November 24, 2015

New PPP Law Encourages Private Investment in the Railway Sector

Informed Counsel

Two years ago, the Private Investment in State Undertaking Act B.E. 2556 (2013) (PISUA) replaced the Private Participation in State Undertaking Act B.E. 2535 (1992) (PPSUA), which set out the criteria for a private party to jointly operate a government project. There were calls to replace the PPSUA because the law had a convoluted project approval process that discouraged private investment. During its 21-year lifespan, only 40 projects were completed under the PPSUA.

The PISUA aims to streamline and simplify the project approval process to attract more private investors. An increase in private sector investment would lessen the need for government loans and reduce the impact of financial restrictions caused by limited government budgets. In turn, this would improve the efficiency of developing infrastructure and providing public services to citizens.

Thailand’s railway sector would benefit tremendously from an increase in private sector investment. According to the Global Competitiveness Report 2015-2016, Thailand’s quality of railroad infrastructure ranks 78th out of 140 countries, indicating that there is scope for improvement. In light of this potential for improvement, this article will discuss the impact of the PISUA on Thailand’s railway sector.

Strategic Plan

The PISUA has proposed a draft Strategic Plan on Private Investment in State Undertakings (Strategic Plan), which sets out a five-year investment and policy plan that explicitly details the subsectors that are suitable for public–private partnerships.

The draft Strategic Plan was approved by the Thai Cabinet on May 26, 2015, and it was published in the Royal Gazette  on June 25, 2015. State agencies are therefore bound to prepare and approve projects that fall within the ambit of the Strategic Plan.

The Strategic Plan distinguishes between subsectors that require  private sector investment, such as certain infrastructure sectors, and subsectors in which the government only encourages  private sector participation. The railway sector largely falls within the former category and thus explicitly requires private sector investment.

Project Pipeline

On May 26, the Cabinet also acknowledged the Strategic Plan’s Project Pipeline, which lists all of the public projects with private sector investment. In the urban rail transit area, the Project Pipeline includes eight projects with an overall investment volume of approximately THB 568 billion. Twenty-five percent of this amount, which equates to THB 142 billion, shall be covered by private investors. Two of these projects are already under construction; five projects are undergoing feasibility studies; and for one project, the search for a suitable private investor is ongoing.

A feasibility study must be conducted for projects that exceed THB 1 billion. It has to be prepared by an external consultant who is in the State Enterprise Policy Office’s list of qualified consultants. A feasibility study aims to identify project costs, risks, and impacts, as well as the legal issues and potential problems in implementing the project through examination of Thailand’s current legal and regulatory framework. For PPPs in the railway sector, this includes railway-related laws and regulations.

In addition, the Project Pipeline outlines two projects in the high-speed rail sector with a total investment amount of THB 234 billion. One of these projects, a Bangkok-Rayong high-speed rail, requires a total investment of THB 152 billion, but the amount of private sector investment has not been determined yet. The other project, a Bangkok-Hua Hin high-speed rail, requires THB 81 billion of investment, and 11 percent of this amount, which equates to THB 9 billion, will be covered by private investors. Both of these projects are currently undergoing feasibility studies.

In total, private sector investment in the railway sector amounts to THB 802 billion. Nineteen percent of this amount, which is THB 154 billion, will be covered by private investors, excluding the Bangkok-Rayong high-speed rail. For capital-intensive railway projects, the government budget is the main source of funding, as private sector investment in infrastructure projects is limited to THB 500 billion. 

Acquiring Land or Immovable Assets

In order to construct new railways or railway accessories, it may become necessary to acquire land or immovable assets. The State Railway of Thailand is allowed to acquire land or immovable assets under the Railway Authority of Thailand Act B.E. 2494 (1951) (with amendments), which refers to the Expropriation of Immovable Property Act B.E. 2530 (1987). Under this Act, the state may acquire immovable property for the purpose of any public utility or for other public purposes. An appointed committee will appraise the estimated price of the immovable property to be expropriated and the amount of compensation to be provided.

The Mass Rapid Transit Authority of Thailand Act B.E. 2543 (2000) and the Act on Arrangement of Immovable Property for Mass Transit Undertaking B.E. 2540 (1997) apply to mass rapid transit systems within the Greater Bangkok Area and other provinces as stipulated by Royal Decree. They set out an independent procedure regarding the acquisition of immovable property for infrastructure projects.

Environmental Impact

The potential environmental impact of a project must also be considered. Under the Enhancement and Conservation of National Environmental Quality Act B.E. 2535 (1992), an environmental impact assessment report must be prepared at the stage of conducting a feasibility study on a specific project. This report must be approved by the Office of Environmental Policy and Planning. In the case of a public–private partnership, the government agency or state enterprise has the duty to prepare an impact assessment report.

With more streamlined project approval procedures and clearer guidelines, the PISUA is poised become a powerful tool in strengthening Thailand’s infrastructure sectors. It sets out a stronger framework for private investment in public sectors, and the recently enacted Strategic Plan may drive increased private investment in the railway sector. The development of private investment in the railway sector, however, will remain to be seen over the next five years as the impact of the PISUA evolves in practice.

