You are using an outdated browser and your browsing experience will not be optimal. Please update to the latest version of Microsoft Edge, Google Chrome or Mozilla Firefox. Install Microsoft Edge

April 8, 2020

Laos Issues COVID-19 Regulations for Freight, Insurance, Mineral Processing, Hydropower, and Healthcare Industries

Cross-Border Transportation of Goods

The National Taskforce Committee for COVID-19 Prevention and Control has issued Guideline No. 020, Regarding Prime Minister’s Order No.02/PM, dated April 2, 2020, which includes directives aimed at the freight sector. The transportation of goods is one of the few operations that is still permitted to cross the Lao border, although this is subject to the following regulations:

  • The importation of goods by vehicles is authorized up to the loading point closest to the port of entry. Once the goods have been unloaded, the vehicle must depart immediately. Before entering Laos the driver must fill out a health form and undergo an examination, as recommended by the National Taskforce Committee for COVID-19 Prevention and Control.
  • For the transportation of goods that transit through Laos before being exported to a third country, vehicles can proceed to the loading point in Laos and onward to their destination. If it is necessary to use a vehicle from the country of origin to reach the destination, the vehicle must be sprayed with a disinfectant in accordance with the specified rules. Foreign drivers are also prohibited, so the driver must be a Lao national.

Insurance Operations

On March 31, 2020, the Department of State Enterprise Investment Management and Insurance, which is under the Ministry of Finance, issued Notification No. 0338, which provides the following measures:

  • Deferment of the deadline for submission of insurance company financial reports and other reporting duties relating to the operation of insurance businesses for the year 2019. The new submission deadline is April 30, 2020.
  • Requirement for life insurance and health insurance policies that have already been sold to also cover COVID-19-related symptoms, in accordance with the amount and duration of coverage agreed upon in the contract.
  • Requirement for all insurance companies to devise a plan to form teams of employees to work in their offices from April 1 to April 19, 2020, and to support other employees to work remotely. Alternatively, companies can devise a specific schedule for each employee to come to work on an alternating basis, in order to prevent the spread of the COVID-19. Insurance companies are also requested to ensure they can receive claims while the COVID-19 outbreak measures are in place.

Factories that Process Minerals and Hydropower Plants under Construction

On April 5, 2020, the Ministry of Mines and Energy issued Notification 0432/MEM, which orders hydropower plant construction projects and factories involved in exploration for and processing of minerals to suspend their activities from April 1 to April 19.

Until April 19, these operations are required to proceed as follows:

  • Manage their staff and personnel who are currently renting and staying in accommodation within the factory, and follow measures issued by the government. Employees and personnel should not leave the factory premises, or their accommodations, if it is not necessary (a phrase that is not yet defined). Employees and personnel must be prohibited from traveling to local places where there is a risk of contracting the virus.
  • Disseminate information about COVID-19 to employees and personnel on-site in order to prevent and combat the spread of the virus, in accordance with recommendations issued by the local authorities. Any employee who displays symptoms of the virus should be separated from the other employees, and the supervisor should immediately contact the emergency number (166 or 020-5406-6777) in order to implement the recommendations issued by the National Task Force.
  • Ensure that social distancing of two meters is strictly observed by all employees, provide masks, and ensure that soap is available for washing hands, or disinfectant is provided to kill the virus, in accordance with the recommendations of the National Task Force.
  • Disinfect the premises, including production sites, canteens, and accommodations, along with other areas where there is a risk of the virus spreading.

Facilities that have been closed and adversely impacted by COVID-19 should report the impact to the Ministry of Energy and Mines, and the related authorities, as indicated in Prime Minister’s Order No. 06/PM, dated March 29, 2020. In addition, the ministry welcomes comments regarding this notification from stakeholders and from the public and private sectors.

Private Hospitals and Clinics Prohibited from Treating COVID-19

Out of a concern about some private caregiving facilities in the country being inadequately equipped to handle the epidemic, on April 2, 2020, the Ministry of Health issued Notification 0413/MOH, ordering private hospitals and treatment facilities not to attempt treatment of COVID-19 patients (with limited exceptions for international-standard private hospitals). 

This notification followed the issuance of previous measures seemingly announcing the closure of private hospitals and private treatment centers. Together, however, these regulations mean that  specialized clinics and private hospitals can provide their usual medical services, but they are not allowed to attempt treatment of COVID-19 patients; if a case of COVID-19 is suspected, they should call the emergency hotline immediately.

