Renewables in CLMVT and the Potential for Wind Power

Informed Counsel

With interest in renewable and sustainable energy sources rapidly increasing worldwide, the nations of the Mekong region are beginning to incorporate innovative power generation options into their electrical grids and, more significantly, into their growth plans for the future. As a result, wind energy, formerly one of the least-utilized options in the hydro and solar dominated region, is beginning to see a considerable uptick in interest from investors and governments in the region alike. In this article, we take a country-by-country look at the renewable energy frameworks in the Mekong region, and dive into the potential for wind power in Cambodia, Laos, Myanmar, Vietnam, and Thailand.

Cambodia

Cambodia has shifted from a heavy dependence on fossil fuels to a greater reliance on renewable sources, with only 37% of the country’s power now derived from fossil fuels. Approximately 33% of Cambodia’s total energy produced is sourced from hydropower, 26% from imports, and the remaining 2% sourced from other renewable energies (predominantly solar). At present, there are no major large-scale wind farms in Cambodia, although they are known to be viable and there is potential for development in future.

Government target for renewables in Cambodia

Instead of hard and specific targets for renewable energy, Cambodia has set general objectives for energy sector development as a whole. These objectives include providing an adequate supply of energy to the country, encouraging environmentally and socially acceptable energy resources, and encouraging efficient use of energy.

To meet these goals, the country is committed to importing low-cost power from neighboring countries, attracting private investment in large-scale energy projects (both fossil fuel and renewable), and commercializing the state electricity power supplier, Electricité du Cambodge (EdC).    

The key objectives of the Renewable Energy Policy, released in 2006, are to ensure all rural villages have access to electricity by 2020 and to ensure 70% of households have access to the country’s electricity grid by 2030. The Rural Electrification Fund, formed in tandem with the World Bank in 2005 to facilitate access to electricity for rural households, has helped fund the distribution of solar power units to rural homes not yet on the grid.    

The 2018 draft Environment and Natural Resource Code, developed by the Ministry of Environment, also outlines general energy sustainability objectives, including the eventual adoption of clear sustainable energy targets.

Potential for wind power projects

Though Cambodia’s wind energy potential remains largely unexplored, EdC announced its interest in developing a wind farm project after feasibility studies revealed wind power potential in Mondulkiri and Kampot provinces. They intended to partner with a French energy firm to build 10 wind turbines (amounting to 80 MW of wind power) atop the country’s Bokor Mountain. A deal was scheduled to be struck by June 2020, but news reports suggest that the EdC and the developer remain in negotiations for the power purchase agreement.

Though there are no significant wind projects currently operating in Cambodia, the government has stated in the past that wind energy has potential in the country, noting in a 2011 report by the Ministry of Industry, Mines, and Energy that wind speeds at ground level in Cambodia reached an average of five meters per second—just meeting the threshold for economic viability of standard wind turbines.

Regulatory framework

In Cambodia, the main energy players are EdC, which is owned jointly by the Ministry of Mines and Energy and the Ministry of Economy and Finance), and the Electricity Authority of Cambodia (EAC), the sector regulator responsible for granting licenses and setting electricity rates.

While there are no regulations specifically targeting wind power in the country, some current regulations—especially those already tested in the solar sector—are expected to apply equally to the wind energy sector.

Under Cambodia’s Electricity Law, power may not be generated for sale without a license. All generated power for sale under such a license must typically be sold to EdC and distributed through the EdC network. Generation of power for one’s own consumption must be done completely off-grid.

Another potential regulatory limitation imposed on wind energy is Cambodia’s legal provisions against nuisance, outlined in the Civil Code. As wind turbines cause noise pollution, there may be grounds for suits against wind farms that are seen as a nuisance to neighbors. While no such case has been filed in Cambodia, similar arguments have been made against wind energy projects in other jurisdictions.

Laos

Laos has significant potential for renewable energy, although the government has primarily focused on hydropower to help realize their vision of making Laos the “battery of Southeast Asia,” along with biomass energy, which was a significant topic of focus in the 2011 Renewable Energy Development Strategy in Lao PDR.

