Impact of the Asian Infrastructure Investment Bank’s Operational Policies

Bangkok Post, Corporate Counsellor Column

Thailand’s current infrastructure needs are well known to policymakers. The development of urban and inter-city rail links, telecommunication networks, and renewable energy projects are some of the areas in need of investment, as identified by government agencies.

Much of the infrastructure development over the next decade will be capital-intensive, meaning that funding from the Asian Infrastructure Investment Bank (AIIB) could assist in developing Thailand’s various projects.

The AIIB is a new multilateral development bank, initiated by China, with a stated purpose to “foster sustainable economic development, create wealth and improve infrastructure connectivity in Asia by investing in infrastructure and other productive sectors.” At its first meeting in January, the bank’s board of directors adopted a number of policies on financing, pricing, and procurement. These policies provide an outline of how the AIIB will select projects to invest in, and the form these investments will take.

The AIIB’s Articles of Agreement, signed by representatives of 57 member states, is the basic constitutional document from which the AIIB’s governing bodies, such as the board of governors, the board of directors, and the president, derive their operational authority. Article 11 permits the AIIB to carry out its investment activities by participating in direct loans, making equity investments and guarantees, and undertaking other forms of investment activities.

The Operational Policy on Financing, which was adopted by the board on January 17, outlines the bank’s financing policies. Among other things, it sets out the following conditions that must be satisfied for the AIIB to invest in a particular project:

  • The project must have clearly defined development objectives consistent with the bank’s stated purpose, and those objectives must permit appropriate evaluation of the project’s impact;
  • The project must provide for specific productive activities necessary to meet development objectives;
  • Alternative sources of finance, particularly private capital, must not be available for the project on terms and conditions that the AIIB considers reasonable; and
  • The project must comply with the other requirements of the operational policy and other AIIB policies.

Broadly, the AIIB’s financing activities can be broken down into sovereign-backed financing and financing which is not sovereign backed. Sovereign-backed financing means either a loan to a Member; a loan which has been guaranteed by a Member; or a guarantee that covers debt service defaults under a loan that are caused by government failure to meet a specific obligation in relation to the project or by a borrower’s failure to make a payment under the loan, and is accompanied by an indemnity by the Member to the AIIB. Nonsovereign-backed financing is any financing that does not fall within the definition of “sovereign-backed financing,” as outlined above.

In determining whether to grant sovereign-backed financing, the AIIB will assess whether the project’s impact on the member’s fiscal sustainability is acceptable. The bank will place significant weight on debt sustainability analyses conducted by the International Monetary Fund and the World Bank. It will also assess whether the project contains acceptable oversight arrangements that provide reasonable assurances that the proceeds will only be used for the stated purposes of the financing.

The policy also outlines terms and conditions that must be included in the transaction documents for loans, including specific remedies, external debt reporting, and adherence to the general conditions as stipulated by the AIIB board from time to time. Significantly, the AIIB will not generally require specific security from a loan recipient that is a member, though it may require security if it is required by a co-financier. Loans to non-members may require security.

The policy provides the AIIB with significant leeway when granting non-sovereign-backed financing, although it explicitly states that market-based principles will be applied. Loans may be granted to project companies on a limited-recourse basis or directly to the project company’s sponsor (usually, the majority shareholders of the project company). The policy stipulates that loans will be based on standard template term sheets, loan agreements, and other relevant financing documentation.

Provided that the investment conditions are acceptable, the policy permits direct equity investments from the AIIB to either public- or private-sector companies. This form of investment may be particularly beneficial if the registered share capital of the project company must exceed a certain threshold.

Thailand has ambitious infrastructure goals that it aims to achieve in the next decade, and meeting these goals will require substantial capital investments. The AIIB is a potential source of funding for these projects, particularly when private capital is insufficient. In addition, since the AIIB will be investing in infrastructure throughout Asia, Thailand stands to gain from the knock-on effects of improved infrastructure in neighboring countries.

As the AIIB begins the process of approving investment plans for projects, it will be important to watch how the policy is implemented in practice.

