You are using an outdated browser and your browsing experience will not be optimal. Please update to the latest version of Microsoft Edge, Google Chrome or Mozilla Firefox. Install Microsoft Edge

May 17, 2019

Amendments to Thailand’s Factory Act

The Factory Act (No. 2) B.E. 2562 (2019) and Factory Act (No. 3) B.E. 2562 (2019) were published in Thailand’s Government Gazette  on April 30, 2019. These will amend the Factory Act B.E. 2535 (1992). The Factory Act (No. 2) will become effective 180 days after publication—that is, on October 27, 2019—while The Factory Act (No. 3) became effective on May 1, 2019. 

The main changes introduced by Act (No. 3) are administrative, laying down the definitions, appointment procedures, and duties and responsibilities of the local government authorities tasked with enforcing the law related to factories. 

The key amendments of Act (No. 2), which has a more practical impact on business operators, are laid out below.

Definitions

Under the new legislation, the definition of “factory” is updated to mean a building, place, or vehicle using machinery of 50 horsepower or more, or having a minimum of 50 workers (increased from 5 horsepower or 7 workers under the previous legislation), with or without machinery, in its operations. In addition, “construction of buildings” will no longer fall within the definition of “factory set-up.”

Increased Exemptions

The following types of factories will now be partially exempted from complying with the Factory Act: 

  1. A factory belonging to a governmental authority;
  2. A factory for study and research;
  3. A factory for training at an education institute;
  4. A family-owned factory; and
  5. A factory necessary for or related to a non-factory business and located in the same space.

License Renewal

Prior to the amendment, a factory license was valid for a period of five years from the start of operations, subject to certain exceptions. However, under Act (No. 2) a factory license will not expire until the factory ceases doing business.

Private Inspector

Act (No. 2) authorizes machinery and factory inspection duties to be carried out by private inspectors who are qualified and licensed in accordance with requirements laid down in Act (No. 2).

These amendments mean that business operators will be able to set up factories with greater ease. The amendments will also apply to all currently valid factory licenses as well as applications now under consideration.

For more information on the Acts, or for any other enquiries, please contact our Bangkok office at [email protected] or +66 2056 5555.

RELATED INSIGHTS​ 

December 4, 2025
Thailand’s Department of Business Development (DBD), through its Office of Central Company and Partnership Registration, has released multiple draft orders for public consultation until December 12, 2025. These draft orders aim to strengthen the business registration process, with a focus on the requirements for establishing and amending the principal office address of a partnership or limited company, verification of authorized signatories, and measures to identify and prevent registrations involving persons linked to suspicious or high-risk activities. The draft orders’ proposed requirements are outlined below. Principal Office Verification The principal office address of a partnership or limited company, including house registration code, house number, full address details, and building name, must be fully aligned with the civil registry. The registrar will strictly verify this before accepting any registration or amendment. If the address used for registration is already registered for at least five other companies, the company must submit a consent letter from the person authorized to allow use of the principal office, along with supporting documents proving the right to use the address. Signatory Certification Compliance Duties Persons certifying directors’ signatures on registration forms are responsible for verifying their identities, maintaining up-to-date information, and complying with the requirements of the DBD’s Biz Regist digital registration system. Certain supporting documents proving the qualifications of certifying persons are also required, with some exceptions for specific professional roles. Identity and qualification verification must be renewed upon the completion of one year from the date of registration as a certifying person, or if the certification credentials expire before the one-year period ends, in accordance with the verification requirements. Verification of Suspicious Parties Any partner, shareholder, or director linked to a predicate offense will be required to meet with the registrar in person for further verification steps. For all parties related to a company
December 2, 2025
Investing in Mainland Southeast Asia is Tilleke & Gibbins’ essential guide for investors looking to do business in this vibrant region, whether it’s starting operations as a newly established entity or expanding into new territories or business models.
November 28, 2025
On November 26, 2025, the government of Vietnam issued Resolution No. 8/2025/NQ-CP to extend and expand the pilot program allowing Vietnamese citizens who meet certain conditions to gamble at three integrated casino resorts in Vietnam: Corona Resorts & Casino Phu Quoc (An Giang Province) – Effective immediately, and continuing an ongoing pilot program that started in 2019. The Grand Casino Ho Tram (Ho Chi Minh City) – New pilot program for five years starting November 26, 2025. Van Don Integrated Casino & Tourism Complex (Quang Ninh Province) – New pilot program for five years from the date the casino receives its license. The pilot program was originally established under Decree No. 03/2017/ND-CP on casino business, which also sets out the specific eligibility conditions for Vietnamese citizens. After the pilot period, these projects must stop allowing Vietnamese players until the government issues further decisions. This expansion of the pilot program comes after Vietnam’s Ministry of Finance (MOF) released a draft decree earlier this year proposing significant changes to the regulatory framework governing casino operations. These revisions, which focus on increasing fiscal contributions from local players and strengthening compliance obligations for casino operators nationwide, are detailed below. Proposed Increase in Casino Entry Fees for Vietnamese Players The draft decree increases the entry fees applicable to Vietnamese citizens permitted to play at casinos. Under the current regulations, Vietnamese players are required to pay an entry fee of VND 1 million (approx. USD 38) for 24 consecutive hours or VND 25 million (approx. USD 950) per month. The draft decree proposes increasing these fees to VND 2.5 million (approx. USD 95) for 24 consecutive hours and VND 50 million (approx. USD 1,900) per month, effectively doubling the existing amounts and marking the first major fee revision since the pilot program allowing Vietnamese players
November 21, 2025
On November 17, 2025, Thailand’s Ministry of Interior introduced significant regulatory changes to make rooftop solar adoption easier and more cost-effective for property owners. Ministerial Regulation No. 72 B.E. 2568 (2025), issued under the Building Control Act B.E. 2522 (1979), was published in the Government Gazette on November 19, 2025, with immediate effect. Background Under the Building Control Act (BCA), any alteration made to a building requires either notification of the relevant authority or application for a building alteration permit—unless the alteration falls under a separate list of exceptions specified in the ministerial regulations issued under the BCA. In 2015, installation of solar rooftops on any residential building under 160 square meters was added to this list of exceptions, subject to inspection and notification requirements. The newly enacted regulation now eliminates many of these requirements and introduces a broader and more permissive framework to promote solar adoption nationwide. Key Changes Specifically, the regulation introduces three major changes: Expanded exemption from the definition of “building alteration”: The installation of solar panels on any building roof—regardless of the type of building or the total area of the installation—is no longer considered a building alteration under the BCA, provided that the total weight of the installation does not exceed 20 kg/m2. Removal of structural integrity certification requirement: The new regulation eliminates the obligation to obtain a structural stability certificate from a licensed civil engineer. Removal of notification requirement: Property owners or possessors are no longer required to notify the local authority before installation of a solar rooftop. Impact This significant streamlining of requirements for solar rooftop installation is expected to accelerate the adoption of renewable energy in the country, particularly for residential and commercial properties—similar to the way Thailand’s December 2024 removal of licensing requirements for factory solar rooftop installations encouraged such