As a rapidly developing country, there is an ever-growing demand for electricity in Cambodia. Unfortunately, electricity in Cambodia is still relatively costly in comparison to its regional neighbors, which affects the competitiveness of companies operating in the country. However, many companies have noticed that Cambodia’s climate is well-suited for solar energy and are moving toward the use of solar energy to satisfy their demand for sustainable electricity at lower prices.

The Cambodian government has also recognized the benefits and has recently adopted its first regulation on solar energy. In addition, the Cambodian government has legislation in the pipeline that provides incentives to companies investing in solar energy, which further reflects the government’s commitment to sustainable energy.

Regulatory Developments

The Cambodian government has been working for several years on a draft Environment and Natural Resources Code (Environmental Code), which will hopefully be adopted in the near future. The Environmental Code is a comprehensive piece of legislation that addresses various issues, such as environmental impact assessments, the use and protection of natural resources, and the use of sustainable energy.

In addition, in early 2018, the Electricity Authority of Cambodia (EAC) adopted the Regulations on the General Conditions for Connecting Solar PV Generating Sources to the Electricity Supply System of National Grid or to the Electrical System of a Consumer Connected to the Electricity Supply System of National Grid (Solar Regulation).

The Draft Environment and Natural Resources Code

We expect that once the Environmental Code is adopted, it will have a major impact on Cambodia’s regulatory framework, especially for sustainable energy. The draft Environmental Code currently provides rights and incentives that are very promising to the solar energy sector, including:

  • a right to connect to the national grid for companies and consumers using solar energy;
  • a requirement to develop regulations on net metering;
  • the establishment of a one-year pilot for a feed-in-tariff system, in which the government offers a fixed rate for solar energy fed into the grid; and
  • up to a 20% reduction in profit taxes for any company generating at least 20% of its own energy through sustainable sources.

The Solar Regulation

The Solar Regulation is not as forward-thinking as the Environmental Code, and does not provide similar incentives for solar energy. Instead, the Solar Regulation provides a regulatory framework where previous regulation was absent or unclear, and is therefore a welcome development.

The Solar Regulation addresses two types of solar systems, namely solar system projects that are a source to the national grid, and solar systems of consumers that are connected to the grid, but do not supply to the grid.

Providing Electricity to the National Grid

A solar system project must be included in the Power Development Master Plan of the Ministry of Mines and Energy before it can be connected to the grid (Article 3). If the project is not included in the Master Plan, the project must be evaluated by the Ministry of Mines and Energy, and Electricitie du Cambodge (EDC), which operates the national grid. If approved, the project will be included in the Master Plan.

The project’s investment and business conditions are subject to a project implementation agreement, but the regulation does not address this agreement in further detail. Lastly, the project must meet the technical standards and safety conditions in the Solar Regulation.

Any solar energy supplied to the national grid must be sold to EDC under a power purchase agreement (Article 4).

Consumers of Solar Power

Any legal person may operate a solar system for their own consumption if the system is not connected to the national grid (Article 5). In such a case, the person will not be bound by the technical standards and safety conditions in the Solar Regulation.

However, if a consumer wishes to operate a solar system while connected to the national grid, the consumer must be categorized as either a “big” or “bulk” consumer (Article 5). The thresholds for big and bulk consumers are set out in the Regulations on General Conditions of Supply of Electricity in the Kingdom of Cambodia, 2003:

  • Big consumers are those whose power is supplied at above 380 volts up to 22,000 volts
  • Bulk consumers are those whose power is supplied at above 22,000 volts

Subject to the approval of EDC, big and bulk consumers may connect their solar systems to the national grid; however, any solar energy generated can only be used for their own consumption. Feeding solar energy into the national grid as a consumer is only allowed in exceptional cases and is subject to written agreement from EDC and the approval of the EAC.

