In 2015, the Ministry of Energy revised its Power Development Plan in order to provide a blueprint for Thailand’s energy priorities over the coming two decades. The PDP2015, as the Power Development Plan was called, was itself an update on previous development plans created by the Ministry of Energy in conjunction with the Electricity Generating Authority of Thailand (EGAT), which had last been updated in 2012. Consistent with this pattern, the Power Development Plan will be updated again in 2018 to revise the Ministry’s objectives in light of new facts on the ground.

The PDP2015 was devised as a government master plan alongside the Energy Efficiency Development Plan, the Alternative Energy Development Plan (AEDP), the Natural Gas Supply Plan, and the Petroleum Management Plan. The overarching objectives of the Ministry of Energy’s plans were set as: (1) energy security; (2) economy, and specifically maintaining appropriate costs of power generation and implementing energy efficiency; and (3) ecology, with a particular focus on reducing environmental and social impacts by lessening carbon dioxide intensity of power generation. In order to achieve these objectives, the Ministry of Energy realized that renewable energy sources would have to play a significant role.

AEDP2015

At the end of 2014, Thailand had installed capacity of 7,400.43 megawatts (MW) from renewable energy sources, including hydroelectricity. Of this, solar capacity amounted to 1,298.51 MW, whereas installed wind capacity only amounted to 224.47 MW. The Ministry of Energy set targets for renewable energy constituting approximately 20% of Thailand’s installed capacity by 2036. Targets for 2036 installed capacity for wind and solar were set at 3,002 MW and 6,000 MW, respectively. Given the state of renewables in Thailand at the time, these goals seemed fairly ambitious and many questioned whether the targets were overly optimistic.

By the end of 2017, it has become clear that the naysayers’ pessimism was misplaced. At the end of 2017, installed capacity for wind power had nearly tripled from 2014 levels, to 627.82 MW. Capacity for solar power was 2,692.26 MW at the end of 2017, which amounts to a doubling of generating capacity from 2014. The three years from 2014 to 2017 also saw increased capacity for power plants fueled by biomass, biogas, and municipal solid waste.

With Thailand already nearly halfway to its goal of 6,000 MW of installed solar capacity by 2036, and both demand and supply of solar power showing no signs of slowing down, the target appears to require upward revision. A revised target should be expected in the PDP2018. A report issued in November 2017 by the International Renewable Energy Agency (IRENA) puts 17,200 MW of installed solar photovoltaic (PV) capacity by 2036 as a realistic objective.

Policy Hurdles

Thailand is in the midst of a renewable energy revolution. Just three years ago it seemed fanciful to imagine renewable sources of energy accounting for approximately 20% of Thailand’s installed capacity by 2036; now, it seems feasible to imagine nearly half of the country’s installed capacity coming from renewables in 20 years. Given the abundance of solar energy potential, it is clear that solar PV will be the most significant driver of this revolution. Other renewable sources, such as wind and biomass, will also play significant roles in Thailand’s diversified energy mix. This will present the Ministry of Energy with a number of challenges which will require apt policy-making.

First is the problem of intermittency. Some renewable sources, most notably solar and wind power, can only produce electricity when weather conditions permit. Without sufficient baseload sources of energy, an overreliance on intermittent electricity generating sources may result in rolling blackouts. Technological advances with respect to energy storage, such as through more efficient batteries or pumped storage hydroelectricity, have the potential to reduce the impact of intermittency. The Ministry of Energy has taken the initiative to address this concern by instituting new firm or semi-firm capacity requirements in power purchase agreements (PPAs) with small power producers or very small power producers. The commitments in these PPAs essentially require the power producer to commit to certain specific feed-in targets. This may spur innovation with respect to storage, or lead to further hybrid power producing facilities with multiple fuel sources.

Secondly, the Ministry of Energy must contend with the untapped potential of rooftop solar PV installments in Thailand. At the moment, the inability of most producers to sell electricity generated by rooftop solar PV cells to a power distributor makes it economically difficult to justify incurring the still significant expense of installing PV panels. For factories or large business centres, where electricity use is highest during daylight hours, the economic case is much clearer as most of the electricity which is generated will be consumed immediately. For most residential buildings, by contrast, electricity use is generally higher when the sun is not shining. Without the ability to sell the electricity back to a distributor, there is little incentive for households to install rooftop solar PV panels. The Ministry of Energy has indicated a willingness to introduce a net metering scheme; the challenge will be to ensure that the feed-in-tariff rate is neither too low so as to not properly incentivize households, nor too high so as to cause a strain on government resources.

Conclusion

In 2015, the Ministry of Energy set ambitious targets for renewable energy development in Thailand. It appears now that the 2015 targets were too conservative, and that they will be met ahead of schedule. Thailand’s pivot toward renewables satisfies each of the stated objectives in the PDP2015, namely energy security, economy, and ecology. While a number of policy challenges remain, the potential for continued growth in Thailand’s renewable energy sector is evident.