RELATED INSIGHTS​ 

June 3, 2024
Nearly a year after Vietnam’s issuance of its National Power Development Plan for 2021-2030, with a vision to 2050 (“PDP VIII”), the Prime Minister issued Decision No. 262/QD-TTg dated April 1, 2024, approving the Implementation Plan for PDP VIII (“Implementation Plan”). Among other contents, the Implementation Plan sets forth the list of prioritized power source projects through 2030, and the capacity of renewable energy sources through 2030, as detailed below. Prioritized Power Source Projects through 2030 The Implementation Plan lists out six types of power source projects prioritized for development through 2023 according to the capacity approved under PDP VIII. They include: Domestic gas-fired power (14,930 MW) LNG-fired power (22,400 MW) Coal-fired power (30,127 MW) Cogeneration power using residual heat, blast furnace gas, and by-products of technological lines in industrial facilities (2,700 MW) Hydropower (29,346 MW) Pumped storage hydropower (2,400 MW) With respect to each type, the Implementation Plan provides details of projects by location and their operational progress. Such information is set out in Schedule III of the Implementation Plan. For power source projects not included in this list, the provincial People’s Committees will consult with the Ministry of Industry and Trade (“MOIT”) and relevant agencies on compliance with the planning prior to appraisal and issuance of in-principle investment approval. Renewable Energy Projects through 2030 The Implementation Plan allocates the capacity of the following renewable energy sources by locality/region: Offshore wind power (6,000 MW) Onshore wind power (21,880 MW) Hydroelectric power (29,346 MW) Biomass electricity (1,088 MW) Electricity produced from waste (1,182 MW) Rooftop solar power for self-production and self-consumption (2,600 MW) Battery storage (300 MW) With respect to each renewable energy source, the Implementation Plan provides a list of certain renewable energy projects through 2030, including the expected life cycle of the projects, and the allocated capacity
April 29, 2024
On November 4, 2021, Cambodia’s Ministry of Mines and Energy (MME) issued a Prakas No. 0305 on Management of the Steam Energy Subsector within the Energy Sector. The prakas aims to regulate steam energy operations, and requires companies wishing to develop, build, install, or operate steam energy to apply for a steam energy license. As this is the first prakas regulating steam energy operations in Cambodia, all relevant companies operating in steam energy must apply for a steam energy license with the MME. Prakas 0305 discusses permits for three types of activities: Development, Construction, Installation, and Operation of Steam Energy. Companies wishing to develop, build, install, and operate steam energy production facilities must first apply for a permit from the MME. Steam Energy Service Provision. Companies wishing to develop, build, install, and operate steam energy for the purpose of supplying steam energy to consumers must apply for a permit for steam energy service provider in addition to a permit for development, construction, installation, and operation of steam energy. Two-in-One Steam Energy and Electricity Production. Companies wishing to develop and operate both steam energy and electricity production activities must also apply for a permit for two-in-one steam energy and electricity production. Companies operating without the necessary permits are subject to a daily fine of KHR 400,000–4,000,000 (approx. USD 100–1,000). In addition, they may face other penalties, including: An order to halt business activities; Permit suspension; Permit revocation; Judicial action; and Other legal measures as the MME deems fit. For more information on regulations and requirements for steam energy licenses in Cambodia, please contact Tilleke & Gibbins at [email protected].
January 25, 2024
Thailand’s Department of Mineral Fuels (DMF) has developed a framework to regulate carbon capture and storage (CCS) and related activities by introducing “carbon business” to the draft amendment to the Petroleum Act B.E. 2514 (1971). CCS involves the capture, treatment, transport, and underground storage of carbon dioxide produced from industrial power generation. The captured carbon can be used to enhance oil recovery, converted into fuel such as methane or DME (dimethyl ether), or converted to higher-value products. In Thailand, various companies have carried out CCS feasibility studies. Carbon Business and Licensing Under the draft amendment to the Petroleum Act, “carbon business” is defined as exploration for purposes of carbon storage or compression of carbon into carbon storage, while “carbon” is defined as carbon dioxide in the state of gas or supercritical fluid generated as a byproduct or captured from other sources and transported for storage. Any concessionaire, product-sharing contractor, or service contract holder that has been granted permission to explore for or produce petroleum under the Petroleum Act can apply for a carbon business license from the director-general of the DMF with the approval of the Petroleum Committee. Licenses are also available to any other parties who meet the eligibility criteria to be prescribed later by a ministerial regulation. Licenses for these parties will be allocated through competitive bidding according to procedures to be announced by the minister of the Ministry of Energy (MOE). In granting a license, the minister of the MOE and the director-general of the DMF will consider the geological suitability of carbon storage, storage systems, surrounding areas of carbon storage, risk of carbon leakage and movement, environmental impacts, and the applicant’s financial potential and ability in environmental management. Responsibilities of Carbon Business Operators Carbon business operators are required to monitor and inspect their installations, structures,
January 10, 2024
On December 15, 2023, the Electricity Authority of Cambodia (EAC) issued a notification requiring all owners of solar power systems to report their systems to their local electricity supplier by January 31, 2024. Systems that have already been reported under existing regulations are exempt from this requirement. Systems that remain unreported after the deadline will be deemed illegal and subject to penalties, including possible disconnection from the national grid. The rationale for the reporting requirement is that the EAC expects to adopt a new solar power regulation soon. Electricite du Cambodge (the main state-owned utility provider in Cambodia) and EAC-licensed private electricity providers are now gathering data on the current use of solar power systems in order to prepare for, adopt, and execute the upcoming regulation. The reporting requirement is to facilitate this gathering of data. The upcoming regulation, planned for early 2024 according to the notification, follows last year’s Prakas No. 159, which contained the Ministry of Mines and Energy’s guidelines and principles for rooftop solar systems. The EAC now needs to issue implementing regulations that are in line with the ministry’s guidelines and principles. Although stand-alone solar power systems that did not have a connection to the national grid were previously not regulated and did not require any authorizations, the EAC is now stating that all types of solar power systems need to adhere to the reporting requirement under the notification. According to the EAC, the upcoming regulation will address all types of systems, and the December 15 notification clearly announces that all types of solar power systems will need to obtain EAC approval under the upcoming regulation. Solar power system operators in Cambodia should report their systems to their local electricity providers by January 31, 2024, to avoid any penalties, while remaining vigilant for the upcoming