Effective from January 1, 2017, all contracts to construct residential buildings will be subject to contract control under the Consumer Protection Act B.E. 2522 (1979) and the Royal Decree Prescribing Bases and Procedures in Relation to a Business that is Subject to Contract Control and Description of a Contract B.E. 2542 (1999).

Under a new notice published in the Government Gazette on November 14, 2016 (officially titled the “Notice of the Contract Committee Re: Prescribing the Business of a Residential Building Construction as a Business that is Subject to Contract Control B.E. 2559 (2016)”), any contract between a “business operator of a residential building construction” and a “consumer” for the construction of a residential building must contain all of the following terms and conditions:

  1. Place of contract, date, the purpose of the building usage, design of the building, place of construction, and the details of both parties (e.g., name, address, identification/corporate registration number)
  2. Price (inclusive of value added tax), and an obligation to find materials and equipment in accordance with the standards specified in the contract
  3. Bill for quantity and price of materials
  4. Payment installments
  5. Period for obtaining the construction permit
  6. Period of construction
  7. The business operator’s warranty (five years for a structure and one year for non-structural parts)
  8. The consumer’s right to amend the construction plan and the price for the amended plan
  9. The business operator’s covenant to comply with the construction permit and plan, which has been approved by the government authority and the legal/professional standard
  10. Any default terms and conditions for consumers, which must be shown either in red, bold, or italics, which differ from the normal characters, and the business operator must also give the consumer a rectification period of no less than 30 days, before terminating the contract
  11. The consumer’s right to terminate the contract, or a fine for delaying the construction period
  12. A force majeure  clause

Additionally, none of the following terms and conditions can be included in any provision within the contract:

  1. Waiver or limitation of the business operator’s liability
  2. Waiver of the business operator’s written termination notice, or termination without any fault of the consumer
  3. The business operator’s right to claim for payment before the due date, without the consumer’s default or breach of contract
  4. The business operator’s right to amend the plan, price, or any conditions in the contract, in a manner that would place an additional burden on the consumer, without the written consent of the consumer
  5. Non-refundable payment clause
  6. A requirement to obtain the business operator’s permission or consent prior to the consumer’s inspection of the construction site
  7. The business operator’s assignment of its obligations to others, without the consumer’s consent
  8. A term granting the business operator ownership of any building,  material, or equipment that is procured or paid for by the consumer
  9. The consumer’s deemed acceptance of the work, in the event that the consumer fails to inspect and accept the work within the date prescribed in the contract

According to the Consumer Protection Act, if a business operator fails to deliver a contract containing contract terms in accordance with the above terms and conditions, the business operator will be subject to a fine of not exceeding THB 100,000, or imprisonment for a term not exceeding one year, or both.

If you have any questions about the permissible terms and conditions within residential building construction agreements, please contact Chaiwat Keratisuthisathorn, attorney-at-law in the Tilleke & Gibbins corporate and commercial group, at +66 2056 5507 or [email protected].

