Engineering, Procurement, and Construction: Considerations for Foreign Companies Working on Projects in Thailand

Bangkok Post, Corporate Counsellor Column

The pace of Thailand’s infrastructure development has continued to grow in the past few years, bringing numerous opportunities for engineering, procurement, and construction (EPC) firms based overseas that are looking for ways to participate in a project in Thailand. However, potential investors will need to have a solid understanding of the country’s legal and regulatory framework prior to investing significant time, energy, and capital.

The most significant law relating to the participation of foreigners in business activities in Thailand is the Foreign Business Act, B.E. 2542 (1999) (FBA). List 3 of the FBA restricts a number of activities which engineering and construction firms will likely engage in, such as architectural, engineering, and construction services, as well as wholesale or retail trading with registered capital under THB 100 million and other ancillary services. A company that has half or more of its shares held by non-Thais will be deemed as “foreign” under the FBA and thus subject to its restrictions.

Foreign companies and foreign majority-owned Thai companies wishing to engage in these activities in Thailand must first obtain a foreign business license or foreign business certificate from the Department of Business Development, Ministry of Commerce. Importantly, each business line will be treated separately for the purposes of assessing compliance under the FBA. A company that has been granted a foreign business license to conduct architectural services, for example, is not automatically permitted to conduct engineering services or construction activities.

Foreign companies must also be aware of professional licensing requirements. Engineering services and architectural services are both licensed activities in Thailand, meaning companies who regularly engage in such services are required to comply with the regulations of the Council of Engineers and the Architect Council of Thailand, respectively. To become registered and licensed at either Council, a company must have Thai-licensed engineers or architects sitting on its board of directors. Foreigners are prohibited from working as engineers or architects in Thailand, meaning a company wishing to engage in engineering, architecture and/or construction projects will need to engage Thai engineers and/or architects. Engaging in such services without obtaining the proper license shall result in a fine and imprisonment.

Another issue is that a foreign-incorporated company may not send non-Thai citizens to work in Thailand without first obtaining a foreign business license. Even after such license has been granted, a common misconception, especially among foreign professionals whose citizenship permits them visa-free travel to Thailand, is that they are permitted to perform business-related activities on a short-term basis provided they indicate that their purpose of travel is “business” when arriving at their port of entry. In reality, foreign nationals are required to obtain work permits after arriving in Thailand prior to engaging in any work. Penalties for not obtaining such work permits include severe fines, imprisonment, and/or summary deportation and blacklisting. This is an important point to consider for offshore contractors intending to deploy employees to perform site visits in Thailand.

A common feature of multinational engineering firms that conduct EPC activities in Thai projects is the “split” contract. Typically, the EPC activities will be divided into two or more contracts, with a wrap-around agreement signed by all parties to ensure joint liability of contractors. Often, engineering and procurement activities will be performed by an offshore contractor, while the onshore contractor will be responsible for construction and commissioning. When utilizing this structure, the onshore contractor must have obtained a foreign business license or certificate to perform construction work. Moreover, if the onshore contractor has not obtained an engineering license in its own name, it will need to retain a licensed Thai subcontractor to approve engineering schematics.

A foreign engineering contractor may consider establishing a Thai subsidiary and applying for investment promotion from the Board of Investment to establish a Trade and Investment Support Office (TISO), which will allow it to engage in support services, including onshore activities, with certain exceptions, such as civil engineering and architectural services. In case a TISO-promoted company is established with foreign majority ownership, a foreign business certificate will be required.

A Ministerial Regulation was adopted by the Ministry of Commerce with respect to the FBA on May 26, 2017, and outlines a number of service businesses which no longer require a foreign business license under List 3(21) of the FBA, including some services provided by parties who contract with government agencies or state-owned entities. However, this exception does not apply to engineering services, architectural services, or construction.

In conclusion, foreign EPC contractors are able to participate in projects in Thailand, provided they abide by certain licensing requirements and have a clear understanding of the regulatory framework. Much like engineering schematics, it is important to ensure that contractual structures are properly devised at the outset of any project. While the regulatory framework for foreign EPC contractors is presently complex, it will be interesting to observe whether the government takes any action to streamline the approval processes to achieve its national infrastructure development objectives.