Related Professionals

RELATED INSIGHTS​

July 24, 2024
Experts from Tilleke & Gibbins’ intellectual property team have contributed an updated Intellectual Property Transactions in Vietnam to Thomson Reuters Practical Law, a high-level comparative overview of  laws and regulations across multiple jurisdictions. Intellectual Property Transactions focuses on business-related aspects of intellectual property, such as the value of intellectual assets in M&A transactions, and the licensing of IP portfolios. Key topics covered in the chapter include: IP assignment: Basis and formalities for assignments of patents, utility models, trademarks, copyright, design rights, trade secrets, confidential information, and domain names. IP licensing: Scope and formalities for licensing patents, utility models, trademarks, copyright, design rights, and trade secrets. Research and development collaborations. IP audits. IP aspects of M&A: Due diligence, warranties/indemnities, and transfer of IPRs. Employee and consultant agreements. Practical Law, a legal reference resource from Thomson Reuters, publishes a range of guides for hundreds of jurisdictions and practice areas. The Intellectual Property Transactions Global Guide is a valuable resource for legal practitioners, covering numerous jurisdictions worldwide. To view the latest version of the Intellectual Property Transactions in Vietnam overview, please visit the Practical Law website and enroll in the free Practical Law trial to gain full access.
July 24, 2024
Intellectual property specialists from Tilleke & Gibbins in Thailand have contributed an updated Intellectual Property Transactions in Thailand overview for Thomson Reuters Practical Law, an online publication that provides comprehensive legal guides for jurisdictions worldwide. The Thailand overview was authored by Darani Vachanavuttivong, managing partner of Tilleke & Gibbins and managing director of the firm’s regional IP practice; Titikaan Ungbhakorn, senior associate and patent agent; and San Chaithiraphant, senior associate. The chapter delivers a high-level examination of critical aspects of IP law, including IP assignment and licensing, research and development collaborations, IP in mergers and acquisitions (M&A), securing loans with intellectual property rights, settlement agreements, employee-related IP issues, competition law, taxation, and non-tariff trade barriers. Key topics covered in the chapter include: IP assignment: Basis and formalities for assignments of patents, utility models, trademarks, copyright, design rights, trade secrets, confidential information, and domain names. IP licensing: Scope and formalities for licensing patents, utility models, trademarks, copyright, design rights, and trade secrets. Research and development collaborations: Management of improvements, derivatives, and joint ownership of IP. IP aspects of M&A: Due diligence and critical considerations during mergers and acquisitions. Practical Law, a legal reference resource from Thomson Reuters, publishes a range of guides for hundreds of jurisdictions and practice areas. The Intellectual Property Transactions Global Guide is a valuable resource for legal practitioners, covering numerous jurisdictions worldwide. To view the latest version of the Intellectual Property Transactions in Thailand overview, please visit the Practical Law website and enroll in the free Practical Law trial to gain full access.
July 24, 2024
Acted as lead counsel for Nordic Transport Group A/S (NTG), an international freight forwarding company based in Denmark, in its acquisition of a stake in Asia-based Freightzen Logistics Ltd., Inc. through a newly established subsidiary, NTG APAC Holding Pte. Ltd.
July 23, 2024
In the Who’s Who Legal (WWL) Southeast Asia guide for 2024, a total of 12 Tilleke & Gibbins lawyers have been distinguished as market leaders in various legal practice areas. The firm’s 12 recognized lawyers, singled out for their commitment to delivering exceptional legal services to Tilleke & Gibbins’ clients, are grouped into seven practice areas: Asset Recovery: Thawat Damsa-ard Data: Alan Adcock, Athistha (Nop) Chitranukroh Franchise: Alan Adcock, Jay Cohen Intellectual Property: Alan Adcock (Patents, Trademarks), Darani Vachanavuttivong (Patents, Trademarks), Kasama Sriwatanakul (Trademarks), Linh Thi Mai Nguyen (Trademarks), Somboon Earterasarun (Trademarks), Wongrat Ratanaprayul (Patents) Investigations: John Frangos and Thawat Damsa-ard Labor, Employment, and Benefits: Pimvimol (June) Vipamaneerut Life Sciences: Alan Adcock, Loc Xuan Le The annual WWL Southeast Asia rankings guide, published by the London-based group Law Business Research, aims to identify the foremost legal practitioners across a range of business law practice areas. The rankings are largely based on feedback and nominations received from other WWL-ranked and nominated attorneys around the world. These peer-driven recognitions highlight Tilleke & Gibbins’ dedication to maintaining the highest standards of legal service and helping clients achieve success. To read more about the WWL Southeast Asia guide, or to browse the full results, please visit the WWL website.