RELATED INSIGHTS​ 

November 28, 2025
On November 26, 2025, the government of Vietnam issued Resolution No. 8/2025/NQ-CP to extend and expand the pilot program allowing Vietnamese citizens who meet certain conditions to gamble at three integrated casino resorts in Vietnam: Corona Resorts & Casino Phu Quoc (An Giang Province) – Effective immediately, and continuing an ongoing pilot program that started in 2019. The Grand Casino Ho Tram (Ho Chi Minh City) – New pilot program for five years starting November 26, 2025. Van Don Integrated Casino & Tourism Complex (Quang Ninh Province) – New pilot program for five years from the date the casino receives its license. The pilot program was originally established under Decree No. 03/2017/ND-CP on casino business, which also sets out the specific eligibility conditions for Vietnamese citizens. After the pilot period, these projects must stop allowing Vietnamese players until the government issues further decisions. This expansion of the pilot program comes after Vietnam’s Ministry of Finance (MOF) released a draft decree earlier this year proposing significant changes to the regulatory framework governing casino operations. These revisions, which focus on increasing fiscal contributions from local players and strengthening compliance obligations for casino operators nationwide, are detailed below. Proposed Increase in Casino Entry Fees for Vietnamese Players The draft decree increases the entry fees applicable to Vietnamese citizens permitted to play at casinos. Under the current regulations, Vietnamese players are required to pay an entry fee of VND 1 million (approx. USD 38) for 24 consecutive hours or VND 25 million (approx. USD 950) per month. The draft decree proposes increasing these fees to VND 2.5 million (approx. USD 95) for 24 consecutive hours and VND 50 million (approx. USD 1,900) per month, effectively doubling the existing amounts and marking the first major fee revision since the pilot program allowing Vietnamese players
November 21, 2025
On November 17, 2025, Thailand’s Ministry of Interior introduced significant regulatory changes to make rooftop solar adoption easier and more cost-effective for property owners. Ministerial Regulation No. 72 B.E. 2568 (2025), issued under the Building Control Act B.E. 2522 (1979), was published in the Government Gazette on November 19, 2025, with immediate effect. Background Under the Building Control Act (BCA), any alteration made to a building requires either notification of the relevant authority or application for a building alteration permit—unless the alteration falls under a separate list of exceptions specified in the ministerial regulations issued under the BCA. In 2015, installation of solar rooftops on any residential building under 160 square meters was added to this list of exceptions, subject to inspection and notification requirements. The newly enacted regulation now eliminates many of these requirements and introduces a broader and more permissive framework to promote solar adoption nationwide. Key Changes Specifically, the regulation introduces three major changes: Expanded exemption from the definition of “building alteration”: The installation of solar panels on any building roof—regardless of the type of building or the total area of the installation—is no longer considered a building alteration under the BCA, provided that the total weight of the installation does not exceed 20 kg/m2. Removal of structural integrity certification requirement: The new regulation eliminates the obligation to obtain a structural stability certificate from a licensed civil engineer. Removal of notification requirement: Property owners or possessors are no longer required to notify the local authority before installation of a solar rooftop. Impact This significant streamlining of requirements for solar rooftop installation is expected to accelerate the adoption of renewable energy in the country, particularly for residential and commercial properties—similar to the way Thailand’s December 2024 removal of licensing requirements for factory solar rooftop installations encouraged such
November 14, 2025
Interest in data center land acquisition has increased significantly over the past year, with a notable rise in inquiries from investors seeking to establish digital infrastructure in Thailand. Although the sector is still in its early stages, this emerging wave of development represents a significant shift in Thailand’s technology infrastructure landscape, driven primarily by multinational technology companies and operators looking to expand their regional presence. Project Development The data center sector in Thailand is attracting a diverse range of international investors, though with clear geographic patterns. Most investors are from China, Singapore, and Japan, with some additional interest from countries outside Asia, including the United States and Europe. This investor base consists primarily of multinational tech companies and operators seeking to establish new facilities rather than acquire existing assets. Data center business activities are also a sector promoted by Thailand’s Board of Investment (BOI), which offers investors both tax and nontax privileges as well as exemptions to foreign investment and land-ownership restrictions. Projects currently underway are still largely in the land acquisition and construction phase. Unlike more mature markets where many facilities are operational and generating revenue, the predominant focus in Thailand remains on securing suitable land and beginning the building process. This means that while interest is high and land assembly is accelerating, the sector as a whole has not yet reached the operational phase that will ultimately drive licensing applications and full regulatory compliance. The licensing process itself remains at an early stage, as most projects must first complete their facilities before applying for the specific licenses required from the telecommunications authority. Once the facilities are built, the next critical step will be obtaining these telecommunications licenses, which are mandatory for data center operations. Legal and Regulatory Considerations The complexity of data center development in Thailand requires
November 13, 2025
The Land Department in Thailand’s Ministry of the Interior (MOI) plays a central role in ensuring the stability and legality of real estate transactions in the country. Its core responsibilities include issuing land title deeds, registering transactions (e.g., sales, mortgages, leases), conducting surveys for subdivision or consolidation of land, and providing information and guidance on land and property development laws. These administrative functions secure investor confidence and support transparency in the Thai property market, so any delay can have a significant impact. This is especially true for investors who depend on timely registration to secure or transfer property rights. Delays can create liquidity risks, postpone project timelines, and even reduce Thailand’s attractiveness as a real estate investment destination. This article explores the nature of these challenges, the legal framework governing the timelines for administrative actions, and remedies available under Thai law. Sources of Delay Procedural delays at land offices can arise for a variety of structural and operational reasons. These include approval processes that require several levels of internal review, heavy staff workloads, and occasional communication gaps within the bureaucratic chain. Many processes still rely upon manual documentation, which can prolong administrative steps and increase the likelihood of bottlenecks. Some delays stem from ongoing investigations into the legality of land titles. For example, a land title deed may have an annotation indicating that the title deed is under investigation to verify its legality. Even though this annotation does not legally prohibit the sale or transfer of the land, in practice, most prospective purchasers are reluctant to proceed with a transaction until the annotation is removed. As a result, the land can become effectively illiquid during the investigation period, leading to significant investment delays. While such investigations are essential to maintaining the integrity of Thailand’s land registration system, prolonged inquiries