You are using an outdated browser and your browsing experience will not be optimal. Please update to the latest version of Microsoft Edge, Google Chrome or Mozilla Firefox. Install Microsoft Edge

May 19, 2020

Vietnam Issues New Regulations on Building and Operating Golf Courses

In Vietnam, golf is gaining in popularity, and the country is also becoming a popular destination for golfing vacationers. The country has about 35 courses in operation and many more in the pipeline. Most of the courses are found on the outskirts of major cities like Hanoi and Ho Chi Minh City, or near resort areas such as Da Nang, Nha Trang, Vung Tau and Dalat.

New legislation has been passed to help clarify the regime for investment in golf course projects, and to help ensure the prompt completion of projects and efficient use of land. Specifically, On April 27, 2020, the government of Vietnam issued Decree No. 52/2020/ND-CP on investment in construction and commercial operation of golf courses (Decree 52). This decree will come into effect on June 15, 2020.

According to Decree 52, the area of a standard 18-hole golf course must not exceed 90 hectares (not more than 5 hectares per hole, on average), and the area of a newly built golf course project must not exceed 270 hectares (54 holes). The investor must complete the construction of a golf course within a maximum of 36 months for an 18-hole course, or a maximum of 48 months for other types of golf courses, from the date of issuance of the land lease decision.

Moreover, an investor implementing a golf course project must:

  • Satisfy the conditions on financial capacity and the conditions on land lease and/or permission to convert land use purpose for implementing the golf course project in compliance with the laws on land; and pay a deposit for the assurance of project implementation (for cases requiring such deposit) in compliance with the laws on investment;
  • Provide appropriate solutions, plans, and commitments relating to resettlement, training, and employment assistance for the current users of land expected to be used for the golf course project and local laborers; and
  • Ensure the fulfillment of necessary requirements and conditions relating to transport, electricity, and water infrastructure, wastewater treatment, and environmental protection.

Decree 52 also provides a list of types of land which are not permitted to be used for construction of golf courses and auxiliary works, which includes the following:

  • Land used for the purposes of national defense and security;
  • Forest land and rice paddy land (with limited exceptions);
  • Land located in areas containing original constituents of classified cultural and historical sites or classified beauty spots, or relics included in the inventory list of provincial People’s Committees (with limited exceptions);
  • Land for construction of industrial parks, industrial clusters, concentrated IT parks, and high-tech parks;
  • Land located inside the protected areas of dikes and coastal protection corridors in accordance with Law on Dikes and the Law on Natural Resources and Environment of the Sea and Islands.

In addition, investors are prohibited from taking the following actions related to investment in construction and commercial operation of golf courses:

  • Building or operating golf courses without having met the conditions and procedures prescribed by Decree 52 and other related laws;
  • Taking advantage of the operations of golf courses to organize illegal betting or gambling activities;
  • Obstructing or failing to comply with examination and inspection by competent state management agencies in accordance with the law; and
  • Failing to provide information or failing to report as requested by competent state management agencies in accordance with the law.

Golf has been developing quickly in many regions of Vietnam, and it is expected that Decree 52 will help accelerate investment further, while minimizing any negative impacts.

For more details on Decree 52, please contact us at [email protected].

RELATED INSIGHTS​ 

September 10, 2021
Thailand’s Ministry of Interior has issued new regulations requiring owners, occupants, and operators of certain types of buildings to obtain third-party life, body, and property liability insurance. The Ministerial Regulations Prescribing the Type or Category of Buildings Which Must Apply for Legal Liability Insurance B.E. 2564 (2021) were announced in the Government Gazette on September 6, 2021, and will come into effect on November 5, 2021. The new regulations, which repeal and replace similarly titled regulations from 2005, detail third-party liability insurance rules, procedures, conditions, and minimum insurance amounts for specific building types and activities. The new regulations clearly distinguish the building use phase from the construction, modification, relocation, and demolition phases. They also add a new requirement for the owner, occupant, or operator of large buildings to apply for third party liability insurance during the construction, modification, relocation, and demolition phases. Building Construction, Modification, Relocation, and Demolition When a permit for construction, modification, relocation, or demolition is granted for a building classified as a high-rise, large, or extra-large building, the owner, occupant, or operator who obtained the permit must apply for third-party liability insurance before work begins. If work is already in progress when the regulations come into effect, the permit holders will have 30 days to apply for third party liability insurance covering the remainder of the period specified in the permit. Building Usage Owners or occupiers of public assembly buildings, hotels with more than 80 rooms, entertainment venues of 200 square meters or more, and large freestanding or building-attached signboards and support structures must also apply for third party liability insurance covering accidents related to the condition or use of the structures. Owners or occupiers have 30 days from the completion of the construction, modification, relocation, or change of use of the buildings, as the case
September 7, 2021
“Condominium” combines the Latin roots com (“together”) and dominium (“right of ownership or property”) into a word that literally means “shared property.” This shared ownership of property—which in the condominium’s case has come to mean a large building of residential units—has been enormously popular in Bangkok and other Thai cities, and regardless of the economic situation in Thailand, condominiums continue to be attractive to Thai people and foreign investors due to their favorable locations, pleasant common spaces, access to convenient methods of transportation, and reasonable prices. The land available for “low-rise” buildings—such as detached houses, townhouses, twin houses, or commercial constructions—is expected to become progressively scarcer in urban areas, with condominiums or “high-rise” residences eventually becoming the residence of choice. Despite its advantages, living in condominiums involves the coming together of the people owning or leasing the units, so various conflicts among the owners or with the condominium juristic person are bound to arise from time to time. As a continuation of a similar discussion of condominiums that we wrote a few years ago, this article aims to provide some clarity to these issues by identifying some key elements of the legal framework governing condominiums, considering some of the more common disputes that arise, and suggesting legally sound resolutions to those disputes. Legal basics The main law governing condominiums in Thailand is the Condominium Act B.E. 2522 (1979), which establishes the following key definitions: Condominium. A building in which the ownership is divided into multiple parts consisting of individual personal properties and jointly owned common property. Personal property. A condominium unit, including constructions and land provided to each unit owner. Personal property can be divided into two main types: a “unit,” which refers to the parts of the condominium that are divided to be owned by different persons; and
August 31, 2021
A new regulation from Thailand’s Ministry of Interior grants a three-year extension for obtaining an alteration permit or a certificate to change the use of a hotel building. The eligibility period—which had been scheduled to expire on August 18, 2021—is now open until August 18, 2024. The extension was announced in the Government Gazette on August 6, 2021, after Ministerial Regulation Prescribing the Descriptions of Other Types of Buildings Which Can Be Used for a Hotel Business Operation (No. 3) B.E. 2564 (2021) was issued on August 2. The regulation, which is issued under the Building Control Act B.E. 2522 (1979), specifies which types of buildings can be used as “hotels providing accommodation only,” and which types can serve as “hotels providing accommodations and a restaurant, or a place for serving or cooking food.” This is the third such regulation, with previous versions being issued in 2016 and 2018 prescribing standards of the qualified buildings. The previous regulations set requirements for the following building features: The width of walkways in the building; The width and length of ladders; The maximum loading weight in all parts of the building; and The number of standard fire extinguishers installed on each floor. Moreover, the previous ministerial regulations stipulate that the building’s boundaries, height, space from other buildings, setback, and parking lots must comply with the building control regulations effective at the time of construction or alteration. These regulations also include requirements on additional fire alarm systems and emergency lighting system, as well as details on the fire escapes and ladders for buildings over a certain size. For more information on property and building regulations in Thailand, please contact Chaiwat Keratisuthisathorn at [email protected] or +66 2056 5507.