On June 17, 2017, the Petroleum Act (No. 7) B.E. 2560 and the Petroleum Income Tax Act (No. 7) B.E. 2560 were both enacted, amending their predecessor laws. The amendments to both statutes entered into force on June 23, 2017. The amendments had been anticipated for some time, introducing production sharing agreements (PSAs) and service contracts as alternative host government instruments by which upstream oil and gas producers may invest in Thailand.

Traditionally, the concession has been the sole means by which oil and gas could be explored for or produced in Thailand. Acting similarly to a license, the Thai concession stipulates that petroleum is the property of the state, though ownership transfers to the concessionaire at the wellhead. The amendments to the Petroleum Act do not eliminate the potential use of concessions, but rather provide two new instruments for the Ministry of Energy (MOE) to utilize when contracting with petroleum producers.

Production Sharing Agreements

The MOE will now be permitted to define appropriate blocks to be explored and produced by way of a PSA. Sections 53/1 through 53/8 of the Petroleum Act now outline a number of basic principles relating to PSAs and clauses to be found in the PSA itself, including the following:

  • Minimum amounts of capital to be injected by the private oil and gas producer;
  • Allocation of ownership interests in produced petroleum between the private oil and gas producer and the Thai state, including provision for the private oil and gas producer to dispose of petroleum on behalf of the state;
  • Duty of the private oil and gas producer to submit a plan and budget for approval to the Petroleum Committee before starting the project; and
  • Clauses pertaining to management of operations, penalties in the event of noncompliance, and termination of the PSA.

Unlike concessions, under the PSA the Thai state will retain ownership over a portion of the petroleum after it has been produced.

Service Contracts

Similar to PSAs, the MOE will now be permitted to determine appropriate blocks to be exploited via a service contract. Unlike the PSA or the concession, where the private oil and gas producer obtains ownership in some or all of the produced petroleum, produced petroleum under the service contract belongs exclusively to the Thai state. Sections 53/9 through 53/18 of the Petroleum Act outline a number of key aspects of the service contracts to be used in Thailand, including:

  • Greater government control over exploration and production decision-making; and
  • A maximum duration of three years for any service contract.

Amendments to Petroleum Income Tax Act

The amended Petroleum Income Tax Act accommodates the addition of PSAs to the Petroleum Act and makes other revisions to the taxation regime for upstream producers. Production sharing producers will be taxed at the rate of 20 percent of net profits, subject to other provisions of the Petroleum Income Tax Act. Amendments to the general taxation regime for upstream producers include the ability to deduct certain parent company expenditures on the Thai subsidiary’s behalf, as to be prescribed in further detail in forthcoming Ministerial Regulations.

Conclusions and Looking Forward

The MOE has been granted the authority to prescribe detailed rules relating to PSAs and service contracts by adopting Ministerial Regulations pursuant to Sections 53/1 and 53/9 of the Petroleum Act. As the MOE and its Department of Mineral Fuels determine appropriate blocks where either arrangement would be suitable, we can anticipate form agreements to be prescribed and utilized in practice.