Concluding Remarks

Unfortunately, the Solar Regulation fails to incorporate the incentives of the draft Environmental Code and only allows large-scale solar initiatives to supply power to the grid in exceptional cases. However, the Solar Regulation clarifies that solar initiatives not connected to the grid are not regulated under the Solar Regulation, which provides individuals and companies freedom to use solar energy.

Although the Solar Regulation fails to address a number of key issues for the development of the solar industry, such as feed-in tariffs and net metering, it does provide clarity as to the regulatory framework for large-scale initiatives, and will hopefully spur investment in solar projects in Cambodia.

It is expected that the adoption of the Environmental Code and its implementing regulations will provide stronger incentives for investment in solar energy, including for smaller-scale projects.

RELATED INSIGHTS​ 

February 11, 2025
On January 24, 2025, the prime minister of Vietnam issued Decision No. 232/QD-TTg, approving the proposal for establishment and development of a carbon market in Vietnam. The decision establishes a compliance mechanism for greenhouse gas (GHG) emitters and creates opportunities for investors interested in carbon trading in Vietnam. Market Development Roadmap Decision 232 establishes a phased approach to developing Vietnam’s carbon market, with the following ambitious milestones: Before June 2025 (preparation period): The legal framework for trading of emissions quotas and carbon credits and a carbon-credit offset exchange mechanism will be developed, along with the necessary infrastructure for organization and operation of the carbon-credit market. From June 2025 to the end of December 2028 (pilot period): A pilot domestic carbon exchange will be launched, with continued legal refinements. From 2029 (official launch period): The carbon market will be fully operational. Carbon Market Structure and Trading Mechanisms Vietnam’s carbon market will function as a centralized, government-regulated exchange, trading two main assets: GHG emissions quotas (allowances) allocated to regulated emitters, which can be traded or auctioned; and Carbon credits generated from domestic and international projects that are certified for trading. The carbon credits generated from international projects include those originating from international exchange or offset-crediting mechanisms such as the Clean Development Mechanism (CDM), the Joint Credit Mechanism (JCM), and Article 6 of the Paris Agreement. The National Registration System for GHG emissions quotas and carbon credits will be primarily developed and operated by the Ministry of Natural Resources and Environment. Transactions of GHG emissions quotas and carbon credits will occur on the domestic carbon exchange, managed by the Hanoi Stock Exchange, and will follow a centralized process where verified quotas and credits receive unique domestic codes for trading and participants must have depository accounts. The Vietnam Securities Depository and Clearing Corporation
January 27, 2025
Thailand’s Ministry of Energy (MOE) has announced the launch of the 25th bidding round for petroleum exploration and production. This round offers nine greenfield onshore blocks—seven in northeastern Thailand and two in central Thailand—encompassing over 33,000 km². The bids can be submitted from July 1 to July 16, 2025. The sizes and locations of these blocks are: Northeast Thailand Block L1/66: 3,223.51 km² (Khon Kaen, Nong Bua Lam Phu, Udon Thani) Block L2/66: 3,917.03 km² (Kalasin, Sakon Nakhon, Udon Thani) Block L3/66: 3,918.22 km² (Kalasin, Khon Kaen, Maha Sarakham, Udon Thani) Block L4/66: 3,656.65 km² (Amnat Charoen, Mukdahan, Nakhon Phanom, Yasothon) Block L5/66: 3,436.01 km² (Chaiyaphum, Khon Kaen, Nakhon Ratchasima) Block L7/66: 3,438.51 km² (Buri Ram, Maha Sarakham, Nakhon Ratchasima, Roi Et, Surin, Khon Kaen) Block L9/66: 3,885.44 km² (Nakhon Ratchasima) Central Thailand Block L6/66: 3,966.86 km² (Chaiyaphum, Lop Buri, Phetchabun) Block L8/66: 3,957.41 km² (Kanchanaburi, Nakhon Pathom, Ratchaburi, Suphan Buri) Bidding Process Interested companies must submit their bids to the Department of Mineral Fuels (DMF) between July 1 and July 16, 2025. Bids should include: Application form (ChorThor/Por1) Proof of eligibility: Corporate documentation, audited financial statements, and proof of resources Technical and commercial proposals: Exploration plans, geological surveys, financial and work commitments, and special benefits such as signing bonuses of at least USD 100,000. There is a nonrefundable THB 50,000 application fee per block, and applicants must provide a bid bond of THB 3 million per block via an unconditional bank guarantee from a commercial bank with branches in Thailand, valid for at least one year from the bidding submission date. The guarantee will be returned to unsuccessful bidders upon request and to successful bidders upon the signing of the concession agreement. Eligibility Bidders must meet the following main eligibility criteria: Bidders must be limited companies with the following qualifications: The company must have the objective of
