April 7, 2015

Positively Private: Thailand’s Infrastructure Strategic Plan for 2015–2019

Southeast Asia Infrastructure

When the Thai government enacted the Private Investments in State Undertakings Act B.E. 2556 (2013) (PISUA)—a new law regulating public-private partnerships (PPPs) that was designed to streamline and clarify the PPP process and thereby boost private investment, especially in the infrastructure sector—measures were introduced to increase the effectiveness and transparency of the PPP process, something previously unseen in PISUA’s predecessor, the Private Participation in State Undertakings Act B.E. 2535 (1992) (PPSUA).

The provisions of the old PPSUA, which were in effect from 1992 until 2013, were written in a way that allowed for a variety of legal interpretations, thus providing for uncertainty as to which projects were captured within the scope of the law. Although regulations had been issued under the old law which addressed the selection process, many investors still perceived difficulties, which ultimately discouraged them from pursuing participation in PPPs in Thailand. Additionally, the old PPSUA lacked any provisions that would specifically guide the development of PPPs in Thailand, as it did not determine which sectors PPPs would benefit the public and should therefore be promoted.

While the new PISUA—which applies to all projects (except petroleum and mining concessions) with a value of THB one billion (approximately USD 30.5 million) or more—made only incremental changes relative to the older PPSUA in terms of approval procedures, it did set out a much stronger framework for comprehensive planning and quality of public-private ventures. This was evident in the stipulation of regulations on the use of qualified experts and consultants for preparing an independent project appraisal report, as well as sections calling for a PPP Policy Committee, a PPP Fund, and, as a main driver and guideline of PPP policy, a PPP Strategic Plan.

The new law has also established a PPP Development Fund, which is to be used for developing the PPP Strategic Plan, hiring consultants, and helping agencies develop PPPs that are consistent with the plan. Among other matters, the Strategic Plan identifies sectors and specific projects in which PPPs would be of benefit to Thailand, the priority of each, a target for private investment, and a timeframe for implementation. Five-year Strategic Plans are, from now on, to be prepared on a roll-on basis to provide for continual guidance.

The PPP Committee, which is chaired by the Prime Minister and vice-chaired by the Minister of Finance, is now required to work with the State Enterprise Policy Office (SEPO) to prepare a five-year Strategic Plan for PPPs for the Cabinet’s consideration. The SEPO, acting as the secretariat, has the duty to prepare a framework setting out the draft Strategic Plan, goals, target audience, and other details for approval of the PPP Committee. To ensure the plan reflects public needs, the PPP Policy Committee must also hold hearings to obtain input from state agencies and members of the public.

Once the hearings have been held and the Committee has then approved the draft Strategic Plan under consideration of the input from these hearings, it will submit the plan to the Cabinet for approval and promulgation.

In addition, once the Strategic Plan has been published in the Government Gazette, it is binding on state agencies regarding the preparation and approval of projects that fall under the Strategic Plan. Even the Cabinet and the PPP Committee are required to principally adhere to the Strategic Plan when they are making their decision regarding the approval of a project. However, if the Cabinet finds it expedient to revise a Strategic Plan that is already in effect, it does have the right to approve revisions suggested by the PPP Committee, and in such a case, the newly revised Strategic Plan would again have to be published in the Government Gazette to replace the previous one.

The current draft of the Strategic Plan for 2015-2019, which marks the first time such a Strategic Plan for PPPs in Thailand has ever been submitted, completed the public hearing stage in March 2015 and is currently awaiting approval by the Committee to be submitted to the Cabinet. In this draft, it has been stipulated that projects have to be conducted as PPPs in the following six fields: urban mass rail systems, urban toll roads, commercial ports, high-speed rail systems, telecommunication networks, and high-speed Internet systems.

For 15 other fields, the current draft Strategic Plan recommends that the government encourage the participation of private investors, but in these fields, private participation is not mandatory and the relevant state agencies have the right to decide whether they want to use a PPP or whether they would prefer to fund the project entirely by the use of the state budget or the state agency’s budget. In this group are fields such as inter-urban toll roads, solid waste disposal systems, airport management, terminals for transportation, packing, sorting, and distribution of goods, as well as administration, management, and maintenance of common ticketing systems. (For the full list of these 15 fields under group 2, please see “Table 1: PPP Implementation Timeframe” in the attached PDF.)