RELATED INSIGHTS​ 

June 3, 2024
Nearly a year after Vietnam’s issuance of its National Power Development Plan for 2021-2030, with a vision to 2050 (“PDP VIII”), the Prime Minister issued Decision No. 262/QD-TTg dated April 1, 2024, approving the Implementation Plan for PDP VIII (“Implementation Plan”). Among other contents, the Implementation Plan sets forth the list of prioritized power source projects through 2030, and the capacity of renewable energy sources through 2030, as detailed below. Prioritized Power Source Projects through 2030 The Implementation Plan lists out six types of power source projects prioritized for development through 2023 according to the capacity approved under PDP VIII. They include: Domestic gas-fired power (14,930 MW) LNG-fired power (22,400 MW) Coal-fired power (30,127 MW) Cogeneration power using residual heat, blast furnace gas, and by-products of technological lines in industrial facilities (2,700 MW) Hydropower (29,346 MW) Pumped storage hydropower (2,400 MW) With respect to each type, the Implementation Plan provides details of projects by location and their operational progress. Such information is set out in Schedule III of the Implementation Plan. For power source projects not included in this list, the provincial People’s Committees will consult with the Ministry of Industry and Trade (“MOIT”) and relevant agencies on compliance with the planning prior to appraisal and issuance of in-principle investment approval. Renewable Energy Projects through 2030 The Implementation Plan allocates the capacity of the following renewable energy sources by locality/region: Offshore wind power (6,000 MW) Onshore wind power (21,880 MW) Hydroelectric power (29,346 MW) Biomass electricity (1,088 MW) Electricity produced from waste (1,182 MW) Rooftop solar power for self-production and self-consumption (2,600 MW) Battery storage (300 MW) With respect to each renewable energy source, the Implementation Plan provides a list of certain renewable energy projects through 2030, including the expected life cycle of the projects, and the allocated capacity
April 29, 2024
On November 4, 2021, Cambodia’s Ministry of Mines and Energy (MME) issued a Prakas No. 0305 on Management of the Steam Energy Subsector within the Energy Sector. The prakas aims to regulate steam energy operations, and requires companies wishing to develop, build, install, or operate steam energy to apply for a steam energy license. As this is the first prakas regulating steam energy operations in Cambodia, all relevant companies operating in steam energy must apply for a steam energy license with the MME. Prakas 0305 discusses permits for three types of activities: Development, Construction, Installation, and Operation of Steam Energy. Companies wishing to develop, build, install, and operate steam energy production facilities must first apply for a permit from the MME. Steam Energy Service Provision. Companies wishing to develop, build, install, and operate steam energy for the purpose of supplying steam energy to consumers must apply for a permit for steam energy service provider in addition to a permit for development, construction, installation, and operation of steam energy. Two-in-One Steam Energy and Electricity Production. Companies wishing to develop and operate both steam energy and electricity production activities must also apply for a permit for two-in-one steam energy and electricity production. Companies operating without the necessary permits are subject to a daily fine of KHR 400,000–4,000,000 (approx. USD 100–1,000). In addition, they may face other penalties, including: An order to halt business activities; Permit suspension; Permit revocation; Judicial action; and Other legal measures as the MME deems fit. For more information on regulations and requirements for steam energy licenses in Cambodia, please contact Tilleke & Gibbins at [email protected].
January 25, 2024
Thailand’s Department of Mineral Fuels (DMF) has developed a framework to regulate carbon capture and storage (CCS) and related activities by introducing “carbon business” to the draft amendment to the Petroleum Act B.E. 2514 (1971). CCS involves the capture, treatment, transport, and underground storage of carbon dioxide produced from industrial power generation. The captured carbon can be used to enhance oil recovery, converted into fuel such as methane or DME (dimethyl ether), or converted to higher-value products. In Thailand, various companies have carried out CCS feasibility studies. Carbon Business and Licensing Under the draft amendment to the Petroleum Act, “carbon business” is defined as exploration for purposes of carbon storage or compression of carbon into carbon storage, while “carbon” is defined as carbon dioxide in the state of gas or supercritical fluid generated as a byproduct or captured from other sources and transported for storage. Any concessionaire, product-sharing contractor, or service contract holder that has been granted permission to explore for or produce petroleum under the Petroleum Act can apply for a carbon business license from the director-general of the DMF with the approval of the Petroleum Committee. Licenses are also available to any other parties who meet the eligibility criteria to be prescribed later by a ministerial regulation. Licenses for these parties will be allocated through competitive bidding according to procedures to be announced by the minister of the Ministry of Energy (MOE). In granting a license, the minister of the MOE and the director-general of the DMF will consider the geological suitability of carbon storage, storage systems, surrounding areas of carbon storage, risk of carbon leakage and movement, environmental impacts, and the applicant’s financial potential and ability in environmental management. Responsibilities of Carbon Business Operators Carbon business operators are required to monitor and inspect their installations, structures,
January 10, 2024
On December 15, 2023, the Electricity Authority of Cambodia (EAC) issued a notification requiring all owners of solar power systems to report their systems to their local electricity supplier by January 31, 2024. Systems that have already been reported under existing regulations are exempt from this requirement. Systems that remain unreported after the deadline will be deemed illegal and subject to penalties, including possible disconnection from the national grid. The rationale for the reporting requirement is that the EAC expects to adopt a new solar power regulation soon. Electricite du Cambodge (the main state-owned utility provider in Cambodia) and EAC-licensed private electricity providers are now gathering data on the current use of solar power systems in order to prepare for, adopt, and execute the upcoming regulation. The reporting requirement is to facilitate this gathering of data. The upcoming regulation, planned for early 2024 according to the notification, follows last year’s Prakas No. 159, which contained the Ministry of Mines and Energy’s guidelines and principles for rooftop solar systems. The EAC now needs to issue implementing regulations that are in line with the ministry’s guidelines and principles. Although stand-alone solar power systems that did not have a connection to the national grid were previously not regulated and did not require any authorizations, the EAC is now stating that all types of solar power systems need to adhere to the reporting requirement under the notification. According to the EAC, the upcoming regulation will address all types of systems, and the December 15 notification clearly announces that all types of solar power systems will need to obtain EAC approval under the upcoming regulation. Solar power system operators in Cambodia should report their systems to their local electricity providers by January 31, 2024, to avoid any penalties, while remaining vigilant for the upcoming