Solar and wind energy are considered to have less slightly less potential in Laos than other ASEAN members due partly to the country’s geography. However, the country’s sun-filled dry season has encouraged the public and private sectors to explore solar energy over hydropower energy, and there is an even stronger push for growth in wind energy to take advantage of the country’s mountainous highlands.

Government target for renewables in Lao

The 2011 renewable energy strategy aims for 30% of energy consumption to be sourced from renewables (excluding large hydropower plants) by 2025. During the 2020–2030 period, the country is also expected to be a significant exporter of renewable energy—mainly to Thailand, Cambodia, and Vietnam, with smaller amounts to Myanmar and Malaysia. Singapore has also expressed interest in buying energy from Laos.

The Ministry of Energy and Mines’ official development plan and vision targets hydropower plants producing 10,000 MW by 2020, 12,000 MW by 2025, and 20,000 MW by 2030, with the aim of high regional exports. To counteract the loss of production during the dry season, the solar power targets are for 100 MW by 2020, 300 MW by 2025, and 600 MW by 2030, while the wind power targets are substantially higher, at 250 MW by 2020, 600 MW by 2025, and 1,500 MW by 2030.

Potential for wind power projects

Detailed assessments have yet to be conducted, but the Asian Development Bank has noted estimates for potential wind power production of 3,000–3,500 MW in Laos. Laos’ 2011 renewable energy strategy states that the country’s central provinces—particularly the high mountainous areas along the Lao-Vietnam border in Khammouane and Savannakhet provinces—may be well suited for wind energy production.

For this reason, private companies have started to invest heavily in wind power projects in Laos. The biggest, which has attracted investment of USD 840 million, is scheduled to be operational by 2023, with a capacity of 600 megawatts.

Regulatory framework

In the absence of a framework for public-private partnership, the local authorities have devised a concessionary model whereby local authorities grant land for a project. Although not required by law, it is common for the government to hold some equity. Important concession projects are based on build-operate-transfer and build-own-operate-transfer schemes. As the current concessionary framework—which has proven effective for hydropower projects—does not specifically address wind projects, a regulation concerning wind projects is being drafted.

The Law on Investment Promotion No. 14/NA, dated November 17, 2016, is the main regulation for energy field investment in Laos, and it includes a list of investment incentives that vary based on the zone where the investment is made—for instance, investment in remote areas with relatively undeveloped infrastructure may be granted more incentives. There are also special economic zones, which have their own incentive frameworks.

Myanmar

With the lowest electrification rates in the region—50% as of December 2019—Myanmar’s renewables landscape is indelibly tied to its goal for complete electrification, which is set to be complete by 2030. The Myanmar Energy Master Plan of 2016 looks to build and strengthen the renewables sector while pursuing that goal, making projections for Myanmar’s long-term energy demand, and corresponding potential for renewable energy production, up to 2035.

Government target for renewables in Myanmar

Myanmar had a total primary energy supply of 23 million tons of oil equivalent in 2018. To promote renewable energy and support nationwide electrification, the National Renewable Energy Committee, (consisting of nine ministries, one regional council, two city development committees, and five organizations) was formed on February 6, 2019, to implement renewable energy projects in Myanmar. At present, there are a number of proposed renewable energy projects under consideration of the Ministry of Electricity and Energy (MOEE), including 61 solar power projects in eight regions and states with a total capacity of 5,746.37 MW, seven wind power projects in four regions with a total capacity of 1,163 MW, and six biomass projects for 200 MW in four regions and states.

Potential for wind power projects

It is anticipated that the theoretical generation potential of wind power could be in the order of 365.1 terawatt-hours  per year, and wind power projects can potentially be developed in Chin, Kayah, Kayin, Mon, Rakhine, and Shan States, as well as Ayeyerawady, Tanintharyi, and Yangon Regions. As of November 2018, there were ongoing wind energy feasibility studies in three regions and six states.

The MOEE has conducted feasibility studies in Tanintharyi Region and Mon, Kayah, Kayin, and Shan States in cooperation with Thailand-based company Gunkul Engineering Public Co., Ltd., and in Rakhine State and Ayeyawady and Yangon Regions with Singapore-based Asia Ecoenergy Development and a locally owned company, Primus Advanced Technologies Ltd.

In addition, feasibility studies were conducted in Chin and Rakhine States and Ayeyawady Region with China Three Gorges Corporation.

