You are using an outdated browser and your browsing experience will not be optimal. Please update to the latest version of Microsoft Edge, Google Chrome or Mozilla Firefox. Install Microsoft Edge

July 22, 2016

Potential Amendments to Thailand’s Petroleum Act

Bangkok Post, Corporate Counsellor Column

The petroleum sector has seen a great deal of turbulence over the past two to three years, with the prices of Brent and West Texas Intermediate, the global oil benchmarks, falling from over USD 100 per barrel to less than USD 30, before recovering to around USD 45 in recent weeks. In Thailand, a new round of bidding for petroleum concessions was announced in 2014, only to be cancelled shortly afterward in anticipation of amendments to be made to the Petroleum Act and Petroleum Income Tax Act.

In June 2016, the Cabinet and the National Legislative Assembly considered an amendment to the Petroleum Act which would introduce two new structures for oil and gas development to occur in Thailand. The proposed amendment has not yet been enacted.

Until now, the only way for international oil companies to engage in exploration and production (E&P) activities in Thailand has been by way of a concession. While the proposed amendment would retain the concession option, it would also allow for E&P activities to be carried out through a production sharing agreement (PSA), or through a services contract.

These types of agreements are commonly employed in resource development activities in the Middle East and other oil and gas producing regions of the world. In Indonesia, one of the most oil-rich countries in the region, PSAs have been utilized and developed in practice for several decades.

A concession to conduct E&P activities essentially operates as a license for the international oil company. While the company is required to pay its taxes and comply with the concession agreement, as well as all relevant laws and rules that regulate its activities, the state takes a more “hands-off” approach to E&P activities under the concession regime.

Although petroleum is owned by the state when it is in the ground, under the concession regime, ownership transfers to the company at the wellhead. From the company’s perspective, this generally increases the appeal of concessions greatly. Even though the company will undertake a large amount of risk, the upside is that it obtains ownership of the petroleum products it produces, although it is generally required to sell produced natural gas to PTT Public Company Limited, a Thai state majority-owned oil and gas company.

By contrast, a PSA allows the state to take a more active role in E&P activities. Under the PSA model, the company essentially acts as a contractor with the state, and is paid for its services by obtaining ownership interests in a percentage of the oil and gas produced. While the company continues to assume a large portion of the risks in carrying out E&P work, it usually is entitled to receive a percentage of the produced petroleum to compensate for the costs it has incurred.

In order for the company to claim all of its “cost oil” (the petroleum allocated to cover its costs under the PSA), it would generally be required to comply with a work program and other terms outlined under the PSA. In the end, the PSA model generally allows the state and the company to share the rewards from E&P activities, while also spreading the risk of undertaking such operations.

Under the proposed Thai model, the cap on cost oil would be the amount stipulated in the approved budget, which must not exceed 50 percent of total oil produced. If actual costs exceed this amount, then the rules would permit the IOC to carry some of these costs forward to subsequent years.

In addition to the PSA, the amended Petroleum Act would introduce a third structure, the services contract, which would permit oil companies to enter into agreements with the state to perform E&P services in exchange for monetary compensation. This type of arrangement is similar to a “hire of work” agreement, whereby the state acts as the employer or principal, while the company acts as the service provider.

Under this arrangement, the state would retain full ownership in the petroleum products and would pay the company fees based on the success of its E&P work. The proposed amendment to the Petroleum Act would include a term limit of 30 years for any services agreement.

The potential introduction of two alternative structures to how international oil companies can operate in Thailand would provide the state with additional tools for promoting and expanding E&P operations. A number of existing concessions have already been extended and are scheduled to expire within the next decade. Moreover, given the prevailing market volatility in the global price of oil, many investors will be looking for lower-risk alternatives in order to diversify their asset portfolios.

Both the PSA and services contract models shift some of the risk of low oil prices to the state, since both contain mechanisms to recover for investment costs. Creating more varied structures to promote investment in petroleum exploration and production may allow for greater flexibility in achieving public policy objectives during a period of market volatility.

