In 2015, the Ministry of Energy revised its Power Development Plan in order to provide a blueprint for Thailand’s energy priorities over the coming two decades. The PDP2015, as the Power Development Plan was called, was itself an update on previous development plans created by the Ministry of Energy in conjunction with the Electricity Generating Authority of Thailand (EGAT), which had last been updated in 2012. Consistent with this pattern, the Power Development Plan will be updated again in 2018 to revise the Ministry’s objectives in light of new facts on the ground.

The PDP2015 was devised as a government master plan alongside the Energy Efficiency Development Plan, the Alternative Energy Development Plan (AEDP), the Natural Gas Supply Plan, and the Petroleum Management Plan. The overarching objectives of the Ministry of Energy’s plans were set as: (1) energy security; (2) economy, and specifically maintaining appropriate costs of power generation and implementing energy efficiency; and (3) ecology, with a particular focus on reducing environmental and social impacts by lessening carbon dioxide intensity of power generation. In order to achieve these objectives, the Ministry of Energy realized that renewable energy sources would have to play a significant role.

AEDP2015

At the end of 2014, Thailand had installed capacity of 7,400.43 megawatts (MW) from renewable energy sources, including hydroelectricity. Of this, solar capacity amounted to 1,298.51 MW, whereas installed wind capacity only amounted to 224.47 MW. The Ministry of Energy set targets for renewable energy constituting approximately 20% of Thailand’s installed capacity by 2036. Targets for 2036 installed capacity for wind and solar were set at 3,002 MW and 6,000 MW, respectively. Given the state of renewables in Thailand at the time, these goals seemed fairly ambitious and many questioned whether the targets were overly optimistic.

By the end of 2017, it has become clear that the naysayers’ pessimism was misplaced. At the end of 2017, installed capacity for wind power had nearly tripled from 2014 levels, to 627.82 MW. Capacity for solar power was 2,692.26 MW at the end of 2017, which amounts to a doubling of generating capacity from 2014. The three years from 2014 to 2017 also saw increased capacity for power plants fueled by biomass, biogas, and municipal solid waste.

With Thailand already nearly halfway to its goal of 6,000 MW of installed solar capacity by 2036, and both demand and supply of solar power showing no signs of slowing down, the target appears to require upward revision. A revised target should be expected in the PDP2018. A report issued in November 2017 by the International Renewable Energy Agency (IRENA) puts 17,200 MW of installed solar photovoltaic (PV) capacity by 2036 as a realistic objective.

Policy Hurdles

Thailand is in the midst of a renewable energy revolution. Just three years ago it seemed fanciful to imagine renewable sources of energy accounting for approximately 20% of Thailand’s installed capacity by 2036; now, it seems feasible to imagine nearly half of the country’s installed capacity coming from renewables in 20 years. Given the abundance of solar energy potential, it is clear that solar PV will be the most significant driver of this revolution. Other renewable sources, such as wind and biomass, will also play significant roles in Thailand’s diversified energy mix. This will present the Ministry of Energy with a number of challenges which will require apt policy-making.

First is the problem of intermittency. Some renewable sources, most notably solar and wind power, can only produce electricity when weather conditions permit. Without sufficient baseload sources of energy, an overreliance on intermittent electricity generating sources may result in rolling blackouts. Technological advances with respect to energy storage, such as through more efficient batteries or pumped storage hydroelectricity, have the potential to reduce the impact of intermittency. The Ministry of Energy has taken the initiative to address this concern by instituting new firm or semi-firm capacity requirements in power purchase agreements (PPAs) with small power producers or very small power producers. The commitments in these PPAs essentially require the power producer to commit to certain specific feed-in targets. This may spur innovation with respect to storage, or lead to further hybrid power producing facilities with multiple fuel sources.

Secondly, the Ministry of Energy must contend with the untapped potential of rooftop solar PV installments in Thailand. At the moment, the inability of most producers to sell electricity generated by rooftop solar PV cells to a power distributor makes it economically difficult to justify incurring the still significant expense of installing PV panels. For factories or large business centres, where electricity use is highest during daylight hours, the economic case is much clearer as most of the electricity which is generated will be consumed immediately. For most residential buildings, by contrast, electricity use is generally higher when the sun is not shining. Without the ability to sell the electricity back to a distributor, there is little incentive for households to install rooftop solar PV panels. The Ministry of Energy has indicated a willingness to introduce a net metering scheme; the challenge will be to ensure that the feed-in-tariff rate is neither too low so as to not properly incentivize households, nor too high so as to cause a strain on government resources.

Conclusion

In 2015, the Ministry of Energy set ambitious targets for renewable energy development in Thailand. It appears now that the 2015 targets were too conservative, and that they will be met ahead of schedule. Thailand’s pivot toward renewables satisfies each of the stated objectives in the PDP2015, namely energy security, economy, and ecology. While a number of policy challenges remain, the potential for continued growth in Thailand’s renewable energy sector is evident.

