New Incentives for Solar Power Projects in Vietnam

On April 6, 2020, the Prime Minister of Vietnam issued Decision No. 13/2020/QD-TTg on the mechanism for encouraging the development of solar power in Vietnam (“Decision 13”). Decision 13, which will take effect on May 22, 2020, introduces a number of new incentives and mechanisms for investors in solar power projects in Vietnam.

New Feed-in Tariff

One of the most notable features provided by Decision 13 is the extension of the feed-in tariff (FIT) for solar projects that failed to reach commercial operation date (COD) by June 30, 2019, in accordance with the earlier Decision 11/2017/QD-TTg on the mechanism for encouraging the development of solar power projects (“Decision 11”).

Decision 13 stipulates single national FITs for solar projects nationwide, with an exception for Ninh Thuan province. In particular:

National FITs

  • For floating solar power projects: VND 1,783/kWh (equivalent to 7.69 US cents/kWh);
  • For ground-mounted solar power projects: VND 1,644/kWh (equivalent to US 7.09 US cents/kWh); and
  • For rooftop solar power systems: VND 1,943/kWh (equivalent to 8.38 US cents/kWh).

The above FITs will be applied for 20 years from COD. Solar projects eligible to apply for these FITs include:

1) Grid-connected solar power projects satisfying the following conditions: (i) were granted a decision on investment policy before November 23, 2019, (ii) achieved COD between July 1, 2019, and December 31, 2020, and (iii) have solar cell efficiency of greater than 16% or module efficiency of greater than 15% (Article 5.1 and Article 5.5 of Decision 13). For projects not fulfilling these conditions, the purchase price of electricity will be determined by a “competitive mechanism” (Article 5.4 of Decision 13).

2) Rooftop solar power projects satisfying the following conditions: (i) have been directly connected to the grid of Vietnam Electricity (EVN), (ii) have sold electricity to EVN, and (iii) reached COD and had verified meter readings in the period from July 1, 2019, to December 31, 2020 (Article 8.2 and Article 8.4 of Decision 13). For projects not fulfilling these conditions, the purchase price will be agreed between the parties.

FITs for Ninh Thuan Province

Decision 13 continues to provide special incentives for projects located in Ninh Thuan province on Vietnam’s South Central Coast by allowing solar power projects which have been included in the national/provincial power development plans and achieved COD before January 1, 2021, to be eligible for the special applicable FIT of VND 2,086/kWh (equivalent to 9.35 US cents/kWh). Solar power projects in Ninh Thuan that are unable to achieve COD by the January 1, 2021, deadline will have applicable FIT determined by a competitive mechanism which may be introduced at that time.

Purchasers and Sellers

In accordance with Decision 13, rooftop solar power systems are allowed to sell part or all of the electricity produced not only to EVN (as previously regulated under Decision 11), but also to other purchasers for non-grid connected projects (Article 8.1 of Decision 13).

Power Purchase Agreement

Decision 13 requires the investor to sign a power purchase agreement (PPA) using the template issued by the Vietnamese government to sell electricity to EVN. Accordingly, the term of the solar energy PPA is 20 years from the COD, following which the parties may agree to extend the term or execute a new PPA in accordance with the existing regulations. For other projects in which the purchaser is not EVN or its authorized member units, the parties are allowed to freely negotiate the price, terms, and conditions (Article 8.3).

For more information on Decision 13, please contact us at [email protected].