RELATED INSIGHTS​ 

May 19, 2023
On May 15, 2023, Vietnam’s Deputy Prime Minister Tran Hong Ha signed Decision No. 500 of the Prime Minister approving the National Power Development Plan for the period 2021-2030, with a vision to 2050 (“PDP VIII”), following extensive public consultations and multiple rounds of review since the first draft version was circulated in 2021. The plan was approved in the context that in the past few years, a number of large power projects have been behind schedule for operation, while new projects have not been able to be implemented due to waiting for additional planning. PDP VIII is the master plan for the development of the power source and transmission grid at 220kV or higher; services in renewable energy and new energy in Vietnam; and works connecting the power grids of Vietnam and neighboring countries. We set out below some quick updates regarding PDP VIII. 1. Development Targets Key development targets are summarized in the table below: Investors in coal, domestic gas, and LNG projects may need to have a conversion plan ready given the 2050 targets to convert to other sources of energy. 2. Solar Projects A list of 27 solar power projects that were planned for the period of 2021-2030 but which have not been assigned to investors are not allowed to be deployed but can be considered after 2030, except in the case of deployment in the form of self-production and self-consumption (Appendix IV). These projects represent 4,136.25 MW of capacity that will be left on the sidelines until 2030. 3. Hydropower Projects A list of 14 potential hydropower projects can be considered if economic and technical conditions allow for more hydropower development (Appendix III). These projects represent 1,244 MW of capacity that can be added to the hydropower targets for 2030. 4. Projects Prioritized for
March 22, 2023
Attorneys from Tilleke & Gibbins have contributed the Cambodia, Laos, Myanmar, and Vietnam sections to DLA Piper’s Global Government Contracting Country by Country guide, which provides essential information for businesses in 75 jurisdictions on how to source and enter into government contracting opportunities. The guide provides procurement information for jurisdictions in Africa, the Americas, Asia-Pacific, Europe, and the Middle East, and includes information on how to find procurement opportunities, the structure of procurement laws, and in-country resources and relevant publications. Each jurisdictional section includes valuable information on procedures for government tenders, bidding, and contract execution, as well as an overview of the legal and regulatory framework governing government procurement. Businesses can refer to the guide to gain a better understanding of procurement processes and regulations in each jurisdiction, which can help them identify potential opportunities and make informed decisions when pursuing government contracts. The guide’s procurement information for Cambodia, Laos, Myanmar, and Vietnam, combined with the online platform’s comprehensive resources, provides businesses and governments with a valuable tool to navigate the complex regulatory landscape of government contracting in the region. The full Global Contracting Country-by-Country guide is available on the DLA Piper website.
February 20, 2023
On December 20, 2022, the Notification re: Rules, Procedures, and Conditions on Transfer of Energy Licenses of the Thailand Energy Regulatory Commission (ERC) became effective. The notification sets out the new standard and procedure for transferring licenses for energy industry operation. The notable changes in the notification are provided below. Anti-Competition Consideration and Impact Assessment Report In considering the transfer of a license, in addition to ensuring the transferee meets all the qualifications for an applicant for the license, the ERC will consider if the transfer would (1) create a monopoly, reduce or restrict competition, or result in market dominance; (2) affect the contracting parties of the transferors or energy users; or (3) affect energy security or the public interest. In this respect, the vetting process for an application for license transfer would be separated into two different approaches. If the ERC believes that the transfer of the energy license would affect competition, energy users, energy security, or the public interest, the transferor will need to submit an impact assessment report on the license transfer to the ERC. In this regard, the ERC may establish a sub-committee or an independent consultant to contemplate the transfer at the transferor’s expense. However, if the ERC believes that the transfer of license would not lead to any impact, the transferor will not be required to submit the impact assessment. Also, if the license transfer is related to any transactions specified under the ERC’s Regulation re: Rules and Procedures on Merger and Cross-Shareholding in Energy Businesses, B.E. 2565, the ERC can combine the license transfer application with the M&A application. After approval, the ERC might require the transferee to periodically report to the ERC and comply with measures stipulated by the ERC. Therefore, an energy license holder which plans to carry out M&A
February 3, 2023
The Federation of Thai Industries (FTI) announced on January 16, 2023, the opening of registration for carbon credit trading on its Renewable Energy and Carbon Credit Exchange Platform. This new online platform supports the domestic carbon market and provides Thai exporters with the ability to purchase carbon credits, allowing them to address demands from importing nations to conform to carbon emission reduction regulations. This is expected to be a positive step forward for the current practice in Thailand, in which the carbon market operates as a voluntary and unregulated buy-sell platform, free from government regulation. Developed in partnership with the Thailand Greenhouse Gas Management Organization (TGO), the FTI: CC/RE/REC X Platform, or FTIX, is intended to increase the promotion of national carbon credits, renewable energy, and renewable energy certificates, thus improving the country’s efforts to mitigate climate change. Entrepreneurs interested in registering for carbon credit trading on the FTIX can do so through the FTIX website at fti-cc.com. The platform initially supports carbon credit trading through over-the-counter methods. In the near future, the FTIX will be developed to support 100% renewable energy (i.e., RE100 energy) and renewable energy certificate trading. However, the related tax and carbon pricing policies have not yet been issued. The TGO is currently in discussions with the Fiscal Policy Office and the Ministry of Finance regarding fiscal policy for the FTIX. For more information on the FTIX, or on any aspect of renewable energy activities in Thailand, please contact Charuwan Charoonchitsathian at [email protected], Napassorn Lertussavavivat at [email protected], or Ratchapat Triteeyaputranonta at [email protected].