surface lease terms and fees, corporate income tax, value-added tax, import and export duties, land site clearance, and depreciation of fixed assets, among others. In addition, solar and wind power projects are considered clean investments under the country’s clean development mechanism (see Decision 130). Accordingly, investors are subsidized by the state through the Environmental Protection Fund of Vietnam for the difference between the real input costs and the sales price of power as agreed to in the contract to provide power generated by solar or wind energy (see Decree 58).

Challenges for Investors

Although enjoying a variety of incentives, investors also face several challenges when investing in these kinds of projects. First, at present, Vietnam has not yet conducted any official or comprehensive surveys, studies, or assessments on the potential of solar or wind energy in Vietnam. Thus, prospective investors may lack necessary information when seeking investment opportunities.

Second, Vietnam does not have a cohesive legal framework governing policies related to solar or wind energy projects. Such policies are now stipulated separately in various statutes. In some instances, there are conflicting rules and regulations between different laws governing the same issues. To overcome these difficulties, the deputy prime minister recently requested and assigned the Ministry of Industry and Trade to fast-track a draft decision of the prime minister’s office on the strategy and general planning for development of renewable energy in Vietnam up to 2030, with a vision towards 2050. The draft plan is awaiting the prime minister’s approval.

Third, and most importantly, Vietnam lacks an effective and feasible mechanism for investor financing as it relates to the sales price of wind power. Currently, the Vietnam Electricity Group (EVN) is the exclusive transmitter, purchaser, and distributor of power. The sales price for power in Vietnam is always the highest hurdle for investors to overcome, and in practice, the set prices for power purchase by the EVN monopoly are always much lower than the actual input costs. As encouragement, the state assists investors by providing a subsidy for the difference in contract price (see Decision 130). But these subsidies are often insufficient and limited to the amount set aside in the state fund. As a result, investors remain cautious of their risks when investing in this field.

To calm investors’ anxieties, the Ministry of Industry and Trade very recently completed and submitted to the government, for its consideration and approval, a draft decision on promulgating regulations on investment and construction of wind power projects in Vietnam. The draft indicates EVN will assist in the connection of wind-generated power to the power grid and be liable for purchasing and distributing all products from wind power projects. In particular, EVN will pay VND 1,317 (approximately USD 0.07) for each kilowatt of wind-generated power, and the state will subsidize an amount of VND 185 (approximately USD 0.01).

Furthermore, under the draft plan, wind power investors will enjoy import tax exemption on machinery and equipment, corporate income tax at 10 percent for the life of the project, land-use tax exemption for the duration of the project, and access loans up to 80 percent of the total investment capital along with preferential interest rates.

Project Restrictions

At present, there are no statutory prohibitions relating to the development of coastal areas as it pertains to energy investors, either foreign or Vietnamese. Legislation on investments only prohibits projects that:

  • Are detrimental to national defense and security and/or the public interest.
  • Are detrimental to historical and cultural traditions and ethics, and Vietnamese fine customs.
  • Harm the people’s health, or destroy natural resources and the environment.
  • Treat toxic wastes brought into Vietnam, or are projects for the manufacture of any type of toxic chemicals or for the use of chemical agents prohibited by international treaties.

Subject to the above exceptions, investors enjoy the right to invest in other projects without restrictions as to location within Vietnam, provided that the investor satisfies all conditions and procedures in accordance with the law.

Wind Projects in Vietnam

Among alternative energy sources, wind power may represent the strongest growth opportunity in Vietnam. Surveys have shown that approximately 85 percent of Vietnam’s land has an elevation and average wind speed that is suitable for generating wind power. Experts from the World Bank have concluded that Vietnam has the ability to generate 513,360 megawatts annually through wind power—10 times the projected national electricity capacity for 2020.

The coastal provinces of Binh Thuan and Ninh Thuan, in particular, are considered to have the greatest potential for wind power in large plots of land that are arid and not agriculturally fertile. At present, there are more than 20 wind power projects in Vietnam, mainly located in Binh Thuan (12 projects on the mainland and Phu Quy Island District), Ninh Thuan, Binh Dinh, Phu Yen, and Con Dao Island District of Ba Ria-Vung Tau province, where the volume and average wind speed are highest compared to the rest of the country.

Of these, the wind power projects in Binh Thuan and Ninh Thuan of the Vietnam Renewable Energy Joint Stock Company (REVN) stand out because of their size. REVN is the owner of Tuy Phong Wind Power Factory located in Binh Thanh commune, Tuy Phong district, Binh Thuan province. Phase 1, consisting of 20 turbines, was just completed with a capacity of 30 megawatts. The project was put into operation (i.e., began generating power) as of March 2011 with a total investment capital of VND 1.5 billion. REVN is now carrying out phase 2 of this project at both Binh Thanh and Chi Cong communes, with an anticipated capacity of 90 megawatts, and total investment capital of VND 4.5 billion. The project, which is now being implemented,will be concluded by 2015.

In Ninh Thuan province, REVN is building Wind Power Factory 1 located at Phuoc Minh commune, Thuan Nam district, with an anticipated capacity of 30 megawatts, including 15 turbines, and a total investment capital of VND 1.35 billion. Operations are expected to begin in 2012. All remaining projects are either in the surveying stage or under construction.

Outlook

Based on projected energy consumption levels, Vietnam will need to secure new sources of energy to maintain its economic growth. The state has given positive signals that it is committed to solar and wind energy over the long term, and these signals have been backed up by the implementation of a wide range of incentives and commitments to a more cohesive plan for renewable energy development in the years to come. As this legal framework develops, solar and wind projects may emerge as one of the most attractive fields for foreign investment in Vietnam.

