October 9, 2019

PTIT Focus: Settlement of Disputes through Arbitration in a Thai Concession Agreement

Petroleum Institute of Thailand: PTIT Focus

With reference to the concession agreement form, as issued under the Ministerial Regulations of the Ministry of Energy regarding the Form for the Designation of a Concession Agreement B.E. 2555 (2012) (“Ministerial Regulations re: the Concession Agreement Form”), the form includes a provision that is related to dispute resolution by arbitration, as set out in Clause 13 of the Concession Agreement.

The principle here applies to scenarios in which (1) a dispute arises in connection with the Minister’s instructions, which requires the concessionaire to rectify a circumstance that constitutes grounds for revocation of the Concession under Section 52 of the Petroleum Act B.E. 2514 (1971), or (2) a dispute exists in respect to the question of whether or not there has been full compliance with the provisions of the Concession, and the parties cannot reach a mutual settlement within 60 days from the date on which one party issued a notice to the other party. In such a scenario, both parties shall settle the dispute through arbitration in accordance with the Arbitration Rules as prescribed by the United Nations Commission on International Trade Law (“UNCITRAL Arbitration Rules”). The version of the UNCITRAL Arbitration Rules to be used is the version that is valid on the date the dispute was submitted to the arbitrators.

This principle differs from the previous Concession Agreement Form that was issued under Ministerial Regulation no.4 (B.E. 2514) (1971) and Ministerial Regulation no.7 (B.E. 2532) (1989). This stipulated use of the arbitration rules of the International Court of Justice (“ICJ Arbitration Rules”), which still bind the parties that entered into such concession agreement.

Settlement of a dispute through arbitration is a type of dispute resolution whereby the parties can mutually agree to have a third party, which could either be a sole arbitrator or a group of arbitrators who have specific knowledge and expertise about the disputed issue, act as the person(s) who will consider and decide on the civil dispute that has arisen. Settlement of disputes through arbitration has many advantages, such as (1) offering a convenient and fast process; (2) having few complicated steps involved; and (3) enabling decision-making by persons with specific expertise. In addition, arbitration proceedings remain confidential, and therefore, business information and the reputation of the parties are still maintained. Furthermore, arbitration awards are also enforceable in many countries.

In respect to the award rendered by the arbitrators, the Ministerial Regulations also specify conditions in the Concession Agreement Form that require the arbitrators to take into account the laws of Thailand, and the principles of international laws that may be applicable, and also determine whether the expenses and fees of the arbitrators shall be borne solely by either party or shared proportionately by both parties. The award has to be rendered in writing and specify the reasons for the decision. The award shall be final and binding on both parties.

With reference to the Concession Agreement Form, the place of arbitration shall be in Bangkok, Thailand, unless the parties agree otherwise. The language used in the arbitration procedures shall be in Thai, except where both parties mutually agree to use English.

In addition, the Concession Agreement Form also designates those matters that shall not be referred to arbitrators, which are as follows: (1) criminal offences under the Petroleum Act B.E. 2514 (1971); (2) disputes in connection with the Petroleum Act B.E. 2514 (1971) where the concessionaire has initiated proceedings in a Thai court; and (3) disputes on rulings, or orders, which are treated as final under the Petroleum Act B.E. 2514 (1971).

In conclusion, the clause relating to dispute settlement through arbitration in the Concession Agreement Form designates the rules, form, process, place, and language to be used in the proceedings for the purpose of clarity in the dispute resolution. Arbitration procedures also provide advantages that can help expedite dispute settlements, reduce complicated procedures, and experts to issue awards on the disputes in question. In addition, the arbitration proceedings also serve to maintain full confidentiality regarding the business information of the parties involved.

 

This article first appeared in the April 2019 edition of PTIT Focus, the Petroleum Institute of Thailand’s monthly newsletter. The article was published in both English and Thai. For the original publication, please see the PDF below.