RELATED INSIGHTS​ 

June 3, 2024
Nearly a year after Vietnam’s issuance of its National Power Development Plan for 2021-2030, with a vision to 2050 (“PDP VIII”), the Prime Minister issued Decision No. 262/QD-TTg dated April 1, 2024, approving the Implementation Plan for PDP VIII (“Implementation Plan”). Among other contents, the Implementation Plan sets forth the list of prioritized power source projects through 2030, and the capacity of renewable energy sources through 2030, as detailed below. Prioritized Power Source Projects through 2030 The Implementation Plan lists out six types of power source projects prioritized for development through 2023 according to the capacity approved under PDP VIII. They include: Domestic gas-fired power (14,930 MW) LNG-fired power (22,400 MW) Coal-fired power (30,127 MW) Cogeneration power using residual heat, blast furnace gas, and by-products of technological lines in industrial facilities (2,700 MW) Hydropower (29,346 MW) Pumped storage hydropower (2,400 MW) With respect to each type, the Implementation Plan provides details of projects by location and their operational progress. Such information is set out in Schedule III of the Implementation Plan. For power source projects not included in this list, the provincial People’s Committees will consult with the Ministry of Industry and Trade (“MOIT”) and relevant agencies on compliance with the planning prior to appraisal and issuance of in-principle investment approval. Renewable Energy Projects through 2030 The Implementation Plan allocates the capacity of the following renewable energy sources by locality/region: Offshore wind power (6,000 MW) Onshore wind power (21,880 MW) Hydroelectric power (29,346 MW) Biomass electricity (1,088 MW) Electricity produced from waste (1,182 MW) Rooftop solar power for self-production and self-consumption (2,600 MW) Battery storage (300 MW) With respect to each renewable energy source, the Implementation Plan provides a list of certain renewable energy projects through 2030, including the expected life cycle of the projects, and the allocated capacity
April 29, 2024
On November 4, 2021, Cambodia’s Ministry of Mines and Energy (MME) issued a Prakas No. 0305 on Management of the Steam Energy Subsector within the Energy Sector. The prakas aims to regulate steam energy operations, and requires companies wishing to develop, build, install, or operate steam energy to apply for a steam energy license. As this is the first prakas regulating steam energy operations in Cambodia, all relevant companies operating in steam energy must apply for a steam energy license with the MME. Prakas 0305 discusses permits for three types of activities: Development, Construction, Installation, and Operation of Steam Energy. Companies wishing to develop, build, install, and operate steam energy production facilities must first apply for a permit from the MME. Steam Energy Service Provision. Companies wishing to develop, build, install, and operate steam energy for the purpose of supplying steam energy to consumers must apply for a permit for steam energy service provider in addition to a permit for development, construction, installation, and operation of steam energy. Two-in-One Steam Energy and Electricity Production. Companies wishing to develop and operate both steam energy and electricity production activities must also apply for a permit for two-in-one steam energy and electricity production. Companies operating without the necessary permits are subject to a daily fine of KHR 400,000–4,000,000 (approx. USD 100–1,000). In addition, they may face other penalties, including: An order to halt business activities; Permit suspension; Permit revocation; Judicial action; and Other legal measures as the MME deems fit. For more information on regulations and requirements for steam energy licenses in Cambodia, please contact Tilleke & Gibbins at [email protected].
January 25, 2024
Thailand’s Department of Mineral Fuels (DMF) has developed a framework to regulate carbon capture and storage (CCS) and related activities by introducing “carbon business” to the draft amendment to the Petroleum Act B.E. 2514 (1971). CCS involves the capture, treatment, transport, and underground storage of carbon dioxide produced from industrial power generation. The captured carbon can be used to enhance oil recovery, converted into fuel such as methane or DME (dimethyl ether), or converted to higher-value products. In Thailand, various companies have carried out CCS feasibility studies. Carbon Business and Licensing Under the draft amendment to the Petroleum Act, “carbon business” is defined as exploration for purposes of carbon storage or compression of carbon into carbon storage, while “carbon” is defined as carbon dioxide in the state of gas or supercritical fluid generated as a byproduct or captured from other sources and transported for storage. Any concessionaire, product-sharing contractor, or service contract holder that has been granted permission to explore for or produce petroleum under the Petroleum Act can apply for a carbon business license from the director-general of the DMF with the approval of the Petroleum Committee. Licenses are also available to any other parties who meet the eligibility criteria to be prescribed later by a ministerial regulation. Licenses for these parties will be allocated through competitive bidding according to procedures to be announced by the minister of the Ministry of Energy (MOE). In granting a license, the minister of the MOE and the director-general of the DMF will consider the geological suitability of carbon storage, storage systems, surrounding areas of carbon storage, risk of carbon leakage and movement, environmental impacts, and the applicant’s financial potential and ability in environmental management. Responsibilities of Carbon Business Operators Carbon business operators are required to monitor and inspect their installations, structures,
January 10, 2024
On December 15, 2023, the Electricity Authority of Cambodia (EAC) issued a notification requiring all owners of solar power systems to report their systems to their local electricity supplier by January 31, 2024. Systems that have already been reported under existing regulations are exempt from this requirement. Systems that remain unreported after the deadline will be deemed illegal and subject to penalties, including possible disconnection from the national grid. The rationale for the reporting requirement is that the EAC expects to adopt a new solar power regulation soon. Electricite du Cambodge (the main state-owned utility provider in Cambodia) and EAC-licensed private electricity providers are now gathering data on the current use of solar power systems in order to prepare for, adopt, and execute the upcoming regulation. The reporting requirement is to facilitate this gathering of data. The upcoming regulation, planned for early 2024 according to the notification, follows last year’s Prakas No. 159, which contained the Ministry of Mines and Energy’s guidelines and principles for rooftop solar systems. The EAC now needs to issue implementing regulations that are in line with the ministry’s guidelines and principles. Although stand-alone solar power systems that did not have a connection to the national grid were previously not regulated and did not require any authorizations, the EAC is now stating that all types of solar power systems need to adhere to the reporting requirement under the notification. According to the EAC, the upcoming regulation will address all types of systems, and the December 15 notification clearly announces that all types of solar power systems will need to obtain EAC approval under the upcoming regulation. Solar power system operators in Cambodia should report their systems to their local electricity providers by January 31, 2024, to avoid any penalties, while remaining vigilant for the upcoming