RELATED INSIGHTS​ 

January 27, 2025
Thailand’s Ministry of Energy (MOE) has announced the launch of the 25th bidding round for petroleum exploration and production. This round offers nine greenfield onshore blocks—seven in northeastern Thailand and two in central Thailand—encompassing over 33,000 km². The bids can be submitted from July 1 to July 16, 2025. The sizes and locations of these blocks are: Northeast Thailand Block L1/66: 3,223.51 km² (Khon Kaen, Nong Bua Lam Phu, Udon Thani) Block L2/66: 3,917.03 km² (Kalasin, Sakon Nakhon, Udon Thani) Block L3/66: 3,918.22 km² (Kalasin, Khon Kaen, Maha Sarakham, Udon Thani) Block L4/66: 3,656.65 km² (Amnat Charoen, Mukdahan, Nakhon Phanom, Yasothon) Block L5/66: 3,436.01 km² (Chaiyaphum, Khon Kaen, Nakhon Ratchasima) Block L7/66: 3,438.51 km² (Buri Ram, Maha Sarakham, Nakhon Ratchasima, Roi Et, Surin, Khon Kaen) Block L9/66: 3,885.44 km² (Nakhon Ratchasima) Central Thailand Block L6/66: 3,966.86 km² (Chaiyaphum, Lop Buri, Phetchabun) Block L8/66: 3,957.41 km² (Kanchanaburi, Nakhon Pathom, Ratchaburi, Suphan Buri) Bidding Process Interested companies must submit their bids to the Department of Mineral Fuels (DMF) between July 1 and July 16, 2025. Bids should include: Application form (ChorThor/Por1) Proof of eligibility: Corporate documentation, audited financial statements, and proof of resources Technical and commercial proposals: Exploration plans, geological surveys, financial and work commitments, and special benefits such as signing bonuses of at least USD 100,000. There is a nonrefundable THB 50,000 application fee per block, and applicants must provide a bid bond of THB 3 million per block via an unconditional bank guarantee from a commercial bank with branches in Thailand, valid for at least one year from the bidding submission date. The guarantee will be returned to unsuccessful bidders upon request and to successful bidders upon the signing of the concession agreement. Eligibility Bidders must meet the following main eligibility criteria: Bidders must be limited companies with the following qualifications: The company must have the objective of
January 23, 2025
In 2023, compliance inspections by Vietnam’s Government Inspectorate identified several violations of policies and laws in the management and implementation of planning and investment in renewable energy projects. Since then, many renewable energy enterprises and projects have encountered significant operational challenges. In December 2024, the Ministry of Industry and Trade (MOIT) issued two reports, Report 321/BC-BCT and Report 345/BC-BCT, to implement the 2023 Inspection Conclusion of the Government Inspectorate and address obstacles faced by renewable energy enterprises, Investors in renewable energy projects in Vietnam should carefully consider the potential impacts of proposed solutions in these reports. The reports re-emphasize the types of violations related to renewable energy projects identified in the Inspection Conclusion, with a significant expansion in the number of affected projects. Key violations include: (i) misapplication of FIT (feed-in tariff) incentives; (ii) recognition of COD (commercial operation date) and receipt of FIT prices without written approval of construction acceptance; (iii) overlap with mineral planning, irrigation planning, national defense land use, or other restricted land uses; (iv) incomplete land procedures and documentation; and (v) installation of rooftop solar on agricultural and forestry land used for farming and aquaculture models. Further, these reports mention the government’s solutions to resolve difficulties for renewable energy projects, which include: Allowing additional planning where projects do not violate national security. Allowing rectification of projects’ violations in land and construction process as per law. For projects violating planning on minerals, irrigation, or defense, socio-economic efficiency will be assessed for adjustments or integration. Adjusting electricity prices and recovering incorrect FIT prices for projects not meeting conditions. Requiring rooftop solar projects on non-farming land to comply with regulations or, if land violations occur, FIT prices will be revoked, and electricity prices must be redetermined and recovered. For items (iv) and (v), the authority will issue regulations
January 14, 2025
Thailand’s Department of Industrial Works (DIW) has issued a new regulation (Ministerial Regulation Re: Designation of Type, Kind, and Size of Factories (No. 3) B.E. 2567 (2024)), which removes the factory license requirement for electricity generation from solar energy installations on rooftops, roof decks, or any part of a building used for residential or other purposes, regardless of capacity. The new rules took effect on December 28, 2024. Under the previous regulations, solar rooftop installations had to seek approval from the DIW if their capacity exceeded 1,000 kW (1 MW), which added time and administrative costs when adopting renewable energy solutions. Benefits and Further Compliance The updated regulation benefits industrial operators by facilitating faster installation times and lower costs, as solar rooftops can now be installed without the need for prior approval of a factory license from the DIW. Operators can now more easily contribute to environmental sustainability and carbon reduction efforts. Despite the lifting of the factory licensing requirement, other compliance obligations, such as an energy business license (or exemption from an energy business license), a controlled energy production license, and a construction permit, may still apply. Reason for the Change Removing the classification of rooftop or building-installed solar power plants as factories aligns with Thailand’s renewable energy goals and reduces regulatory burdens for industrial operators. Additionally, it supports the achievement of energy policies aligned with the UN’s Sustainable Development Goals and Thailand’s international commitments to reduce greenhouse gas emissions through the participation of all sectors. For further details on how this change affects business operations or to explore strategies for renewable energy implementation, please contact Supasit Boonsanong at [email protected], Charuwan Charoonchitsathian at [email protected], or Phareeya Yongpanich at [email protected].
December 4, 2024
Thailand Legal Basics, a valuable primer for foreign investors, explores all aspects of living and doing business in Thailand. Written by specialists at Tilleke & Gibbins in Bangkok, it is the only comprehensive English-language guide to the Thai legal system with a focus on the concerns of foreign business and investment.