RELATED INSIGHTS​ 

June 3, 2024
Nearly a year after Vietnam’s issuance of its National Power Development Plan for 2021-2030, with a vision to 2050 (“PDP VIII”), the Prime Minister issued Decision No. 262/QD-TTg dated April 1, 2024, approving the Implementation Plan for PDP VIII (“Implementation Plan”). Among other contents, the Implementation Plan sets forth the list of prioritized power source projects through 2030, and the capacity of renewable energy sources through 2030, as detailed below. Prioritized Power Source Projects through 2030 The Implementation Plan lists out six types of power source projects prioritized for development through 2023 according to the capacity approved under PDP VIII. They include: Domestic gas-fired power (14,930 MW) LNG-fired power (22,400 MW) Coal-fired power (30,127 MW) Cogeneration power using residual heat, blast furnace gas, and by-products of technological lines in industrial facilities (2,700 MW) Hydropower (29,346 MW) Pumped storage hydropower (2,400 MW) With respect to each type, the Implementation Plan provides details of projects by location and their operational progress. Such information is set out in Schedule III of the Implementation Plan. For power source projects not included in this list, the provincial People’s Committees will consult with the Ministry of Industry and Trade (“MOIT”) and relevant agencies on compliance with the planning prior to appraisal and issuance of in-principle investment approval. Renewable Energy Projects through 2030 The Implementation Plan allocates the capacity of the following renewable energy sources by locality/region: Offshore wind power (6,000 MW) Onshore wind power (21,880 MW) Hydroelectric power (29,346 MW) Biomass electricity (1,088 MW) Electricity produced from waste (1,182 MW) Rooftop solar power for self-production and self-consumption (2,600 MW) Battery storage (300 MW) With respect to each renewable energy source, the Implementation Plan provides a list of certain renewable energy projects through 2030, including the expected life cycle of the projects, and the allocated capacity
April 29, 2024
On November 4, 2021, Cambodia’s Ministry of Mines and Energy (MME) issued a Prakas No. 0305 on Management of the Steam Energy Subsector within the Energy Sector. The prakas aims to regulate steam energy operations, and requires companies wishing to develop, build, install, or operate steam energy to apply for a steam energy license. As this is the first prakas regulating steam energy operations in Cambodia, all relevant companies operating in steam energy must apply for a steam energy license with the MME. Prakas 0305 discusses permits for three types of activities: Development, Construction, Installation, and Operation of Steam Energy. Companies wishing to develop, build, install, and operate steam energy production facilities must first apply for a permit from the MME. Steam Energy Service Provision. Companies wishing to develop, build, install, and operate steam energy for the purpose of supplying steam energy to consumers must apply for a permit for steam energy service provider in addition to a permit for development, construction, installation, and operation of steam energy. Two-in-One Steam Energy and Electricity Production. Companies wishing to develop and operate both steam energy and electricity production activities must also apply for a permit for two-in-one steam energy and electricity production. Companies operating without the necessary permits are subject to a daily fine of KHR 400,000–4,000,000 (approx. USD 100–1,000). In addition, they may face other penalties, including: An order to halt business activities; Permit suspension; Permit revocation; Judicial action; and Other legal measures as the MME deems fit. For more information on regulations and requirements for steam energy licenses in Cambodia, please contact Tilleke & Gibbins at [email protected].
January 25, 2024
Thailand’s Department of Mineral Fuels (DMF) has developed a framework to regulate carbon capture and storage (CCS) and related activities by introducing “carbon business” to the draft amendment to the Petroleum Act B.E. 2514 (1971). CCS involves the capture, treatment, transport, and underground storage of carbon dioxide produced from industrial power generation. The captured carbon can be used to enhance oil recovery, converted into fuel such as methane or DME (dimethyl ether), or converted to higher-value products. In Thailand, various companies have carried out CCS feasibility studies. Carbon Business and Licensing Under the draft amendment to the Petroleum Act, “carbon business” is defined as exploration for purposes of carbon storage or compression of carbon into carbon storage, while “carbon” is defined as carbon dioxide in the state of gas or supercritical fluid generated as a byproduct or captured from other sources and transported for storage. Any concessionaire, product-sharing contractor, or service contract holder that has been granted permission to explore for or produce petroleum under the Petroleum Act can apply for a carbon business license from the director-general of the DMF with the approval of the Petroleum Committee. Licenses are also available to any other parties who meet the eligibility criteria to be prescribed later by a ministerial regulation. Licenses for these parties will be allocated through competitive bidding according to procedures to be announced by the minister of the Ministry of Energy (MOE). In granting a license, the minister of the MOE and the director-general of the DMF will consider the geological suitability of carbon storage, storage systems, surrounding areas of carbon storage, risk of carbon leakage and movement, environmental impacts, and the applicant’s financial potential and ability in environmental management. Responsibilities of Carbon Business Operators Carbon business operators are required to monitor and inspect their installations, structures,
January 10, 2024
On December 15, 2023, the Electricity Authority of Cambodia (EAC) issued a notification requiring all owners of solar power systems to report their systems to their local electricity supplier by January 31, 2024. Systems that have already been reported under existing regulations are exempt from this requirement. Systems that remain unreported after the deadline will be deemed illegal and subject to penalties, including possible disconnection from the national grid. The rationale for the reporting requirement is that the EAC expects to adopt a new solar power regulation soon. Electricite du Cambodge (the main state-owned utility provider in Cambodia) and EAC-licensed private electricity providers are now gathering data on the current use of solar power systems in order to prepare for, adopt, and execute the upcoming regulation. The reporting requirement is to facilitate this gathering of data. The upcoming regulation, planned for early 2024 according to the notification, follows last year’s Prakas No. 159, which contained the Ministry of Mines and Energy’s guidelines and principles for rooftop solar systems. The EAC now needs to issue implementing regulations that are in line with the ministry’s guidelines and principles. Although stand-alone solar power systems that did not have a connection to the national grid were previously not regulated and did not require any authorizations, the EAC is now stating that all types of solar power systems need to adhere to the reporting requirement under the notification. According to the EAC, the upcoming regulation will address all types of systems, and the December 15 notification clearly announces that all types of solar power systems will need to obtain EAC approval under the upcoming regulation. Solar power system operators in Cambodia should report their systems to their local electricity providers by January 31, 2024, to avoid any penalties, while remaining vigilant for the upcoming