Seven Things to Look for in Your Private Power Purchase Agreement

Bangkok Post, Corporate Counsellor Column

As the costs of solar photovoltaic (PV) panels decrease, new business opportunities are emerging. In addition to the traditional model of independent power producers establishing large-scale power generating facilities to sell electricity directly to public utilities, a new dynamic model of direct electricity selling is beginning to take shape.

Solar PV panels can be installed on roofs to supply electricity directly to the building’s occupants, bypassing the need for a local electricity utility. Under a contract between private parties, the customer and power producer are able to negotiate directly on the cost of the electricity to be supplied. The resulting increase in competition has the potential to reduce energy costs across the market.

Typically, the electricity seller will remain the owner of the PV panels, the inverter, and other components of the generating system. As the seller will be financing the installation of the system, this will allow the purchaser to sign up with minimal initial costs.

The principal contractual document governing the relationship between the seller and purchaser is the power purchase agreement (PPA). PPAs are traditionally executed between independent power producers and the local electricity utility, which in Thailand has been the Provincial Electricity Authority (PEA), the Metropolitan Electricity Authority (MEA), or the Electricity Generating Authority of Thailand (EGAT).

The form PPAs from the MEA, PEA, and EGAT generally do not allow for much negotiation on the part of the independent power producers. But with rooftop solar installations, both the seller and the purchaser of the electricity being generated are private parties, meaning there is greater room for flexibility.

Here are seven issues that both parties should be aware of from the outset:

1. Ownership of the facilities: Ideally, the purchaser will be the owner of both the building and the land. However, if the purchaser is leasing the property, it is important to ensure that installation of the system will not violate the lease agreement, or will not result in the system becoming attached to the building as a permanent fixture. If the building and/or land are being leased, the term of the lease should also be confirmed in order to ensure that installation of the system will be economical for the seller.

2. Minimum purchase requirements: The purchaser should ideally be required to purchase a minimum amount of electricity each month, failing which, it will still be required to compensate the seller. This “take or pay” model is optimal for ensuring financial predictability on the part of the seller and its financiers. The purchaser should take care to ensure that its minimum commitments are not excessive and can easily be managed in light of anticipated future use.

3. Clear lines between Force Majeure and Events of Default: A key issue to consider in the PPA is how to address changes to the environment which are beyond the control of the purchaser. If the purchaser’s neighbor to the south erects a tall building, trees, or other obstructions, the solar PV system may be rendered effectively worthless. It will be important to ensure that the PPA clearly outlines whether the purchaser is entitled to terminate the agreement in such circumstances.

4. Ownership of the system: Since the seller will retain ownership of the system, it will want to affix conspicuous markings on all equipment to ensure that its ownership interests are clear. The PPA should contain a clause which requires the purchaser to assist the seller in the event the seller wishes to register its ownership interests at any relevant government agencies. Furthermore, the PPA should contain covenants on the part of the purchaser that it will take no actions which will result in the system being deemed a fixture.

5. Mortgages and encumbrances: The seller must be aware if the land and/or building on which the panels will be placed has been mortgaged. Additionally, the PPA may contain a negative covenant on the part of the purchaser not to mortgage the building, or an undertaking to notify the seller in the event it mortgages the building. The seller’s lenders may consider securing their loans to the seller by taking the solar PV system as collateral.

6. Regulatory environment: As this is a new area of business, the regulatory framework is still in the process of being devised. The purchaser and seller must stay apprised of new rules and regulations promulgated by the Energy Regulatory Commission, and the PPA must envision how new rules affecting the transaction will be addressed.

7. Payment terms: Delayed payment by the purchaser should ideally result in automatic interest payments being levied. It will not be in the seller’s best interests to terminate the agreement immediately in the event of non-payment; however, the purchaser must have a clear disincentive to delay on making its regular payments.

Private PPAs for solar PV systems are still in their infancy in Thailand, and best practices will continue to develop. It is important that both purchasers and sellers of electricity are aware of the legal risks involved when negotiating PPAs and have taken all appropriate steps to maximize their bargaining position.

