You are using an outdated browser and your browsing experience will not be optimal. Please update to the latest version of Microsoft Edge, Google Chrome or Mozilla Firefox. Install Microsoft Edge

August 26, 2024

Cambodia Clarifies Registration Process for Pre-1997 Co-owned Buildings

On July 19, 2024, Cambodia’s Ministry of Land Management, Urban Planning, and Construction (MLMUPC) issued Prakas No. 050 on the Formalities and Procedure for Registration of Private Units in Co-owned Buildings Constructed before December 19, 1997. This new regulation aims to address the lack of clear guidelines for registering units in co-owned buildings constructed prior to 1997 and ensure protection of legal ownership rights for private owners of co-owned buildings constructed before December 19, 1997.

Background

Cambodia’s real estate market, including co-owned buildings and condominiums, has been experiencing rapid growth. As more individuals acquire separate units in co-owned buildings, the demand for proper registration of each unit has increased. While existing mechanisms like Sub-Decree No. 46 on Systematic Land Registration and Sub-Decree No. 48 on Sporadic Land Registration provide frameworks for registering immovable properties, they do not specifically address the registration procedure for co-owned buildings constructed before 1997.

Definition of Co-owned Building

A co-owned building contains “private units” exclusively owned by individual co-owners and “common areas” used by all co-owners. This includes various categories such as villas, semi-villas, attached houses, condominiums, and other types of houses with common structures.

Application Documents

The new prakas introduces a more straightforward documentation process for registering private units in buildings constructed before December 19, 1997, compared to previous regulations (specifically, Sub-Decree No. 126 on the Management and Use of Co-Owned Buildings). The required application documents now include:

  • One copy of application form in Khmer
  • Two copies of certified identification documents for each co-owner
  • Two copies of certified documents of property ownership (if any)

Notably, certain documents, such as the internal regulations and detailed architectural plan of the co-owned building, are not required. These more lenient requirements encourage more owners to register their private units, as it makes it easier to secure certificates and comply with the law.

Procedure

Private units in co-owned buildings constructed before December 19, 1997, that have not been registered through the land systematic registration process may be registered through an additional sporadic land registration procedure in accordance with the existing applicable regulations.

Cambodia’s sporadic land registration mechanism, also known as “individual land registration,” allows a landholder to apply individually to the competent authority for a land certificate. This process enables each owner to register their units without requiring all owners to register all units together. This makes it easy for the owners to obtain the certificates for their respective units without having to wait for others.

The original immovable property certificates or other proof of legal possession must be submitted to the cadastral administration to obtain new certificates of ownership for private units. The old certificates or proof of legal possession will be nullified and retained by the cadastral administration.

Conclusion

This prakas establishes a clear framework for regulating ownership of private units in Cambodia. It enables authorities to better monitor the safety and legality of older buildings, ensuring compliance with current construction regulations and standards, and its implementation provides significant benefits to owners of private units in co-owned buildings constructed before December 19, 1997. The prakas serves as a reminder for these owners to apply for ownership certificates for their private units.

However, the current regulations do not clarify whether foreign nationals who own units in buildings constructed before 1997 can register or transfer their units to other foreigners. In practice, it appears that foreign parties are still unable to register these units or transfer ownership to another foreigner. This situation creates challenges for foreign buyers who have already purchased such units.

It is anticipated that future regulations may address this issue, providing clarity and potential solutions for foreign nationals to register the units they already purchased.

For more information on how this new prakas may affect property holdings or investment strategies in Cambodia, please contact Tilleke & Gibbins at [email protected].