January 23, 2025
In 2023, compliance inspections by Vietnam’s Government Inspectorate identified several violations of policies and laws in the management and implementation of planning and investment in renewable energy projects. Since then, many renewable energy enterprises and projects have encountered significant operational challenges. In December 2024, the Ministry of Industry and Trade (MOIT) issued two reports, Report 321/BC-BCT and Report 345/BC-BCT, to implement the 2023 Inspection Conclusion of the Government Inspectorate and address obstacles faced by renewable energy enterprises, Investors in renewable energy projects in Vietnam should carefully consider the potential impacts of proposed solutions in these reports. The reports re-emphasize the types of violations related to renewable energy projects identified in the Inspection Conclusion, with a significant expansion in the number of affected projects. Key violations include: (i) misapplication of FIT (feed-in tariff) incentives; (ii) recognition of COD (commercial operation date) and receipt of FIT prices without written approval of construction acceptance; (iii) overlap with mineral planning, irrigation planning, national defense land use, or other restricted land uses; (iv) incomplete land procedures and documentation; and (v) installation of rooftop solar on agricultural and forestry land used for farming and aquaculture models. Further, these reports mention the government’s solutions to resolve difficulties for renewable energy projects, which include: Allowing additional planning where projects do not violate national security. Allowing rectification of projects’ violations in land and construction process as per law. For projects violating planning on minerals, irrigation, or defense, socio-economic efficiency will be assessed for adjustments or integration. Adjusting electricity prices and recovering incorrect FIT prices for projects not meeting conditions. Requiring rooftop solar projects on non-farming land to comply with regulations or, if land violations occur, FIT prices will be revoked, and electricity prices must be redetermined and recovered. For items (iv) and (v), the authority will issue regulations
January 14, 2025
Thailand’s Department of Industrial Works (DIW) has issued a new regulation (Ministerial Regulation Re: Designation of Type, Kind, and Size of Factories (No. 3) B.E. 2567 (2024)), which removes the factory license requirement for electricity generation from solar energy installations on rooftops, roof decks, or any part of a building used for residential or other purposes, regardless of capacity. The new rules took effect on December 28, 2024. Under the previous regulations, solar rooftop installations had to seek approval from the DIW if their capacity exceeded 1,000 kW (1 MW), which added time and administrative costs when adopting renewable energy solutions. Benefits and Further Compliance The updated regulation benefits industrial operators by facilitating faster installation times and lower costs, as solar rooftops can now be installed without the need for prior approval of a factory license from the DIW. Operators can now more easily contribute to environmental sustainability and carbon reduction efforts. Despite the lifting of the factory licensing requirement, other compliance obligations, such as an energy business license (or exemption from an energy business license), a controlled energy production license, and a construction permit, may still apply. Reason for the Change Removing the classification of rooftop or building-installed solar power plants as factories aligns with Thailand’s renewable energy goals and reduces regulatory burdens for industrial operators. Additionally, it supports the achievement of energy policies aligned with the UN’s Sustainable Development Goals and Thailand’s international commitments to reduce greenhouse gas emissions through the participation of all sectors. For further details on how this change affects business operations or to explore strategies for renewable energy implementation, please contact Supasit Boonsanong at [email protected], Charuwan Charoonchitsathian at [email protected], or Phareeya Yongpanich at [email protected].