You are using an outdated browser and your browsing experience will not be optimal. Please update to the latest version of Microsoft Edge, Google Chrome or Mozilla Firefox. Install Microsoft Edge

January 27, 2025

Thailand Opens 25th Bidding Round for Oil Exploration and Production

Thailand’s Ministry of Energy (MOE) has announced the launch of the 25th bidding round for petroleum exploration and production. This round offers nine greenfield onshore blocks—seven in northeastern Thailand and two in central Thailand—encompassing over 33,000 km². The bids can be submitted from July 1 to July 16, 2025.

The sizes and locations of these blocks are:

  • Northeast Thailand
    • Block L1/66: 3,223.51 km² (Khon Kaen, Nong Bua Lam Phu, Udon Thani)
    • Block L2/66: 3,917.03 km² (Kalasin, Sakon Nakhon, Udon Thani)
    • Block L3/66: 3,918.22 km² (Kalasin, Khon Kaen, Maha Sarakham, Udon Thani)
    • Block L4/66: 3,656.65 km² (Amnat Charoen, Mukdahan, Nakhon Phanom, Yasothon)
    • Block L5/66: 3,436.01 km² (Chaiyaphum, Khon Kaen, Nakhon Ratchasima)
    • Block L7/66: 3,438.51 km² (Buri Ram, Maha Sarakham, Nakhon Ratchasima, Roi Et, Surin, Khon Kaen)
    • Block L9/66: 3,885.44 km² (Nakhon Ratchasima)
  • Central Thailand
    • Block L6/66: 3,966.86 km² (Chaiyaphum, Lop Buri, Phetchabun)
    • Block L8/66: 3,957.41 km² (Kanchanaburi, Nakhon Pathom, Ratchaburi, Suphan Buri)

Bidding Process

Interested companies must submit their bids to the Department of Mineral Fuels (DMF) between July 1 and July 16, 2025. Bids should include:

  • Application form (ChorThor/Por1)
  • Proof of eligibility: Corporate documentation, audited financial statements, and proof of resources
  • Technical and commercial proposals: Exploration plans, geological surveys, financial and work commitments, and special benefits such as signing bonuses of at least USD 100,000.

There is a nonrefundable THB 50,000 application fee per block, and applicants must provide a bid bond of THB 3 million per block via an unconditional bank guarantee from a commercial bank with branches in Thailand, valid for at least one year from the bidding submission date. The guarantee will be returned to unsuccessful bidders upon request and to successful bidders upon the signing of the concession agreement.

Eligibility

Bidders must meet the following main eligibility criteria:

  1. Bidders must be limited companies with the following qualifications:
    • The company must have the objective of carrying out petroleum exploration and production;
    • The company must never have abandoned their operations under a concession or been subject to revocation of a concession in Thailand; and
    • None of the company’s shareholders, directors, or authorized directors can be listed as having abandoned operations under a concession or having been subject to revocation of a concession in Thailand.
  2. Bidders must command sufficient capital, machinery, equipment, tools, specialists, and other resources necessary for petroleum exploration and production. This includes having:
    • For at least two of the last three years, shareholder equity of at least THB 100 million and a current ratio of at least 1.00; and
    • Proven resources and experience in petroleum exploration and production over the last five years.

If the bidder does not possess all the qualifications outlined in item 2 above, the bidder must have another government-accredited company with a capital or management relationship that meets these qualifications. This company must guarantee that it will provide the bidder with all necessary capital, machinery, equipment, tools, and specialists for petroleum exploration and production.

If a bidder comprises more than one company, each of the companies must possess the qualifications outlined in item 2 above. Foreign companies may apply, provided that all documents are notarized by a foreign notary public or authenticated by the relevant foreign embassy or consulate in Thailand, or by a Thai embassy or consulate abroad.

Evaluation Criteria

Applications from qualified bidders will be evaluated using a points-based system that assesses the following:

  • Petroleum exploration program (80 points), comprising the exploration commitment for the first period (60 points) and the second period (20 points)
  • Special benefits (20 points)

The bidder with the highest scores will be selected as the concessionaire.

Legal and Contractual Framework

Successful bidders will operate under a concession scheme with a 6-year exploration period (extendable by 3 years) and a 20-year production period (extendable by 10 years). However, concession areas may be located on state-owned land, and if the use of this land is not permitted by any applicable law at present or in the future, the concessionaire must accept that it has no right to use the land for operations.