For more details on these measures, or on any aspect of Laos’ response to the COVID-19 pandemic, please contact Dino Santaniello at [email protected].

RELATED INSIGHTS​ 

December 4, 2025
Thailand has expanded the circumstances under which state agencies may bypass competitive bidding procedures to address urgent security challenges. On November 28, 2025, Thailand’s Ministry of Finance published the Ministerial Regulation Determining Cases of Procurement by Specific Method (No. 6) B.E. 2568 in the Royal Gazette, introducing a new pathway for procuring supplies and services needed to address cyber and military threats that may affect the stability of government agencies or the nation. For technology vendors, cybersecurity firms, and defense contractors, this regulatory change creates immediate opportunities to engage directly with government buyers facing urgent security challenges. New Fast-Track Category for Security Threats The regulation amends Thailand’s Public Procurement and Supplies Management Act B.E. 2560 (2017) to add a new category of procurement that qualifies for the “specific method”—a noncompetitive, direct selection process. Previously, agencies could use this expedited method only in limited circumstances, such as emergencies, cases with proprietary technology requirements, or national security operations. The new provision explicitly covers procurement of supplies related to preventing or resolving cyber or military threats that could impact the stability of a state agency or the country. This addition recognizes the urgent nature of modern security challenges, where competitive bidding timelines may leave agencies vulnerable during critical threat windows. State agencies dealing with active cyberattacks, preparing defensive measures against anticipated threats, or responding to military security concerns can now move directly to negotiate with qualified vendors rather than conducting lengthy public tender processes. Vendor Considerations Vendors offering cybersecurity solutions now have a regulatory avenue to work directly with government clients when stability concerns are present. These solutions include threat detection systems, anti-ransomware tools, incident response services, firewalls, and security consulting. Similarly, defense contractors providing military equipment or specialized security supplies can pursue direct engagement channels where traditional procurement methods would create
November 25, 2025
Food safety incidents can emerge without warning, requiring businesses to act swiftly to protect consumers and comply with regulatory obligations. Across Southeast Asia, Thailand, Vietnam, and Indonesia have each developed comprehensive food recall frameworks designed to ensure rapid removal of unsafe products from the market while holding businesses accountable for compliance failures. While these three jurisdictions share common objectives—protecting public health and ensuring food safety—each has crafted distinct regulatory approaches reflecting their unique administrative structures, enforcement priorities, and legal traditions. Understanding these differences is essential for food businesses operating in the region, as recall procedures, timelines, reporting requirements, and penalties vary significantly across borders. This guide, available through the button below, examines the food recall regulations in Indonesia, Thailand, and Vietnam, providing practical guidance on legal requirements, procedural steps, and compliance obligations in each market.
November 21, 2025
On November 17, 2025, Thailand’s Ministry of Interior introduced significant regulatory changes to make rooftop solar adoption easier and more cost-effective for property owners. Ministerial Regulation No. 72 B.E. 2568 (2025), issued under the Building Control Act B.E. 2522 (1979), was published in the Government Gazette on November 19, 2025, with immediate effect. Background Under the Building Control Act (BCA), any alteration made to a building requires either notification of the relevant authority or application for a building alteration permit—unless the alteration falls under a separate list of exceptions specified in the ministerial regulations issued under the BCA. In 2015, installation of solar rooftops on any residential building under 160 square meters was added to this list of exceptions, subject to inspection and notification requirements. The newly enacted regulation now eliminates many of these requirements and introduces a broader and more permissive framework to promote solar adoption nationwide. Key Changes Specifically, the regulation introduces three major changes: Expanded exemption from the definition of “building alteration”: The installation of solar panels on any building roof—regardless of the type of building or the total area of the installation—is no longer considered a building alteration under the BCA, provided that the total weight of the installation does not exceed 20 kg/m2. Removal of structural integrity certification requirement: The new regulation eliminates the obligation to obtain a structural stability certificate from a licensed civil engineer. Removal of notification requirement: Property owners or possessors are no longer required to notify the local authority before installation of a solar rooftop. Impact This significant streamlining of requirements for solar rooftop installation is expected to accelerate the adoption of renewable energy in the country, particularly for residential and commercial properties—similar to the way Thailand’s December 2024 removal of licensing requirements for factory solar rooftop installations encouraged such