Regulatory framework

Despite attempts to promote this sector, Myanmar still lacks regulations on renewable energy. The Electricity Law (Pyidaungsu Hluttaw Law No. 44), which was enacted in 2014, governs overall principles of electricity operations in Myanmar and does not provide any specific provisions on renewable energy. In Myanmar, the operation of medium and small power projects with a capacity of less than 30 MW requires permission from state and regional governments, while large-scale power projects require approval from the MOEE and the Myanmar Investment Commission.

However, in a recent interview, a chief engineer from the Department of Renewable Energy and Hydropower Plants under the MOEE reported that Myanmar is currently drafting a renewable energy law to develop the renewable energy sector.

Thailand
Government target for renewables in Thailand

On March 19, 2020, the National Energy Policy Council approved a number of revisions and draft plans regarding power production, development, and efficiency goals for Thailand. The draft plans will next go before the cabinet for further consideration before they are implemented.

One of these is the revised 2018 power development plan for 2018 to 2037 (PDP2018 Rev. 1), which maintains its target for power production capacity of 77,211 MW in 2037, of which 21% of the country’s power production is expected to come from renewable energy. The other sources include natural gas (53%), coal and lignite (11%), and hydropower (9%), plus a 6% savings from energy conservation. Notably, the PDP2018 Rev. 1 also accelerates the planned purchase  of power from wind energy to 2022 from the previous schedule of 2034.

Potential for wind power projects

The Energy Regulatory Commission (ERC) regularly releases data on the status of wind power projects in Thailand. As of July 2020, a total of 32 wind power projects have begun commercial operations, with a total selling capacity of about 1,460 MW. Of these, 22 “small power producers” (SPPs; referring to a 10–90 MW generation capacity) have signed wind Power Purchase Agreements (PPAs) with the Electricity Generation Authority of Thailand, with a total selling capacity of 1,421 MW. Eight “very small power producers” (VSPPs) have signed wind PPAs with the Provincial Electricity Authority (PEA) or Metropolitan Electricity Authority (MEA), with a total selling capacity of 36.86 MW; two wind farm projects developed and operated by the Department of Alternative Energy Development and Efficiency have a total selling capacity of 1.75 MW; and two VSPPs have signed PPAs with the PEA, with a total selling capacity of 16 MW.

Investors can secure a wind PPA in one of two ways—by acquiring shares in a company that is a party to a wind PPA; or by a PPA novation, which means accepting rights and assuming obligations from an existing party to the PPA. Under the share acquisition scenario, acquiring 100% of the shares in an existing party to a wind PPA is normally possible, though sometimes the ERC restricts or limits such transfers within a certain period after the signing of the PPA. A PPA novation, on the other hand, requires written consent from the relevant government offtaker. There is also a specific requirement regarding assignment of PPAs, as stipulated in the relevant ERC regulations and notifications.

Regulatory framework

The three government “offtakers” (that is, purchasers of electricity from power plants) in Thailand are the Electricity Generating Authority of Thailand, the MEA, and the PEA. Power producers are not entitled to sell electricity generated by their plants to the government offtakers unless the two parties have entered into a PPA that follows the form and substance prescribed by the respective government offtaker and the ERC.

Each government offtaker will solicit applications for new PPAs from time to time, based on government policies and current demand. While there are currently no outstanding solicitations for new wind PPA applications, as noted above, it seems likely that the ERC will announce new solicitations of wind PPA applications in the near future.   

Vietnam

Wind energy accounts for a very small share of Vietnam’s total electricity output. Nevertheless, the government of Vietnam has set specific targets to promote it, and has issued a number of regulations aimed at clarifying the legal framework and incentives for the development of wind projects, including a competitive feed-in tariff (FIT).

Government target for renewables in Vietnam

The country’s Power Development Plan VII, covering the 2011–2020 period and looking ahead to 2030, includes plans to prioritize renewable sources for electricity production. For wind energy, the government targeted a total installed capacity of 800 MW by 2020 and 6000 MW by 2030, accounting for a 0.8% share of produced electricity in 2020, 1% in 2025, and 2.1% in 2030. The next power development plan, which is currently being developed, will cover 2021–2030, looking ahead toward 2045.