RELATED INSIGHTS​ 

September 25, 2025
Tilleke & Gibbins’ labor and employment team in Hanoi and Ho Chi Minh City has contributed the Vietnam chapter to Labor and Employment Disputes 2026. Drawing on the expertise of three of the firm’s employment specialists, the chapter provides practical guidance for navigating employment disputes in Vietnam and covers: Pre-action considerations: key requirements, third-party funding, contingency fee arrangements Issuing a claim: forum, territorial jurisdiction, standing, commencing claims, fees, service, defendants and legal personality, types of claims, time limits, counterclaims Case management: procedure, rules, amendments to claims, adding parties, consolidating proceedings, class and collective actions, evidence, witnesses, tactical considerations Interim relief: availability, requirements Trial: hearings conduct and time frames, confidentiality and public access, media reporting, elements of successful claims and burden of proof Alternative dispute resolution: available types, requirements and expectations, enforcement Collective employment and labor rights: enforcement and standing Remedies and enforcement: available remedies, assessing compensation, enforcement mechanisms Appeals: procedure, time frames, other means of challenge Updates and trends: recent cases and developments, technology developments, other issues The Vietnam chapter is available for download below. Tilleke & Gibbins also contributed the Cambodia and Thailand chapters to Labor and Employment Disputes 2026. Readers can also gain 30 days of complementary access to the full Labor and Employment Disputes 2026 guide and the rest of Lexology Panoramic’s varied offerings through this link.
July 18, 2025
Vietnam’s electric vehicle (EV) industry is experiencing rapid growth, driven by a strong wave of new legislation, strategic plans, and government incentives. The government’s clear commitment to electrification is attracting foreign investment, supporting advanced production, and reducing reliance on internal combustion engine (ICE) imports. Recent national strategies, sector regulations, and technical standards demonstrate a rare level of regulatory momentum in Southeast Asia, positioning Vietnam as a competitive player in the global EV supply chain and an attractive market for foreign investors. An overview of legal developments for the EV sector in Vietnam is presented below. National Action Program for Green Transportation A key driver of Vietnam’s EV growth has been the National Action Program for Green Transportation through 2050 stipulated in Decision No. 876/QD-TTg of the prime minister dated July 22, 2022. The National Action Program sets a detailed roadmap for the green energy transition in road transport. For the period 2022–2030, the focus is on promoting the manufacturing, assembly, import, and conversion of road motor vehicles to electric power, expanding the use of 100% E5 gasoline for road vehicles, developing charging infrastructure to meet the needs of residents and businesses, and encouraging both new and existing bus stations and rest stops to meet green criteria. For the period 2031–2050, the roadmap aims to gradually restrict and ultimately cease by 2040 the manufacturing, assembly, and import of fossil fuel-powered cars, motorcycles, and mopeds for domestic use. By 2050, the goal is for 100% of road motor vehicles and construction vehicles participating in traffic to use electricity or green energy, for all bus stations and rest stops to meet green criteria, and for all machinery and equipment for loading and unloading to transition from fossil fuels to electricity or green energy. The program also calls for the completion of nationwide
July 16, 2025
On June 27, 2025, the National Assembly of Vietnam officially passed the amended Law on Atomic Energy, which will take effect on January 1, 2026. This legislative milestone follows the release of the fourth draft in June 2025, which was circulated for public consultation and builds upon earlier drafts from February, April, and early June. (See our previous article on the draft version here), Many provisions have been retained or refined to ensure greater specificity and alignment with Vietnam’s current legal framework. Once in force, the amended law will replace the 2008 Law on Atomic Energy (No. 18/2008/QH12), marking a significant step forward in modernizing Vietnam’s legal infrastructure for nuclear energy. The new law aims to harmonize with international standards, promote the safe and sustainable development of nuclear power, and facilitate future nuclear projects in the country. Noteworthy Updates in the Final Legislation Definition of National Radiation and Nuclear Safety Authority (NRNSA): The law introduces a clear definition of the NRNSA, outlining its roles and responsibilities in line with IAEA standards. Currently, this function is performed by the Vietnam Agency for Radiation and Nuclear Safety (VARANS) under the Ministry of Science and Technology. Digital Transformation Requirements: New provisions mandate the development of an integrated digital platform for data management, administrative procedures, and safety oversight, enhancing transparency and security. Policy Support for Training and Privatization: The law sets out principles for workforce incentives and sector privatization, with detailed regulations to be issued by the government. Dedicated Safety and Security Mechanism: A new section outlines inspection, supervision, violation handling, and enforcement procedures in the field of atomic energy, particularly for nuclear power plants. The NRNSA is empowered to conduct unscheduled inspections, suspend operations, and recommend license revocation when safety risks are identified. Key Provisions Retained or Clarified from the Draft Licensing