RELATED INSIGHTS​ 

August 12, 2024
With the growing prominence of ESG (Environmental, Social, and Governance) factors, businesses in Vietnam are increasingly recognizing their importance in driving global demand, societal impact, and economic value. A comprehensive acknowledgment of ESG-related legal requirements is critical for investors and companies operating in Vietnam to meet stakeholder expectations and ensure compliance. Our guide provides a basic overview of the rapidly evolving ESG landscape in Vietnam, covering a range of key issues for companies doing business in the country: What is ESG, and what does the ESG legal framework look like in Vietnam? Who needs to follow ESG regulations in Vietnam? What are the benefits of ESG compliance? How can enterprises enhance ESG best practices in Vietnam? Please click on the link below to view the full article.
June 6, 2024
On January 18, 2024, Vietnam’s National Assembly passed a new Land Law (“Land Law 2024”) that is scheduled to take effect on January 1, 2025, replacing the current Land Law 2013. To mitigate challenges faced by the real estate market, in late May 2024, the government proposed amendments to the Land Law that would move the effective date up five months, to August 1, 2024, pending approval by the National Assembly. One of the key sectors to be impacted by the Land Law 2024 is the energy sector, which requires large land areas for power plants and infrastructure, especially given Vietnam’s 2050 net zero emissions commitment. Below are highlights of how the new Land Law 2024 will affect Vietnam’s energy sector. Annual payment of land rental Under the Land Law 2013, investors implementing energy projects (e.g., solar power projects) are entitled to choose to lease land with either (i) an annual rental payment or (ii) a single upfront payment for the entire term of use. Under the Land Law 2024, these investors are only allowed to use land in the form of an annual rental payment. As the annual land rental is calculated in five-year cycles, based on the land price table decided by the state, this new restriction means that investors in energy projects will face an additional risk of a sudden increase in land rental, disrupting their financial planning. Investors using land sites leased with annual rental payments are also not allowed to mortgage their land-use rights, but can only mortgage assets attached to the land, at credit institutions licensed to operate in Vietnam. Accordingly, this may affect the ability of energy projects to obtain financing during the development stage, because they no longer have assets that can be mortgaged. Obtaining land Under the Land Law 2024,
June 4, 2024
Thailand’s Department of Mineral Fuels (DMF) is in the process of preparing a notification that will open the application period for onshore petroleum exploration and production rights in the country’s 25th bidding round. The 25th round of bidding will cover nine petroleum blocks, including the northeastern areas (blocks L1/66, L2/66, L3/66, L4/66, L5/66, L7/66, and L9/66) and central areas (blocks L6/66 and L8/66). The DMF estimates that application submissions will commence around the middle of 2024, and the successful bidder will be announced at the end of the same year. Based on previous rounds of bidding, applicants must meet the following key criteria: The applicant is a company with the purpose of carrying out petroleum exploration and production; The applicant commands the necessary assets, machinery, equipment, tools, and specialists to explore for, produce, sell, and dispose of petroleum; The applicant has not abandoned its operations under a concession or been subject to revocation of a concession in Thailand; and None of its personnel, shareholders, directors, or authorized directors is listed as a person who has abandoned its operations under a concession, or has been subject to revocation of a concession in Thailand. If the applicant does not itself possess all the qualifications under (2) above, it must have another government-approved company that possesses all the qualifications under (2) and has a capital or management relationship with the applicant, and the applicant must supply guarantees that the company will make available to the applicant all necessary assets, machinery, equipment, tools, and specialists for the applicant to explore for, produce, sell, and dispose of petroleum. Companies with a vested interest in petroleum exploration and production in Thailand must remain vigilant for updates. The DMF is expected to provide an update and more details on the bidding very soon. For more details
June 4, 2024
As Vietnam continues its rapid economic development, the demand for sustainable and reliable energy sources has never been more critical. Solar power has emerged as a key component of Vietnam’s strategy to diversify its energy portfolio and reduce its carbon footprint. Recent developments of the regulatory framework governing solar power projects in Vietnam, as discussed below, highlight the country’s commitment to renewable energy and its efforts to create a conducive environment for solar power investments. Objectives for the Development of Solar Power Projects On May 15, 2023, the Prime Minister issued Decision No. 500/QD-TTg, approving the National Power Development Plan for 2021-2030 with a vision to 2050 (“PDP VIII”). Following this, on April 1, 2024, the Prime Minister promulgated the Implementation Plan for PDP VIII (“Implementation Plan”). These documents underscore Vietnam’s commitment to promoting renewable energy, particularly solar. They emphasize self-production and self-consumption of solar power, the development of rooftop solar systems, and the promulgation of the direct power purchase mechanism. The integration of solar power with battery storage is also encouraged, contingent upon economic viability. PDP VIII sets ambitious capacity targets for solar power. By 2030, the capacity is projected to reach approximately 12,836 MW, accounting for 8.5% of the total power capacity. This includes 10,236 MW from concentrated solar power and 2,600 MW from self-production and self-consumption solar power. By 2050, the capacity is expected to rise to between 168,594 MW and 189,294 MW, representing 33.0-34.4% of the total power capacity. Additionally, PDP VIII and the Implementation Plan list 27 solar power projects, totaling 4,136.25 MW, slated for implementation after 2030. However, these projects may be advanced under self-production and self-consumption arrangements. Draft Decree on Direct Power Purchase Agreements On April 15, 2024, the Ministry of Industry and Trade (“MOIT”) released a draft decree on direct power