Potential for wind power projects

Vietnam’s potential for wind power projects is substantial, with natural conditions suitable for wind power, particularly in the south and south-central regions. In addition, the country’s long coastline, much of which has a relatively shallow seabed, is conducive to offshore wind installations. However, despite promising resources, the renewable energy market is still very limited, with few wind power projects in operation. The government hopes to change this situation with a legal framework encouraging and supporting the development of wind power projects in Vietnam.

Key regulatory framework

Under the laws of Vietnam, a wind power project can only be developed if it has been included in the master power plan. Under the new Law on Planning, which governs planning from January 1, 2019, there is to be a national power plan and provincial master plans (mandatory for all provinces) with sections on power in line with the national power plan—all of which are subject to the final approval of the prime minister. The national power plan is developed by the Ministry of Industry and Trade, while the provincial plans are developed by each province and appraised by the Ministry of Planning and Investment.

Currently, Vietnam Electricity (EVN) and its subsidiaries have a monopoly over the transmission and distribution of electricity in Vietnam, and act as the only wholesale purchasers of electricity from generators. Investors are required to sign power purchase agreements (PPAs) with EVN to sell electricity. From November 1, 2018, the FIT for utility wind power projects is USD .098 per kWh for offshore projects and USD .085 per kWh for onshore projects. For new wind power plants (or the relevant parts of them) that achieve a commercial operation date (COD) before November 1, 2021, these FIT rates will stand for 20 years from the COD. For existing wind power plants that were generating power before September 10, 2018, the FIT rates will stand for the remaining term of the PPA.

The development of a wind power project follows a four stage process. The first stage entails project preparation, such as obtaining a decision on inclusion in the master power plan, an investment registration certificate, and an enterprise registration certificate. Stage two involves construction preparations, such as obtaining land use rights and securing environmental impact assessment approval, construction permits, and PPA. The next stage is the actual construction of the project, and the final stage is operation (which also means obtaining a license for electricity generation).

There is no generally applicable limitation on foreign ownership in the renewable energy sector. At present, foreign investors can own up to 100% of equity in power projects in Vietnam.