RELATED INSIGHTS​ 

June 3, 2024
Nearly a year after Vietnam’s issuance of its National Power Development Plan for 2021-2030, with a vision to 2050 (“PDP VIII”), the Prime Minister issued Decision No. 262/QD-TTg dated April 1, 2024, approving the Implementation Plan for PDP VIII (“Implementation Plan”). Among other contents, the Implementation Plan sets forth the list of prioritized power source projects through 2030, and the capacity of renewable energy sources through 2030, as detailed below. Prioritized Power Source Projects through 2030 The Implementation Plan lists out six types of power source projects prioritized for development through 2023 according to the capacity approved under PDP VIII. They include: Domestic gas-fired power (14,930 MW) LNG-fired power (22,400 MW) Coal-fired power (30,127 MW) Cogeneration power using residual heat, blast furnace gas, and by-products of technological lines in industrial facilities (2,700 MW) Hydropower (29,346 MW) Pumped storage hydropower (2,400 MW) With respect to each type, the Implementation Plan provides details of projects by location and their operational progress. Such information is set out in Schedule III of the Implementation Plan. For power source projects not included in this list, the provincial People’s Committees will consult with the Ministry of Industry and Trade (“MOIT”) and relevant agencies on compliance with the planning prior to appraisal and issuance of in-principle investment approval. Renewable Energy Projects through 2030 The Implementation Plan allocates the capacity of the following renewable energy sources by locality/region: Offshore wind power (6,000 MW) Onshore wind power (21,880 MW) Hydroelectric power (29,346 MW) Biomass electricity (1,088 MW) Electricity produced from waste (1,182 MW) Rooftop solar power for self-production and self-consumption (2,600 MW) Battery storage (300 MW) With respect to each renewable energy source, the Implementation Plan provides a list of certain renewable energy projects through 2030, including the expected life cycle of the projects, and the allocated capacity
April 29, 2024
On November 4, 2021, Cambodia’s Ministry of Mines and Energy (MME) issued a Prakas No. 0305 on Management of the Steam Energy Subsector within the Energy Sector. The prakas aims to regulate steam energy operations, and requires companies wishing to develop, build, install, or operate steam energy to apply for a steam energy license. As this is the first prakas regulating steam energy operations in Cambodia, all relevant companies operating in steam energy must apply for a steam energy license with the MME. Prakas 0305 discusses permits for three types of activities: Development, Construction, Installation, and Operation of Steam Energy. Companies wishing to develop, build, install, and operate steam energy production facilities must first apply for a permit from the MME. Steam Energy Service Provision. Companies wishing to develop, build, install, and operate steam energy for the purpose of supplying steam energy to consumers must apply for a permit for steam energy service provider in addition to a permit for development, construction, installation, and operation of steam energy. Two-in-One Steam Energy and Electricity Production. Companies wishing to develop and operate both steam energy and electricity production activities must also apply for a permit for two-in-one steam energy and electricity production. Companies operating without the necessary permits are subject to a daily fine of KHR 400,000–4,000,000 (approx. USD 100–1,000). In addition, they may face other penalties, including: An order to halt business activities; Permit suspension; Permit revocation; Judicial action; and Other legal measures as the MME deems fit. For more information on regulations and requirements for steam energy licenses in Cambodia, please contact Tilleke & Gibbins at [email protected].
January 25, 2024
Thailand’s Department of Mineral Fuels (DMF) has developed a framework to regulate carbon capture and storage (CCS) and related activities by introducing “carbon business” to the draft amendment to the Petroleum Act B.E. 2514 (1971). CCS involves the capture, treatment, transport, and underground storage of carbon dioxide produced from industrial power generation. The captured carbon can be used to enhance oil recovery, converted into fuel such as methane or DME (dimethyl ether), or converted to higher-value products. In Thailand, various companies have carried out CCS feasibility studies. Carbon Business and Licensing Under the draft amendment to the Petroleum Act, “carbon business” is defined as exploration for purposes of carbon storage or compression of carbon into carbon storage, while “carbon” is defined as carbon dioxide in the state of gas or supercritical fluid generated as a byproduct or captured from other sources and transported for storage. Any concessionaire, product-sharing contractor, or service contract holder that has been granted permission to explore for or produce petroleum under the Petroleum Act can apply for a carbon business license from the director-general of the DMF with the approval of the Petroleum Committee. Licenses are also available to any other parties who meet the eligibility criteria to be prescribed later by a ministerial regulation. Licenses for these parties will be allocated through competitive bidding according to procedures to be announced by the minister of the Ministry of Energy (MOE). In granting a license, the minister of the MOE and the director-general of the DMF will consider the geological suitability of carbon storage, storage systems, surrounding areas of carbon storage, risk of carbon leakage and movement, environmental impacts, and the applicant’s financial potential and ability in environmental management. Responsibilities of Carbon Business Operators Carbon business operators are required to monitor and inspect their installations, structures,
January 10, 2024
On December 15, 2023, the Electricity Authority of Cambodia (EAC) issued a notification requiring all owners of solar power systems to report their systems to their local electricity supplier by January 31, 2024. Systems that have already been reported under existing regulations are exempt from this requirement. Systems that remain unreported after the deadline will be deemed illegal and subject to penalties, including possible disconnection from the national grid. The rationale for the reporting requirement is that the EAC expects to adopt a new solar power regulation soon. Electricite du Cambodge (the main state-owned utility provider in Cambodia) and EAC-licensed private electricity providers are now gathering data on the current use of solar power systems in order to prepare for, adopt, and execute the upcoming regulation. The reporting requirement is to facilitate this gathering of data. The upcoming regulation, planned for early 2024 according to the notification, follows last year’s Prakas No. 159, which contained the Ministry of Mines and Energy’s guidelines and principles for rooftop solar systems. The EAC now needs to issue implementing regulations that are in line with the ministry’s guidelines and principles. Although stand-alone solar power systems that did not have a connection to the national grid were previously not regulated and did not require any authorizations, the EAC is now stating that all types of solar power systems need to adhere to the reporting requirement under the notification. According to the EAC, the upcoming regulation will address all types of systems, and the December 15 notification clearly announces that all types of solar power systems will need to obtain EAC approval under the upcoming regulation. Solar power system operators in Cambodia should report their systems to their local electricity providers by January 31, 2024, to avoid any penalties, while remaining vigilant for the upcoming