RELATED INSIGHTS​ 

June 3, 2024
Nearly a year after Vietnam’s issuance of its National Power Development Plan for 2021-2030, with a vision to 2050 (“PDP VIII”), the Prime Minister issued Decision No. 262/QD-TTg dated April 1, 2024, approving the Implementation Plan for PDP VIII (“Implementation Plan”). Among other contents, the Implementation Plan sets forth the list of prioritized power source projects through 2030, and the capacity of renewable energy sources through 2030, as detailed below. Prioritized Power Source Projects through 2030 The Implementation Plan lists out six types of power source projects prioritized for development through 2023 according to the capacity approved under PDP VIII. They include: Domestic gas-fired power (14,930 MW) LNG-fired power (22,400 MW) Coal-fired power (30,127 MW) Cogeneration power using residual heat, blast furnace gas, and by-products of technological lines in industrial facilities (2,700 MW) Hydropower (29,346 MW) Pumped storage hydropower (2,400 MW) With respect to each type, the Implementation Plan provides details of projects by location and their operational progress. Such information is set out in Schedule III of the Implementation Plan. For power source projects not included in this list, the provincial People’s Committees will consult with the Ministry of Industry and Trade (“MOIT”) and relevant agencies on compliance with the planning prior to appraisal and issuance of in-principle investment approval. Renewable Energy Projects through 2030 The Implementation Plan allocates the capacity of the following renewable energy sources by locality/region: Offshore wind power (6,000 MW) Onshore wind power (21,880 MW) Hydroelectric power (29,346 MW) Biomass electricity (1,088 MW) Electricity produced from waste (1,182 MW) Rooftop solar power for self-production and self-consumption (2,600 MW) Battery storage (300 MW) With respect to each renewable energy source, the Implementation Plan provides a list of certain renewable energy projects through 2030, including the expected life cycle of the projects, and the allocated capacity
April 29, 2024
On November 4, 2021, Cambodia’s Ministry of Mines and Energy (MME) issued a Prakas No. 0305 on Management of the Steam Energy Subsector within the Energy Sector. The prakas aims to regulate steam energy operations, and requires companies wishing to develop, build, install, or operate steam energy to apply for a steam energy license. As this is the first prakas regulating steam energy operations in Cambodia, all relevant companies operating in steam energy must apply for a steam energy license with the MME. Prakas 0305 discusses permits for three types of activities: Development, Construction, Installation, and Operation of Steam Energy. Companies wishing to develop, build, install, and operate steam energy production facilities must first apply for a permit from the MME. Steam Energy Service Provision. Companies wishing to develop, build, install, and operate steam energy for the purpose of supplying steam energy to consumers must apply for a permit for steam energy service provider in addition to a permit for development, construction, installation, and operation of steam energy. Two-in-One Steam Energy and Electricity Production. Companies wishing to develop and operate both steam energy and electricity production activities must also apply for a permit for two-in-one steam energy and electricity production. Companies operating without the necessary permits are subject to a daily fine of KHR 400,000–4,000,000 (approx. USD 100–1,000). In addition, they may face other penalties, including: An order to halt business activities; Permit suspension; Permit revocation; Judicial action; and Other legal measures as the MME deems fit. For more information on regulations and requirements for steam energy licenses in Cambodia, please contact Tilleke & Gibbins at [email protected].
January 25, 2024
Thailand’s Department of Mineral Fuels (DMF) has developed a framework to regulate carbon capture and storage (CCS) and related activities by introducing “carbon business” to the draft amendment to the Petroleum Act B.E. 2514 (1971). CCS involves the capture, treatment, transport, and underground storage of carbon dioxide produced from industrial power generation. The captured carbon can be used to enhance oil recovery, converted into fuel such as methane or DME (dimethyl ether), or converted to higher-value products. In Thailand, various companies have carried out CCS feasibility studies. Carbon Business and Licensing Under the draft amendment to the Petroleum Act, “carbon business” is defined as exploration for purposes of carbon storage or compression of carbon into carbon storage, while “carbon” is defined as carbon dioxide in the state of gas or supercritical fluid generated as a byproduct or captured from other sources and transported for storage. Any concessionaire, product-sharing contractor, or service contract holder that has been granted permission to explore for or produce petroleum under the Petroleum Act can apply for a carbon business license from the director-general of the DMF with the approval of the Petroleum Committee. Licenses are also available to any other parties who meet the eligibility criteria to be prescribed later by a ministerial regulation. Licenses for these parties will be allocated through competitive bidding according to procedures to be announced by the minister of the Ministry of Energy (MOE). In granting a license, the minister of the MOE and the director-general of the DMF will consider the geological suitability of carbon storage, storage systems, surrounding areas of carbon storage, risk of carbon leakage and movement, environmental impacts, and the applicant’s financial potential and ability in environmental management. Responsibilities of Carbon Business Operators Carbon business operators are required to monitor and inspect their installations, structures,
January 10, 2024
On December 15, 2023, the Electricity Authority of Cambodia (EAC) issued a notification requiring all owners of solar power systems to report their systems to their local electricity supplier by January 31, 2024. Systems that have already been reported under existing regulations are exempt from this requirement. Systems that remain unreported after the deadline will be deemed illegal and subject to penalties, including possible disconnection from the national grid. The rationale for the reporting requirement is that the EAC expects to adopt a new solar power regulation soon. Electricite du Cambodge (the main state-owned utility provider in Cambodia) and EAC-licensed private electricity providers are now gathering data on the current use of solar power systems in order to prepare for, adopt, and execute the upcoming regulation. The reporting requirement is to facilitate this gathering of data. The upcoming regulation, planned for early 2024 according to the notification, follows last year’s Prakas No. 159, which contained the Ministry of Mines and Energy’s guidelines and principles for rooftop solar systems. The EAC now needs to issue implementing regulations that are in line with the ministry’s guidelines and principles. Although stand-alone solar power systems that did not have a connection to the national grid were previously not regulated and did not require any authorizations, the EAC is now stating that all types of solar power systems need to adhere to the reporting requirement under the notification. According to the EAC, the upcoming regulation will address all types of systems, and the December 15 notification clearly announces that all types of solar power systems will need to obtain EAC approval under the upcoming regulation. Solar power system operators in Cambodia should report their systems to their local electricity providers by January 31, 2024, to avoid any penalties, while remaining vigilant for the upcoming