Outlook

The 25th bid round represents a significant opportunity for energy companies to invest in Thailand’s petroleum sector given the expiration of several petroleum blocks in the following years. The new petroleum blocks offered in this bid round are crucial for bolstering Thailand’s domestic petroleum production capabilities. They will play a vital role in reducing dependency on imported oil, stabilizing energy costs, and securing a steady supply of petroleum resources as they will enhance the country’s strategic petroleum reserves to ensure energy security amid global oil price volatility and geopolitical tensions.

For more details on the 25th bidding round, or on any aspect of energy activities in Thailand, please contact Supasit Boonsanong at [email protected], Charuwan Charoonchitsathian at [email protected], Kobchai Nitungkorn at [email protected], or Thananya Pholchaniko at [email protected].

RELATED INSIGHTS​ 

July 18, 2025
Vietnam’s electric vehicle (EV) industry is experiencing rapid growth, driven by a strong wave of new legislation, strategic plans, and government incentives. The government’s clear commitment to electrification is attracting foreign investment, supporting advanced production, and reducing reliance on internal combustion engine (ICE) imports. Recent national strategies, sector regulations, and technical standards demonstrate a rare level of regulatory momentum in Southeast Asia, positioning Vietnam as a competitive player in the global EV supply chain and an attractive market for foreign investors. An overview of legal developments for the EV sector in Vietnam is presented below. National Action Program for Green Transportation A key driver of Vietnam’s EV growth has been the National Action Program for Green Transportation through 2050 stipulated in Decision No. 876/QD-TTg of the prime minister dated July 22, 2022. The National Action Program sets a detailed roadmap for the green energy transition in road transport. For the period 2022–2030, the focus is on promoting the manufacturing, assembly, import, and conversion of road motor vehicles to electric power, expanding the use of 100% E5 gasoline for road vehicles, developing charging infrastructure to meet the needs of residents and businesses, and encouraging both new and existing bus stations and rest stops to meet green criteria. For the period 2031–2050, the roadmap aims to gradually restrict and ultimately cease by 2040 the manufacturing, assembly, and import of fossil fuel-powered cars, motorcycles, and mopeds for domestic use. By 2050, the goal is for 100% of road motor vehicles and construction vehicles participating in traffic to use electricity or green energy, for all bus stations and rest stops to meet green criteria, and for all machinery and equipment for loading and unloading to transition from fossil fuels to electricity or green energy. The program also calls for the completion of nationwide
July 16, 2025
On June 27, 2025, the National Assembly of Vietnam officially passed the amended Law on Atomic Energy, which will take effect on January 1, 2026. This legislative milestone follows the release of the fourth draft in June 2025, which was circulated for public consultation and builds upon earlier drafts from February, April, and early June. (See our previous article on the draft version here), Many provisions have been retained or refined to ensure greater specificity and alignment with Vietnam’s current legal framework. Once in force, the amended law will replace the 2008 Law on Atomic Energy (No. 18/2008/QH12), marking a significant step forward in modernizing Vietnam’s legal infrastructure for nuclear energy. The new law aims to harmonize with international standards, promote the safe and sustainable development of nuclear power, and facilitate future nuclear projects in the country. Noteworthy Updates in the Final Legislation Definition of National Radiation and Nuclear Safety Authority (NRNSA): The law introduces a clear definition of the NRNSA, outlining its roles and responsibilities in line with IAEA standards. Currently, this function is performed by the Vietnam Agency for Radiation and Nuclear Safety (VARANS) under the Ministry of Science and Technology. Digital Transformation Requirements: New provisions mandate the development of an integrated digital platform for data management, administrative procedures, and safety oversight, enhancing transparency and security. Policy Support for Training and Privatization: The law sets out principles for workforce incentives and sector privatization, with detailed regulations to be issued by the government. Dedicated Safety and Security Mechanism: A new section outlines inspection, supervision, violation handling, and enforcement procedures in the field of atomic energy, particularly for nuclear power plants. The NRNSA is empowered to conduct unscheduled inspections, suspend operations, and recommend license revocation when safety risks are identified. Key Provisions Retained or Clarified from the Draft Licensing
July 2, 2025
The second in a three-part series on the recent European blackout and its implications for Thailand, this article assesses the likelihood of a similar event occurring in Thailand, considering the country’s current energy infrastructure and its increasing reliance on renewables.