RELATED INSIGHTS​ 

April 16, 2025
The recent earthquake in Myanmar on March 28, 2025, that also significantly affected parts of northern Thailand and Bangkok has raised concerns about building safety and structural resilience in Thailand. This event has reminded building owners and possessors in Thailand of the necessity of understanding earthquake-resistant building standards, their legal obligations regarding structural inspections, and compliance requirements under Thai law. Under Thai law, building owners and possessors have specific responsibilities regarding the structural integrity of their properties, particularly in areas prone to seismic activity. This article lays out the key legal requirements and outlines the potential penalties for noncompliance. Structural Design and Earthquake Resistance Requirements With respect to standards regarding earthquake resistance, Thailand’s Ministry of Interior has issued the Ministerial Regulation on Load Bearing, Durability, and Resistance of Buildings and Soil Foundations to Earthquake Forces B.E. 2564 (2021), replacing a previous ministerial regulation from 2007. The current ministerial regulation prescribes certain types of buildings in 43 designated provinces to comply with seismic design standards. These 43 provinces can be categorized into three main zones: Zone 1: Areas requiring monitoring due to the potential for impact on the structural integrity and stability of buildings when exposed to seismic waves, consisting of 14 provinces (e.g., Krabi, Surat Thani, Prachuap Khiri Khan, etc.). Zone 2: Areas where there may be moderate impact on the structural integrity and stability of buildings when exposed to seismic waves, consisting of 17 provinces (e.g., Bangkok, Nonthaburi, etc.) Zone 3: Areas where there may be significant impact on the structural integrity and stability of buildings when exposed to seismic waves, consisting of 12 provinces (e.g., Chiang Mai, Chiang Rai, Kanchanaburi, etc.) For buildings located in these categorized zones, the geometric configuration of the building structure must be designed to ensure stability in resisting seismic waves. Additionally, structural
March 4, 2025
On February 20, 2025, the National Assembly of Vietnam made public the executed Resolution 170/2024/QH15, which outlines special mechanisms and policies to address difficulties and obstacles related to notable real estate projects and land issues in Da Nang, Ho Chi Minh City, and Khanh Hoa Province. This resolution, with an effective date of April 1, 2025, aims to resolve issues identified in inspection conclusions, audits, and court judgments, including 1,313 cases of land-use term violations in Da Nang. Solutions Resolution 170 provides a variety of mechanisms and policies to clear the way for projects to proceed with implementation. These may include, depending on the specific location, the following solutions. For issued Land Use Rights Certificates (LURC) that violate the land-use term for business production land in Da Nang: For projects that have already been invested in and utilized, the land-use terms in the LURC may be adjusted to 50 years from the date of the decision on land allocation, land lease, conversion of land use purpose, or actual land handover. For continued use of land, determining land prices, and calculating land use fees and land rental fees applicable to a list of projects in Da Nang, Ho Chi Minh City, and Khanh Hoa Province: The city/provincial People’s Committees will review and complete, within their authority, the procedures related to land, investment, construction, environment, and forestry of such projects in accordance with the current laws. Projects that meet legal and regulatory requirements after thorough review and compliance checks will be allowed to continue, provided they are aligned with urban planning, environmental standards, and national security requirements. In addition, investors must fulfill applicable financial obligations, including land use fees and land rental payments, which will be reassessed and collected based on the land price tables applicable in Da Nang, Ho Chi
February 21, 2025
As Vietnam continues its government restructuring, including the merging of several key ministries, the country is signaling that mergers of provinces could be next. Conclusion 126-KL/TW of the Politburo and Secretariat, issued on February 14, 2025, sets out several tasks for continuing to streamline the political system in 2025, notably including, among others, the following: Elimination of intermediate administrative levels, and mergers of provincial units: The Government Party Committee is tasked with researching and planning for the elimination of intermediate administrative levels (district levels); reorganizing the commune level with structures, functions, duties, powers, and responsibilities aligned with the new organizational model; and proposing the merging of some provincial administrative units. A report to the Politburo is required by Q3 2025. Reorganization of police structure: The Central Public Security Party Committee is tasked with leading and coordinating the implementation of a three-tier police organization, eliminating the district-level police. Judicial system reforms: The Central Party Committees of the Supreme People’s Court and the Supreme People’s Procuracy are tasked with researching and advising on the organizational model for courts and procuracies, and proposing amendments and supplements to relevant party mechanisms and state laws, with the aim of eliminating the district level. A report to the Politburo is required by Q2 2025. Implications of Merging Provinces The merging of provinces could bring positive impacts as well as new challenges. The expected benefits include: Administrative efficiency and cost saving: Reducing the number of administrative units could lead to more efficient governance and decision-making processes, as well as lower administrative costs due to fewer government offices and personnel. Economic development: Larger administrative areas can benefit from better allocation of resources and infrastructure development. Larger provinces may also attract more investment due to increased economic potential and market size. Improved service delivery: Public services could improve
January 16, 2025
On January 13, 2025, Thailand’s cabinet approved in principle the draft Entertainment Complex Act, as proposed by the Ministry of Finance. This landmark legislative proposal, which would allow casinos as part of larger “entertainment complexes,” will now proceed through further parliamentary review and approval. Key provisions of the draft act are described below. Corporate structure: Entertainment complexes must be operated by Thai-registered limited companies or public limited companies with a minimum paid-up capital of THB 10 billion. Directors of the licensed entity must be individuals and have the qualifications and none of the prohibited characteristics specified in the draft act. The draft act does not impose restrictions on foreign-majority ownership structures; however, it is worth monitoring whether any amendments addressing this matter are introduced during the legislative process. Operating conditions: Each entertainment complex must be located in an area designated under a royal decree. It must also include at least four types of entertainment businesses listed in the annex to the draft act (e.g., shopping mall, hotel, sports stadium, amusement park), along with a casino. The allocation of casino space must comply with regulations to be specified at a later date. Licensing conditions: Licenses will be valid for 30 years, renewable in increments of up to 10 years. The license issuance fee is THB 5 billion, the annual fee is THB 1 billion, and the renewal fee is THB 5 billion. The Entertainment Complex Policy Committee, chaired by the prime minister, will review and approve applications. Online gambling restrictions: Licensees are prohibited from offering gambling through internet-connected systems or electronic devices that allow access from outside the casino premises. Labor requirements: Thai and foreign employee ratios must adhere to prescribed regulations. Land privileges: Lease agreements for land use are limited to 50 years. Renewal is permitted for up to