RELATED INSIGHTS​ 

May 25, 2026
After several years of policy discussion and continued efforts led by the Ministry of Commerce (MOC) to relax the list of reserved businesses under the Foreign Business Act B.E. 2542 (1999) (FBA), the reform process has now reached a significant milestone. On May 12, 2026, the Thai cabinet approved in principle two draft subordinate legislative instruments aimed at delisting certain reserved business activities under the FBA and reducing licensing requirements for foreign business operators. These developments signal a renewed and concrete effort by the government to modernize Thailand’s business regulatory framework in order to attract foreign investment and boost Thailand’s competitiveness in the global market. Nine Businesses Set for FBA Delisting Below is a list of the nine businesses that are being targeted for delisting from the FBA’s restrictions. A draft ministerial regulation would delist the first eight reserved businesses, while a royal decree has been drafted to delist the ninth business: Telecommunications services (Type 1 license only, covering operators without their own telecommunications infrastructure), under the supervision of the Office of the National Broadcasting and Telecommunications Commission. Treasury center services subject to the Foreign Exchange Control Act B.E. 2485 and under the supervision of the Bank of Thailand. Securities-collateralized lending, pursuant to the laws governing securities and exchange and derivatives regulated by the Securities and Exchange Commission. Agency, dealer, advisory, or fund management services relating to derivatives where the underlying assets fall outside the scope of the Derivatives Act B.E. 2546 (2003) Intra-group shared services, including administrative, human resources, and IT functions Intra-group domestic debt guarantee services Leasing of partial space for installation of financial service machines and automatic vending machines for employee use Petroleum drilling services Trading of agricultural product derivatives through a futures exchange, with physical delivery or receipt of agricultural products at a futures exchange–designated
February 10, 2026
Data center and cloud investments are forming a major focus of private-sector investment in Thailand, with tech giants like Amazon, Google, Microsoft, and TikTok, as well as numerous telecom and data center companies, committing significant outlays to data center and cloud development. The country’s Board of Investment (BOI) approved projects worth THB 1.87 trillion in 2025, and THB 746 billion of this was from planned data center investments—by far the largest amount from any single industry. Thailand’s swift rise as a regional data center hub is fueled by surging demand for cloud, AI, and digital services, as well as large-scale investments from global tech firms. The country’s strategic location, competitive power costs, robust fiber infrastructure, expanding IT talent, and supportive government policies—including BOI incentives and streamlined approvals—have made it an attractive destination for scalable and sustainable digital infrastructure investments. The BOI’s proactive approach in updating promoted categories and providing both tax and non-tax incentives further ensures Thailand’s continued growth in this sector. 2025 BOI Changes for Data Centers In the middle of 2025, the BOI responded to the remarkable trend by updating investment‑promotion categories across various sectors (e.g., machinery and electrical equipment, public utilities, digital and innovative industries) to accommodate growing investment in data‑center projects. Before the change, which was detailed in a notification that has applied to investment promotion applications submitted from July 1, 2025, onward, data‑center projects under BOI promotion were granted a single A1 incentive (an eight‑year corporate income‑tax exemption) and subject to one uniform set of conditions. The July 2025 notification restructured promotion for data centers into two categories based on power‑usage efficiency: high‑efficiency data centers and other data centers. Under these rules, qualified high‑efficiency data centers are eligible for an eight‑year corporate income tax (CIT) exemption, while for other data centers this exemption is
November 21, 2025
On November 17, 2025, Thailand’s Ministry of Interior introduced significant regulatory changes to make rooftop solar adoption easier and more cost-effective for property owners. Ministerial Regulation No. 72 B.E. 2568 (2025), issued under the Building Control Act B.E. 2522 (1979), was published in the Government Gazette on November 19, 2025, with immediate effect. Background Under the Building Control Act (BCA), any alteration made to a building requires either notification of the relevant authority or application for a building alteration permit—unless the alteration falls under a separate list of exceptions specified in the ministerial regulations issued under the BCA. In 2015, installation of solar rooftops on any residential building under 160 square meters was added to this list of exceptions, subject to inspection and notification requirements. The newly enacted regulation now eliminates many of these requirements and introduces a broader and more permissive framework to promote solar adoption nationwide. Key Changes Specifically, the regulation introduces three major changes: Expanded exemption from the definition of “building alteration”: The installation of solar panels on any building roof—regardless of the type of building or the total area of the installation—is no longer considered a building alteration under the BCA, provided that the total weight of the installation does not exceed 20 kg/m2. Removal of structural integrity certification requirement: The new regulation eliminates the obligation to obtain a structural stability certificate from a licensed civil engineer. Removal of notification requirement: Property owners or possessors are no longer required to notify the local authority before installation of a solar rooftop. Impact This significant streamlining of requirements for solar rooftop installation is expected to accelerate the adoption of renewable energy in the country, particularly for residential and commercial properties—similar to the way Thailand’s December 2024 removal of licensing requirements for factory solar rooftop installations encouraged such
September 25, 2025
Tilleke & Gibbins’ labor and employment team in Hanoi and Ho Chi Minh City has contributed the Vietnam chapter to Labor and Employment Disputes 2026. Drawing on the expertise of three of the firm’s employment specialists, the chapter provides practical guidance for navigating employment disputes in Vietnam and covers: Pre-action considerations: key requirements, third-party funding, contingency fee arrangements Issuing a claim: forum, territorial jurisdiction, standing, commencing claims, fees, service, defendants and legal personality, types of claims, time limits, counterclaims Case management: procedure, rules, amendments to claims, adding parties, consolidating proceedings, class and collective actions, evidence, witnesses, tactical considerations Interim relief: availability, requirements Trial: hearings conduct and time frames, confidentiality and public access, media reporting, elements of successful claims and burden of proof Alternative dispute resolution: available types, requirements and expectations, enforcement Collective employment and labor rights: enforcement and standing Remedies and enforcement: available remedies, assessing compensation, enforcement mechanisms Appeals: procedure, time frames, other means of challenge Updates and trends: recent cases and developments, technology developments, other issues The Vietnam chapter is available for download below. Tilleke & Gibbins also contributed the Cambodia and Thailand chapters to Labor and Employment Disputes 2026. Readers can also gain 30 days of complementary access to the full Labor and Employment Disputes 2026 guide and the rest of Lexology Panoramic’s varied offerings through this link.