The current draft Strategic Plan also sets out the timeframes of implementation for most of the PPP fields (for details, please see “Table 1: PPP Implementation Timeframe” in the attached PDF), as well as the estimated investment amount for each field (for details, please see “Table 2: Estimated investment amounts under the Strategic Plan for 2015-2019” in the attached PDF). It now remains to be seen whether this Strategic Plan, once enacted, will indeed become a driving force for increased private investment in Thailand’s state undertakings.

RELATED INSIGHTS​ 

February 2, 2021
The application period for very small power producers (VSPPs) aiming to participate in the community power plant project is fast drawing to a close, with the deadline set for February 4, 2021. February 4 is also the closing date of the period for public comments on the two draft regulations outlining the pilot project to procure electricity from community power plants. These draft regulations are being finalized by the Energy Regulation Commission (ERC)  as part of an effort to boost the economy at a grassroots level. The community power plant project will procure 150 MW from VSPPs producing electricity from either biomass or biogas. 75 MW will be obtained from biomass VSPPs, with a limit of 6 MW to each biomass VSPP, while 75 MW of the electricity procurement will be obtained from biogas VSPPs with a limit of 3 MW each. VSPPs wishing to apply for the community power plant project must be 90%-owned by a private company, while 10% of ownership must be under a community enterprise or community enterprise network—consisting of at least 200 households—registered with the Department of Agricultural Extension. Furthermore, the fuel used by the VSPP must be either biogas or biomass obtained from the community enterprise or community enterprise network, and must not include fossil fuels. Once VSPPs have submitted their applications, they will be subject to a technical assessment to determine power production readiness, and will undergo a process of competitive bidding. VSPPs will be compared and selected based on a number of factors, including power production capacity, ability to operate for duration of the 20-year project, and the proposed fixed feed-in tariff (FiT). VSPPs that are chosen to participate in this pilot project will be subject to the following FiTs per unit of electricity, based on the type of fuel and
October 15, 2020
Practical Law has published the 2020 online version of Electricity Regulation in Thailand: Overview, a Q&A-style guide that provides detailed overviews of power issues and regulations for operators in the Thai electricity market. The Thailand overview is one of 22 such guides to jurisdictions worldwide, covering key practical issues related to the legal environment for agricultural operations.
October 13, 2020
On September 9, 2020, Vietnam’s Ministry of Industry and Trade (MOIT) issued Circular No. 21/2020/TT-BCT on the order and procedures for issuance of electricity operating licenses (Circular 21). Circular 21 will take effect on October 26, 2020, replacing Circular No. 36/2018/TT-BCT as amended by Circular No. 15/2019/TT-BCT (together, Circular 36).
October 1, 2020
Partner Vinh Quoc Nguyen and senior associate Tu Ngoc Trinh have contributed a chapter on electricity regulations in Vietnam, with a focus on the emerging renewable energy field, for the 2020 edition of the Practical Law Energy and Natural Resources Global Guide . The guide provides a comparative high-level overview, in a concise Q&A format, of energy laws and regulations in multiple jurisdictions around the world, and is split into three sections featuring regulations on (i) electricity, (ii) oil and gas, and (iii) mining. The Vietnam electricity chapter covers a range of topics, including the following: Recent trends in Vietnam’s electricity market and regulatory structure Companies involved in electricity generation, transmission, distribution and supply Import and export of electricity Electricity generation and renewable energy sources, including government policies and incentives Electricity transmission, distribution, and supply Proposals for reform, including privatization Practical Law Company is owned by Thomson Reuters and provides global guides covering legal know-how for corporate lawyers, including Global Guides to electricity regulation. Tilleke & Gibbins also contributes the Thailand chapter of this guide, as well as guides to numerous other practice areas. The full chapter can be viewed on the Practical Law website or downloaded using the button below.